MIDLAND SH 191 (2296-02-026)

Items: 189

County: MIDLAND
Length: N/A
Highway: SH 191
District: ODESSA
Control Number: 2296-02-026
DBE Goal: N/A
Project: C 2296-2-26
Guaranty: N/A
Time: 580 WORKING DAYS
Engineer's Estimate: $27,487,949.23
Date: 01/07/2022 (4 years ago)
Contract Number: N/A
Type: CONSTRUCT BRIDGE
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice HCS Excel Tabs Print Print Notice
Documents:
Bidders (4)
E
Engineer's Estimate
$27,487,949.23
$27,535,249.62
Over/Under Est: 0.17% $47,300.39
Over/Under Est: 6.94% $1,908,625.47
Amt Left: 6.76% $1,861,325.08
$30,483,616.20
Over/Under Est: 10.9% $2,995,666.97
Amt Left: 10.71% $2,948,366.58
Delta: -3.70% -$1,087,041.50
Over/Under Est: 26.92% $7,399,250.77
Amt Left: 26.7% $7,351,950.38
Delta: -14.45% -$4,403,583.80
Subcontractor Percentage Amount
WILLIS ELECTRIC CO., LP 3.32% $934,816.41
BARRICADES UNLIMITED 1.58% $444,882.51
JB PINNACLE GROUP, LLC 1.24% $349,148.30
COUGHLIN COMPANY I, INC. 1.21% $340,701.16
M & D FOUNDATION DRILLING INDUSTRIES, INC. 1.07% $301,281.19
TRP CONSTRUCTION GROUP, LLC 1.01% $284,386.92
DK CONTRACTING, LLC 0.97% $273,124.07
HJC FARMS, INC. 0.96% $270,308.36
RPV CONSTRUCTION, LLC 0.68% $191,468.42
J. H. ODEN CONTRACTING COMPANY 0.34% $95,734.21
S & S BRIDGE PAINTING, INC. 0.22% $61,945.67
FIBERTEX, LLC 0.17% $47,867.11
FUSION COMMUNICATIONS, LLC 0.17% $47,867.11
WOLFE CONSTRUCTION GROUP, INCORPORATED 0.15% $42,235.68
LENZO COMMERCIAL CONCRETE, INC. 0.14% $39,419.97
TORO BRAVO CONSTRUCTION, LLC 0.07% $19,709.98
RUBIO'S PAVING 0.06% $16,894.27
DOUBLE A CONTRACTING, L.P. 0.03% $8,447.14
K. L. DURHAM CONSTRUCTION, L.L.C. 0.02% $5,631.42
GARY A. CRAIN, INC. 0.02% $5,631.42
Total: 13.43% $3,781,501.32

Bid Items & Bid Tabulations

189 Total 0 of 189
MIDLAND  |  SH 191  |  ODESSA  |  2296-02-026  |  01/07/2022  |  $27,487,949.23  |  C 2296-2-26  |  CONSTRUCT BRIDGE  |  580 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
REECE ALBERT, INC.
JONES BROS. DIRT & PAVING CONTRACTORS, INC.
FNF CONSTRUCTION, INC.
SUNDT CONSTRUCTION, INC.
PREPARING ROW
AC 8.300 $7,800.000 $906.230 $3,000.000 $1,400.000 $20,000.000
REMOVING CONC (RIPRAP)
SY 751.000 $12.250 $13.660 $6.000 $12.000 $15.000
REMOVING CONC (DRIVEWAYS)
SY 784.000 $15.000 $17.530 $20.000 $15.000 $22.000
REMOVING CONC (CURB OR CURB & GUTTER)
LF 387.000 $4.700 $7.810 $9.000 $11.000 $4.000
REMOVING CONC (SIDEWALK OR RAMP)
SY 27.000 $23.000 $12.730 $25.000 $20.000 $35.000
REMOVING STAB BASE & ASPH PAV (7"-12")
SY 3,109.000 $3.950 $7.120 $10.000 $5.000 $9.000
REMOVING STAB BASE & ASPH PAV (0-6")
SY 1,096.000 $4.500 $10.300 $10.250 $3.000 $8.000
REMOVING STAB BASE & ASPH PAV (12"-14")
SY 34,671.000 $6.000 $1.210 $2.600 $5.000 $1.000
EXCAVATION (ROADWAY)
CY 81,168.000 $8.500 $8.480 $9.000 $12.000 $6.000
EXCAVATION (CHANNEL)
CY 4,473.000 $11.000 $5.960 $17.500 $12.000 $8.000
EMBANKMENT (FINAL)(DENS CONT)(TY C)
CY 229,869.000 $14.500 $14.120 $11.000 $18.000 $12.350
BLADING
HR 50.000 $175.000 $224.900 $325.000 $120.000 $185.000
SPEC EXCAV WORK (HYD EXCAVATOR)
HR 42.000 $90.000 $313.480 $131.250 $110.000 $185.000
DRILL SEEDING (PERM) (RURAL) (SANDY)
SY 205,193.000 $0.150 $0.100 $0.110 $0.150 $0.110
DRILL SEEDING (TEMP) (WARM)
SY 102,597.000 $0.150 $0.080 $0.080 $0.150 $0.090
DRILL SEEDING (TEMP) (COOL)
SY 102,597.000 $0.150 $0.100 $0.110 $0.150 $0.110
SOIL RETENTION BLANKETS (CL 1) (TY C)
SY 2,200.000 $0.910 $1.520 $1.580 $3.000 $1.600
PROOF ROLLING
HR 50.000 $130.000 $66.300 $125.000 $80.000 $120.000
FL BS (CMP IN PLC)(TY A GR 4) (6")
SY 59,534.000 $7.500 $5.630 $6.500 $7.500 $11.000
PRIME COAT (AE-P)
GAL 12,028.000 $4.500 $4.250 $3.700 $4.000 $6.000
FOG SEAL (CSS-1H)
GAL 29,713.000 $3.300 $4.050 $3.700 $2.000 $4.500
AGGR(TY-PB GR-3 SAC-B)
CY 1,220.000 $80.000 $135.870 $108.000 $108.000 $225.000
AGGR(TY-PB GR-4 SAC-B)
CY 1,444.000 $90.000 $129.400 $97.000 $109.000 $225.000
ASPH (AC-20-5TR OR CRS-2P)
GAL 102,280.000 $3.500 $3.990 $3.850 $4.000 $5.000
STONE-MTRX-ASPH SMAR-F SAC-A
TON 11,966.000 $115.000 $127.620 $114.000 $140.000 $184.000
FLEXIBLE PAVEMENT STRUCTURE REPAIR(6")
SY 33,334.000 $30.000 $46.700 $40.000 $11.000 $56.000
CONC PVMT (CONT REINF - CRCP) (6")
SY 589.000 $60.000 $108.450 $102.900 $110.000 $110.000
STRUCT EXCAV (PIPE)
CY 2,550.000 $5.000 $3.170 $36.750 $17.000 $1.000
CEM STABIL BKFL
CY 992.000 $120.000 $58.160 $228.200 $200.000 $160.000
CUT & RESTORE ASPH PAVING
SY 271.000 $70.000 $84.240 $288.750 $170.000 $300.000
TRENCH EXCAVATION PROTECTION
LF 413.000 $3.500 $1.230 $31.500 $8.000 $1.000
TEMPORARY SPL SHORING
SF 1,080.000 $16.000 $10.780 $7.500 $55.000 $40.000
DRILL SHAFT (36 IN)
LF 648.000 $230.000 $290.010 $358.050 $410.000 $335.000
DRILL SHAFT (72 IN)
LF 288.000 $650.000 $960.260 $887.250 $920.000 $800.000
DRILL SHAFT (SIGN MTS) (12 IN)
LF 21.000 $125.000 $151.820 $157.500 $175.000 $140.000
DRILL SHAFT (SIGN MTS) (24 IN)
LF 108.000 $190.000 $172.060 $178.500 $185.000 $180.000
DRILL SHAFT (RDWY ILL POLE) (30 IN)
LF 440.000 $250.000 $268.220 $278.250 $280.000 $230.000
DRILL SHAFT (TRF SIG POLE) (24 IN)
LF 54.000 $200.000 $232.790 $241.500 $245.000 $220.000
DRILL SHAFT (TRF SIG POLE) (36 IN)
LF 13.000 $325.000 $394.740 $409.500 $450.000 $350.000
DRILL SHAFT (TRF SIG POLE) (48 IN)
LF 66.000 $485.000 $490.890 $509.250 $550.000 $515.000
CL C CONC (ABUT)
CY 114.400 $950.000 $980.740 $1,050.000 $1,400.000 $1,250.000
CL C CONC (CAP)
CY 238.800 $1,090.000 $703.040 $1,050.000 $1,500.000 $1,050.000
CL C CONC (COLUMN)
CY 185.400 $990.000 $1,001.540 $1,417.500 $1,600.000 $1,100.000
CL C CONC (RAIL FOUNDATION)
CY 596.200 $355.000 $610.180 $577.500 $500.000 $570.000
REINF CONC SLAB (HPC)
SF 26,800.000 $19.000 $27.400 $24.150 $29.000 $25.000
APPROACH SLAB
CY 122.000 $575.000 $678.080 $682.500 $650.000 $700.000
RETAINING WALL (MSE)
SF 60,187.000 $45.000 $33.500 $53.810 $32.000 $63.650
PRESTR CONC GIRDER (TX54)
LF 3,255.000 $180.000 $226.420 $255.150 $300.000 $235.000
RIPRAP (CONC)(4 IN)
CY 194.000 $500.000 $560.440 $634.640 $670.000 $690.000
RIPRAP (CONC)(5 IN)
CY 1,788.000 $450.000 $494.290 $563.850 $500.000 $580.000
RIPRAP (CONC)(6 IN)
CY 17.000 $525.000 $556.150 $630.000 $620.000 $600.000
RIPRAP (CONC)(FLUME)
CY 387.000 $550.000 $551.480 $619.500 $610.000 $700.000
RIPRAP (MOW STRIP)(4 IN)
CY 364.000 $525.000 $507.370 $695.710 $750.000 $820.000
RAIL (TY T223)
LF 54.000 $160.000 $195.660 $315.000 $190.000 $300.000
RAIL (TY SSTR)
LF 5,823.100 $53.000 $58.700 $73.500 $75.000 $60.000
SEALED EXPANSION JOINT (4 IN) (SEJ - M)
LF 156.000 $155.000 $162.630 $172.200 $190.000 $200.000
CONC BOX CULV (7 FT X 4 FT)
LF 349.000 $510.000 $589.260 $1,391.250 $600.000 $640.000
CONC BOX CULV (7 FT X 4 FT)(EXTEND)
LF 28.000 $850.000 $1,306.160 $1,365.000 $650.000 $2,000.000
CONC BOX CULV (8 FT X 3 FT)
LF 1,065.000 $530.000 $523.550 $1,417.500 $700.000 $635.000
RC PIPE (CL III)(12 IN)
LF 1,381.000 $60.000 $40.060 $86.100 $50.000 $65.000
RC PIPE (CL III)(18 IN)
LF 75.000 $65.000 $66.780 $92.400 $90.000 $155.000
RC PIPE (CL III)(24 IN)
LF 4,059.000 $80.000 $68.570 $109.200 $80.000 $115.000
INLET (COMPL)(PCO)(5FT)(NONE)
EA 4.000 $6,600.000 $3,967.180 $8,662.500 $7,000.000 $5,000.000
INLET (COMPL)(PCO)(5FT)(LEFT)
EA 1.000 $6,500.000 $5,502.870 $9,266.250 $10,000.000 $6,500.000
INLET (COMPL)(PSL)(RC)(4FTX4FT)
EA 1.000 $4,800.000 $4,274.900 $7,239.750 $7,000.000 $5,800.000
INLET (COMPL)(PSL)(FG)(4FTX4FT-3FTX3FT)
EA 1.000 $5,300.000 $4,752.200 $8,111.250 $8,000.000 $5,200.000
WINGWALL (PW - 1) (HW=5 FT)
EA 2.000 $14,500.000 $19,096.310 $29,253.000 $19,000.000 $33,000.000
WINGWALL (PW - 1) (HW=6 FT)
EA 1.000 $16,500.000 $20,930.050 $50,019.900 $20,000.000 $47,000.000
WINGWALL (PW - 1) (HW=8 FT)
EA 1.000 $24,000.000 $27,974.760 $52,842.300 $33,000.000 $100,000.000
WINGWALL (PW - 1) (HW=9 FT)
EA 2.000 $34,000.000 $27,904.730 $51,975.000 $32,000.000 $92,000.000
SET (TY I) (24 IN) (4: 1) (C)
EA 1.000 $4,500.000 $7,900.580 $5,040.000 $8,300.000 $10,000.000
SET (TY II) (12 IN) (RCP) (6: 1) (P)
EA 8.000 $750.000 $1,221.400 $3,596.250 $1,300.000 $2,300.000
SET (TY II) (24 IN) (RCP) (6: 1) (C)
EA 1.000 $2,450.000 $2,964.300 $3,937.500 $1,700.000 $2,000.000
SET (TY II) (24 IN) (RCP) (6: 1) (P)
EA 18.000 $1,550.000 $1,570.250 $3,937.500 $1,700.000 $2,000.000
REMOV STR (INLET)
EA 1.000 $1,200.000 $245.120 $4,672.500 $600.000 $724.850
REMOV STR (WINGWALL)
EA 4.000 $2,000.000 $2,849.550 $6,058.500 $1,600.000 $1,800.000
REMOV STR (BOX CULVERT)
LF 1,703.000 $70.000 $38.770 $36.750 $71.000 $85.000
MOBILIZATION
LS 1.000 $2,498,904.480 $1,790,930.080 $1,100,000.000 $3,041,000.000 $3,484,214.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 29.000 $18,500.000 $2,948.660 $7,500.000 $35,000.000 $5,000.000
CONSTRUCTION EXITS (INSTALL) (TY 1)
SY 112.000 $30.000 $22.670 $31.000 $50.000 $35.000
CONSTRUCTION EXITS (REMOVE)
SY 112.000 $9.000 $5.040 $25.000 $10.000 $8.000
BIODEG EROSN CONT LOGS (INSTL) (18")
LF 14,372.000 $4.500 $5.820 $9.000 $6.000 $7.500
BIODEG EROSN CONT LOGS (REMOVE)
LF 14,372.000 $1.300 $1.010 $1.000 $1.250 $1.000
CONSTRUCTING DETOURS
SY 22,319.000 $45.000 $38.220 $48.000 $50.000 $65.000
PTB(FRN&INSTL)(SSCB OR CSB)(TY1)OR(STL)
LF 20,310.000 $40.000 $56.400 $37.970 $11.000 $40.000
PTB(MOVE)(SSCB OR CSB)(TY1)OR(STL)
LF 8,310.000 $5.000 $6.730 $13.130 $2.000 $4.000
PTB(REMOVE)(SSCB OR CSB)(TY1)OR(STL)
LF 20,310.000 $7.500 $7.480 $15.750 $4.000 $3.000
CONC CURB & GUTTER (TY II)
LF 3,721.000 $20.000 $19.740 $27.300 $35.000 $33.000
CONC CURB (MONO) (TY II) (MOD)
LF 3,178.000 $27.500 $30.810 $36.750 $40.000 $30.000
CONC SIDEWALKS (4")
SY 38.000 $72.000 $96.830 $82.950 $110.000 $135.000
CURB RAMPS (TY 1)
SY 84.000 $125.000 $110.500 $157.500 $150.000 $280.000
CURB RAMPS (TY 21)
SY 6.000 $350.000 $191.100 $199.500 $425.000 $550.000
RUMBLE STRIPS (SHOULDER) ASPHALT
LF 11,565.000 $0.410 $0.250 $0.260 $0.350 $0.650
MTL W-BEAM GD FEN (STEEL POST)
LF 4,075.000 $28.000 $34.410 $39.380 $47.000 $32.000
MTL BEAM GD FEN TRANS (THRIE-BEAM)
EA 1.000 $2,445.000 $3,744.940 $3,123.750 $2,700.000 $2,400.000
DOWNSTREAM ANCHOR TERMINAL SECTION
EA 9.000 $1,430.000 $1,518.220 $1,811.250 $2,000.000 $1,400.000
CABLE BARRIER SYSTEM (TL-4)
LF 2,260.000 $10.000 $12.650 $13.130 $14.000 $13.000
CABLE BARRIER TERMINAL SECTION (TL-4)
EA 4.000 $3,475.000 $3,542.510 $3,675.000 $4,800.000 $3,600.000
REMOVE CABLE BARRIER
LF 3,692.000 $5.000 $5.060 $5.250 $6.000 $5.500
REMOVE CABLE BARRIER TERMINAL SECTION
EA 2.000 $450.000 $506.080 $525.000 $680.000 $650.000
GUARDRAIL END TREATMENT (INSTALL)
EA 10.000 $3,000.000 $3,340.080 $3,675.000 $4,500.000 $3,200.000
CRASH CUSH ATTEN (MOVE & RESET)
EA 9.000 $1,000.000 $500.070 $2,625.000 $600.000 $625.000
CRASH CUSH ATTEN (REMOVE)
EA 7.000 $650.000 $202.520 $105.000 $1,050.000 $500.000
CRASH CUSH ATTEN (INSTL)(L)(N)(70)
EA 4.000 $29,870.000 $37,906.790 $43,575.000 $48,000.000 $40,000.000
CRASH CUSH ATTEN (INSTL)(S)(N)(TL3)
EA 7.000 $7,250.000 $9,406.880 $7,875.000 $700.000 $9,000.000
PIPE UNDERDRAINS (TY 6) (6")
LF 1,051.000 $19.000 $6.760 $90.000 $16.850 $22.000
REMOVE RD IL ASM (TRANS-BASE)
EA 16.000 $500.000 $354.250 $367.500 $435.000 $500.000
REPLACE LUMINAIRE W/LED (250W EQ)
EA 3.000 $605.000 $607.290 $630.000 $700.000 $625.000
IN RD IL (U/P) (TY 1) (150W EQ) LED
EA 4.000 $1,725.000 $1,290.490 $1,338.750 $1,500.000 $2,000.000
IN RD IL (U/P) (TY 2) (150W EQ) LED
EA 4.000 $1,200.000 $1,568.830 $1,627.500 $1,900.000 $1,900.000
IN RD IL (TY AL) 40T-8 (250W EQ) LED
EA 55.000 $4,200.000 $4,655.870 $4,830.000 $5,500.000 $4,000.000
CONDT (PVC) (SCH 40) (2")
LF 19,610.000 $9.000 $9.110 $9.450 $11.000 $13.000
CONDT (PVC) (SCH 40) (3")
LF 940.000 $16.000 $24.290 $25.200 $25.000 $16.000
CONDT (PVC) (SCH 80) (2") (BORE)
LF 2,005.000 $25.000 $25.300 $26.250 $26.000 $30.000
CONDT (PVC) (SCH 80) (3") (BORE)
LF 935.000 $27.000 $35.430 $36.750 $36.000 $28.000
CONDT (RM) (1 1/4")
LF 380.000 $25.000 $45.550 $47.250 $46.000 $26.000
ELEC CONDR (NO.12) BARE
LF 420.000 $0.950 $1.420 $1.470 $1.500 $1.100
ELEC CONDR (NO.12) INSULATED
LF 840.000 $1.250 $1.520 $1.580 $1.600 $1.400
ELEC CONDR (NO.8) BARE
LF 21,195.000 $1.500 $1.620 $1.680 $1.700 $1.700
ELEC CONDR (NO.8) INSULATED
LF 47,110.000 $1.750 $1.720 $1.790 $1.800 $2.200
GROUND BOX TY A (122311)W/APRON
EA 47.000 $1,110.000 $1,366.400 $1,417.500 $1,400.000 $1,100.000
GROUND BOX TY D (162922)W/APRON
EA 12.000 $1,100.000 $1,720.650 $1,785.000 $1,800.000 $1,400.000
REMOVE GROUND BOX
EA 9.000 $205.000 $101.210 $105.000 $120.000 $400.000
REMOVE ELECTRICAL SERVICES
EA 2.000 $525.000 $227.740 $236.250 $250.000 $1,000.000
ELC SRV TY A 240/480 060(NS)SS(E)SP(O)
EA 5.000 $6,000.000 $7,591.090 $7,875.000 $7,600.000 $6,000.000
ELC SRV TY D 120/240 060(NS)SS(E)SP(O)
EA 1.000 $5,175.000 $7,591.090 $7,875.000 $7,600.000 $6,000.000
ALUMINUM SIGNS (TY G)
SF 1,127.500 $28.000 $34.410 $35.700 $35.000 $33.000
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
EA 38.000 $600.000 $790.490 $820.050 $800.000 $1,000.000
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
EA 44.000 $650.000 $941.300 $976.500 $1,000.000 $1,200.000
IN SM RD SN SUP&AM TY10BWG(1)SA(U)
EA 6.000 $1,100.000 $1,000.000 $1,037.400 $1,050.000 $1,250.000
IN SM RD SN SUP&AM TYS80(1)SA(P)
EA 1.000 $725.000 $1,056.680 $1,096.200 $1,100.000 $1,300.000
IN SM RD SN SUP&AM TYS80(1)SA(P-BM)
EA 9.000 $825.000 $1,286.440 $1,334.550 $1,400.000 $1,500.000
IN SM RD SN SUP&AM TYS80(1)SA(T)
EA 7.000 $785.000 $754.050 $782.250 $800.000 $1,100.000
IN BRIDGE MNT CLEARANCE SGN ASSM(TY N)
EA 4.000 $2,070.000 $2,783.400 $2,625.000 $3,200.000 $4,000.000
RELOCATE SM RD SN SUP&AM TY S80
EA 2.000 $630.000 $790.490 $820.050 $850.000 $1,000.000
REMOVE SM RD SN SUP&AM
EA 52.000 $100.000 $123.310 $75.000 $120.000 $125.000
INSTALL LRSS (STRUCT STEEL)
LB 4,892.900 $8.500 $7.130 $7.390 $7.500 $8.000
REMOVE LRSA
EA 4.000 $1,190.000 $1,163.970 $1,207.500 $1,500.000 $1,300.000
INSTL DEL ASSM (D-SW)SZ (BRF)CTB
EA 44.000 $20.500 $45.570 $23.100 $50.000 $27.000
INSTL DEL ASSM (D-SY)SZ (BRF)CTB
EA 12.000 $20.500 $45.560 $23.100 $25.000 $27.000
INSTL DEL ASSM (D-DY)SZ 1(BRF)GF2
EA 50.000 $30.150 $35.430 $26.250 $35.000 $38.000
INSTL DEL ASSM (D-SW)SZ 1(WFLX)GND
EA 31.000 $100.000 $83.000 $86.100 $120.000 $150.000
INSTL DEL ASSM (D-DW)SZ 1(WFLX)GND
EA 61.000 $66.000 $83.000 $86.100 $90.000 $150.000
INSTL OM ASSM (OM-2Z)(WFLX)GND
EA 33.000 $70.000 $83.000 $86.100 $90.000 $150.000
WK ZN PAV MRK NON-REMOV (W)4"(BRK)
LF 32,200.000 $0.270 $0.150 $0.160 $0.160 $0.160
WK ZN PAV MRK NON-REMOV (W)4"(SLD)
LF 369,560.000 $0.150 $0.120 $0.130 $0.150 $0.130
WK ZN PAV MRK NON-REMOV (W)8"(SLD)
LF 62,932.000 $0.400 $0.250 $0.260 $0.300 $0.270
WK ZN PAV MRK NON-REMOV (W)24"(SLD)
LF 164.000 $2.530 $3.040 $3.150 $3.500 $3.250
WK ZN PAV MRK NON-REMOV (Y)4"(SLD)
LF 359,568.000 $0.150 $0.120 $0.130 $0.150 $0.130
WK ZN PAV MRK REMOV (REFL) TY II-A-A
EA 28.000 $3.750 $5.060 $5.250 $5.500 $5.500
WK ZN PAV MRK SHT TERM (TAB)TY W
EA 49,126.000 $0.990 $9.600 $1.500 $0.400 $2.250
WK ZN PAV MRK SHT TERM (TAB)TY Y-2
EA 17,986.000 $0.250 $1.450 $1.500 $0.400 $2.250
REFL PAV MRK TY I (W)8"(SLD)(090MIL)
LF 15,230.000 $0.550 $1.110 $1.160 $1.250 $1.250
REFL PAV MRK TY I (W)12"(SLD)(090MIL)
LF 5,375.000 $2.850 $3.040 $3.150 $3.500 $3.250
REFL PAV MRK TY I (Y)12"(SLD)(090MIL)
LF 495.000 $3.620 $3.540 $3.680 $4.000 $4.000
RE PM W/RET REQ TY I (W)4"(BRK)(090MIL)
LF 8,570.000 $0.300 $0.560 $0.580 $0.600 $0.600
RE PM W/RET REQ TY I (W)4"(SLD)(090MIL)
LF 37,740.000 $0.300 $0.530 $0.550 $0.600 $0.600
RE PM W/RET REQ TY I (Y)4"(SLD)(090MIL)
LF 37,346.000 $0.300 $0.530 $0.550 $0.600 $0.600
REFL PAV MRK TY I (W)12"(DOT)(090MIL)
LF 1,525.000 $3.750 $3.040 $3.150 $3.500 $3.250
PREFAB PAV MRK TY C (W) (24") (SLD)
LF 592.000 $14.750 $16.190 $16.800 $19.000 $18.000
PREFAB PAV MRK TY C (W) (ARROW)
EA 16.000 $240.000 $278.340 $288.750 $325.000 $300.000
PREFAB PAV MRK TY C (W) (UTURN ARROW)
EA 6.000 $400.000 $506.070 $525.000 $600.000 $550.000
PREFAB PAV MRK TY C (W) (WORD)
EA 22.000 $280.000 $379.550 $393.750 $420.000 $425.000
REFL PAV MRKR TY I-R
EA 112.000 $5.000 $5.060 $5.250 $6.000 $5.500
REFL PAV MRKR TY II-A-A
EA 14.000 $3.000 $5.060 $5.250 $5.500 $5.500
REFL PAV MRKR TY II-C-R
EA 1,459.000 $3.200 $3.540 $3.680 $4.000 $4.000
ELIM EXT PAV MRK & MRKS (4")
LF 77,498.000 $0.400 $0.660 $0.680 $0.700 $0.700
ELIM EXT PAV MRK & MRKS (8")
LF 9,595.000 $1.000 $0.710 $0.740 $0.800 $0.800
ELIM EXT PAV MRK & MRKS (24")
LF 18.000 $4.000 $5.060 $5.250 $5.500 $5.500
PAV SURF PREP FOR MRK (4")
LF 17,502.000 $0.350 $0.200 $0.210 $0.250 $0.220
PAV SURF PREP FOR MRK (8")
LF 2,321.000 $0.500 $0.400 $0.420 $0.500 $0.450
PAV SURF PREP FOR MRK (12")
LF 190.000 $1.000 $1.010 $1.050 $1.200 $1.100
POST AND CABLE FENCE (REMOVAL)
LF 19,720.000 $3.750 $1.520 $1.580 $1.800 $1.750
POST AND CABLE FENCE (REMV CONC ANCHOR)
EA 159.000 $275.000 $253.040 $262.500 $300.000 $275.000
POST AND CABLE FENCE (NEW INSTALLATION)
LF 8,955.000 $10.000 $10.120 $10.500 $12.000 $11.000
POST AND CABLE FENCE (NEW CONC ANCHOR)
EA 80.000 $300.000 $506.070 $525.000 $600.000 $550.000
SP MIXES SP-B SAC-B PG70-22
TON 21,366.000 $81.600 $85.470 $78.500 $84.000 $110.000
SP MIXES SP-C SAC-B PG70-22
TON 596.000 $90.000 $134.850 $170.000 $165.000 $180.000
TACK COAT
GAL 5,468.000 $4.000 $2.300 $3.750 $2.250 $8.000
BONDING COURSE
GAL 11,604.000 $2.750 $2.300 $2.270 $2.500 $5.000
CEMENT
TON 486.000 $185.250 $206.340 $230.000 $250.000 $250.000
ASPHALT BINDER (PG 64-22)
TON 1,139.000 $475.000 $788.400 $620.550 $560.000 $750.000
FOAMED ASPHALT TREAT (10")(DC)
SY 95,323.000 $4.000 $4.750 $5.500 $5.500 $8.000
FILLING MILLED ASPHALT RUMBLE STRIPS
LF 5,564.000 $4.500 $1.920 $4.700 $3.000 $15.000
PORTABLE CHANGEABLE MESSAGE SIGN
EA 4.000 $10,000.000 $19,113.010 $19,250.000 $18,000.000 $11,500.000
TMSP RADAR SPEED CONTROL MONITOR
EA 4.000 $10,500.000 $4,161.700 $8,250.000 $18,000.000 $11,000.000
TMA (STATIONARY)
DAY 1,523.000 $100.000 $76.290 $50.000 $150.000 $185.000
TMA (MOBILE OPERATION)
DAY 84.000 $250.000 $961.540 $250.000 $350.000 $1,200.000
LED WRONG WAY DRIVER SYSTEM
EA 7.000 $79,187.820 $4,858.300 $5,040.000 $12,500.000 $6,000.000
Totals: $27,487,949.230 $27,535,249.661 $29,396,574.701 $30,483,616.200 $34,887,200.000