Show Job Controls
Bid Cobra

MIDLAND SH 349 (1718-07-042)

Items: 98

County: MIDLAND
Length: N/A
Highway: SH 349
District: ODESSA
Control Number: 1718-07-042
DBE Goal: N/A
Project: NH 1602(523)
Guaranty: N/A
Time: 160 WORKING DAYS
Engineer's Estimate: $10,844,664.00
Date: 11/03/2016 (9 years ago)
Contract Number: N/A
Type: PAVEMENT STRUCTURE AND SAFETY
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice HCS Excel Tabs Print Print Notice
Pay Estimates:
Bidders (3)
E
Engineer's Estimate
$10,844,664.00
Over/Under Est: -36.21% -$3,927,292.33
Over/Under Est: -31.72% -$3,439,533.50
Amt Left: 7.05% $487,758.83
$8,089,443.00
Over/Under Est: -25.41% -$2,755,221.00
Amt Left: 16.94% $1,172,071.33
Delta: -9.24% -$684,312.50

Bid Items & Bid Tabulations

98 Total 0 of 98
MIDLAND  |  SH 349  |  ODESSA  |  1718-07-042  |  11/03/2016  |  $10,844,664.00  |  NH 1602(523)  |  PAVMT STRUCT AND SAFETY  |  160 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
JONES BROS. DIRT & PAVING CONTRACTORS, INC.
PRICE CONSTRUCTION, LTD.
REECE ALBERT, INC.
REMOVING CONC (RIPRAP)
SY 579.000 $25.000 $9.620 $19.670 $13.500
REMOVING CONC (DRIVEWAYS)
SY 910.000 $8.000 $20.000 $19.680 $19.050
REMOVING CONC (CURB AND GUTTER)
LF 72.000 $8.000 $8.700 $9.380 $8.000
REMOVE CONC (WINGWALL)
CY 28.000 $250.000 $119.900 $194.730 $135.100
REMOVING CONC (HEADWALL)
CY 2.000 $470.000 $2,750.000 $3,007.240 $1,400.000
REMOVING STAB BASE AND ASPH PAV (7")
SY 137,505.000 $3.000 $3.200 $2.580 $1.750
EXCAVATION (ROADWAY)
CY 5,241.000 $12.000 $11.500 $5.210 $18.750
SUBGRADE WIDENING (DENS CONT)
STA 307.000 $530.000 $270.000 $90.960 $258.800
EMBANKMENT (FINAL)(ORD COMP)(TY D)
CY 1,988.000 $18.000 $23.500 $5.770 $14.350
BACKFILL (TY B)
STA 18.000 $270.000 $550.000 $308.010 $124.500
BLADING
HR 16.000 $260.000 $425.000 $211.070 $507.500
PROOF ROLLING
HR 8.000 $150.000 $175.000 $108.240 $110.000
REWORK BS MTL (TY C) (8") (DENS CONT)
SY 23,621.000 $5.000 $5.250 $4.270 $1.400
REWORK BS MTL (TY D)(SURF)(ORD COMP)
SY 136,337.000 $1.000 $1.150 $1.080 $1.800
PRIME COAT(MC-30 OR AE-P)
GAL 30,966.000 $5.000 $2.980 $3.550 $3.350
SUPERPAVE MIXTURES SP-C SAC-B PG64-22
TON 47,303.000 $115.000 $68.830 $77.330 $90.300
SUPERPAVE MIXTURES SP-D SAC-A PG70-22
TON 18,926.000 $115.000 $75.580 $82.420 $95.000
CEM STABIL BKFL
CY 6.000 $250.000 $365.200 $275.000 $105.000
TRENCH EXCAVATION PROTECTION
LF 24.000 $5.000 $56.100 $55.000 $3.150
DRILL SHAFT (NON - REINFORCED) (12 IN)
LF 88.000 $80.000 $137.500 $110.000 $105.000
DRILL SHAFT (RDWY ILL POLE) (30 IN)
LF 6.000 $250.000 $330.000 $357.500 $315.000
RIPRAP (CONC)(5 IN)
CY 15.000 $640.000 $652.300 $605.000 $472.500
RIPRAP (CONC)(CL B)
CY 43.000 $1,800.000 $817.300 $495.000 $472.500
RETROFIT RAIL (TY 201) (MOD)
LF 16.000 $2,500.000 $220.000 $220.000 $210.000
CMP (GAL STL 18 IN)
LF 22.000 $80.000 $77.110 $110.000 $57.750
CONC BOX CULV (5 FT X 3 FT)(EXTEND)
LF 35.000 $520.000 $971.300 $825.000 $630.000
RC PIPE (CL III)(30 IN)
LF 160.000 $205.000 $173.250 $176.000 $105.000
SET (TY I)(S= 5 FT)(HW= 4 FT)(4:1) (C)
EA 10.000 $7,100.000 $5,412.000 $4,675.000 $2,310.000
SET (TY II) (18 IN) (CMP) (6: 1) (P)
EA 2.000 $1,150.000 $2,717.000 $1,320.000 $1,050.000
SET (TY II) (30 IN) (RCP) (4: 1) (C)
EA 21.000 $1,795.000 $3,058.000 $3,080.000 $1,365.000
SET (TY II) (30 IN) (RCP) (6: 1) (C)
EA 11.000 $2,040.000 $4,081.000 $3,300.000 $1,470.000
CLEAN EXIST CULVERTS
EA 11.000 $5,700.000 $4,554.000 $4,240.920 $630.000
MOBILIZATION
LS 1.000 $985,900.000 $225,000.000 $329,091.570 $397,905.290
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 8.000 $10,000.000 $7,500.000 $21,067.590 $8,100.000
BIODEG EROSN CONT LOGS (INSTL) (18")
LF 440.000 $12.000 $12.500 $6.570 $14.000
BIODEG EROSN CONT LOGS (REMOVE)
LF 440.000 $2.000 $3.000 $3.210 $5.000
REMOVE AND RELAY PAVERS
SY 23.000 $60.000 $137.500 $110.000 $52.500
CONC CURB & GUTTER (TY II)
LF 63.000 $45.000 $60.940 $44.000 $41.200
DRIVEWAYS (CONC)
SY 910.000 $110.000 $170.170 $82.500 $92.950
MTL W-BEAM GD FEN (STEEL POST)
LF 2,600.000 $30.000 $23.100 $23.100 $22.050
MTL BEAM GD FEN TRANS (THRIE-BEAM)
EA 2.000 $2,500.000 $2,200.000 $2,200.000 $2,100.000
DOWNSTREAM ANCHOR TERMINAL SECTION
EA 2.000 $1,500.000 $1,100.000 $1,100.000 $1,050.000
MTL BM GD FEN TRANS (NON - SYM)
EA 2.000 $1,500.000 $880.000 $880.000 $840.000
REMOVE METAL BEAM GUARD FENCE
LF 4,450.000 $8.000 $3.300 $3.300 $3.150
REMOVE TERMINAL ANCHOR SECTION
EA 6.000 $200.000 $330.000 $330.000 $315.000
GUARDRAIL END TREATMENT (INSTALL)
EA 2.000 $2,700.000 $2,750.000 $2,750.000 $2,625.000
GUARDRAIL END TREATMENT (REMOVE)
EA 2.000 $375.000 $330.000 $330.000 $315.000
REMOVE RD IL ASM (TRANS-BASE)
EA 1.000 $500.000 $385.000 $550.000 $367.500
REPLACE LUMINAIRE W/LED (400W EQ)
EA 2.000 $1,500.000 $1,375.000 $1,650.000 $1,312.500
IN RD IL (TY SA) 50T-10 (400W EQ) LED
EA 1.000 $3,100.000 $6,600.000 $8,800.000 $6,300.000
CONDT (HDPE) (2")
LF 305.000 $10.000 $4.400 $8.800 $4.200
CONDT (HDPE) (2") BORE
LF 187.000 $10.000 $44.000 $66.000 $42.000
CONDT (PVC) (SCH 40) (2")
LF 54.000 $10.000 $4.400 $8.800 $4.200
ELEC CONDR (NO.6) BARE
LF 525.000 $5.000 $1.980 $2.750 $1.890
ELEC CONDR (NO.6) INSULATED
LF 1,050.000 $5.000 $2.200 $3.300 $2.100
GROUND BOX TY A (122311)W/APRON
EA 8.000 $1,200.000 $1,650.000 $2,200.000 $1,575.000
REMOVE GROUND BOX
EA 3.000 $300.000 $220.000 $550.000 $210.000
REMOVE ELECTRICAL SERVICES
EA 1.000 $450.000 $440.000 $1,100.000 $420.000
ELC SRV TY A 240/480 060(NS)SS(E)SP(O)
EA 1.000 $7,500.000 $7,150.000 $9,350.000 $6,825.000
ALUMINUM SIGNS (TY A)
SF 48.000 $30.000 $27.500 $27.500 $52.500
ALUMINUM SIGNS (TY G)
SF 432.000 $35.000 $25.300 $27.500 $26.250
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
EA 30.000 $660.000 $852.500 $770.000 $735.000
IN SM RD SN SUP&AM TY10BWG(1)SA(U)
EA 4.000 $1,025.000 $1,210.000 $1,017.500 $971.250
IN SM RD SN SUP&AM TY10BWG(2)SA(P)
EA 3.000 $1,320.000 $1,430.000 $1,320.000 $1,260.000
IN SM RD SN SUP&AM TYS80(1)SA(T)
EA 2.000 $1,100.000 $1,265.000 $1,045.000 $997.500
IN SM RD SN SUP&AM TYS80(1)SA(U-1EXT)
EA 5.000 $1,260.000 $1,595.000 $1,182.500 $1,128.750
IN SM RD SN SUP&AM TYS80(1)SA(U-2EXT)
EA 4.000 $900.000 $1,595.000 $1,265.000 $1,207.500
IN SM RD SN SUP&AM TYS80(2)SA(T-2EXT)
EA 2.000 $1,300.000 $1,760.000 $1,650.000 $1,575.000
REMOVE SM RD SN SUP&AM
EA 51.000 $110.000 $95.000 $110.000 $105.000
INSTALL LRSS (STRUCT STEEL)
LB 2,190.800 $6.000 $8.250 $5.500 $5.250
REMOVE LRSA
EA 4.000 $720.000 $440.000 $1,100.000 $1,050.000
INSTL DEL ASSM (D-SW)SZ (BRF)GF1
EA 27.000 $250.000 $22.000 $22.000 $21.000
INSTL OM ASSM (OM-2Y)(WC)GND
EA 32.000 $105.000 $110.000 $137.500 $131.250
REMOVE DELIN & OBJECT MARKER ASSMS
EA 32.000 $40.000 $35.000 $16.500 $15.750
WK ZN PAV MRK REMOV (W)4"(BRK)
LF 10,430.000 $1.000 $0.120 $0.500 $0.480
WK ZN PAV MRK REMOV (W)4"(SLD)
LF 83,436.000 $0.750 $0.120 $0.500 $0.480
WK ZN PAV MRK REMOV (Y)4"(SLD)
LF 83,436.000 $0.900 $0.120 $0.500 $0.480
WK ZN PAV MRK SHT TERM (TAB)TY W
EA 3,129.000 $1.200 $1.500 $2.090 $2.500
WK ZN PAV MRK SHT TERM (TAB)TY Y
EA 5,215.000 $0.800 $1.500 $2.090 $2.500
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
LF 1,011.000 $1.000 $0.700 $0.700 $0.680
RE PM W/RET REQ TY I (W)4"(BRK)(100MIL)
LF 10,430.000 $0.500 $0.350 $0.350 $0.340
RE PM W/RET REQ TY I (W)4"(SLD)(100MIL)
LF 41,717.000 $0.500 $0.350 $0.350 $0.340
RE PM W/RET REQ TY I (Y)4"(BRK)(100MIL)
LF 9,702.000 $0.500 $0.350 $0.350 $0.340
RE PM W/RET REQ TY I (Y)4"(SLD)(100MIL)
LF 42,593.000 $0.500 $0.350 $0.350 $0.340
PREFAB PAV MRK TY C (W) (24") (SLD)
LF 133.000 $25.000 $13.200 $13.200 $12.600
PREFAB PAV MRK TY C (W) (ARROW)
EA 6.000 $250.000 $220.000 $220.000 $210.000
PREFAB PAV MRK TY C (W) (WORD)
EA 6.000 $350.000 $275.000 $275.000 $262.500
REFL PAV MRKR TY I-C
EA 555.000 $4.000 $3.300 $3.300 $3.150
REFL PAV MRKR TY II-A-A
EA 1,131.000 $3.000 $3.300 $3.300 $3.150
VEH SIG SEC (12")LED(YEL)
EA 6.000 $250.000 $275.000 $440.000 $262.500
BACK PLATE (12")(1 SEC)(VENTED)ALUM
EA 6.000 $75.000 $110.000 $220.000 $105.000
TRF SIG CBL (TY A)(12 AWG)(4 CONDR)
LF 117.000 $5.000 $2.480 $4.400 $2.370
INSTL RDSD FLSH BCN ASSM (SOLAR PWRD)
EA 3.000 $8,700.000 $12,100.000 $15,400.000 $11,550.000
REMOV RDSD FLSH BCN AM (SOLAR PWRD)
EA 2.000 $1,500.000 $330.000 $330.000 $315.000
REMOVAL OF CABLES
LF 54.000 $1.000 $3.300 $3.300 $3.150
REMOVAL OF TRAFFIC SIGNAL POLE FND
LF 5.000 $950.000 $220.000 $247.660 $150.000
REMOVAL OF SIGNAL POLE ASSM
EA 1.000 $2,020.000 $1,100.000 $1,100.000 $1,050.000
PORTABLE CHANGEABLE MESSAGE SIGN
EA 1.000 $19,500.000 $18,700.000 $19,347.920 $21,565.000
Totals: $10,844,664.000 $6,917,371.670 $7,405,130.500 $8,089,443.000