Show Job Controls
Bid Cobra

MIDLAND SL 250 (1188-02-118)

Items: 66

County: MIDLAND
Length: N/A
Highway: SL 250
District: ODESSA
Control Number: 1188-02-118
DBE Goal: 0.0%
Project: C 1188-2-118
Guaranty: N/A
Time: 64 WORKING DAYS
Engineer's Estimate: $1,452,101.50
Date: 01/05/2024 (2 years ago)
Contract Number: N/A
Type: INTERSECTION & OPERATIONAL IMPROVEMENTS
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice Questions HCS Excel Tabs Print Print Notice
Bidders (3)
E
Engineer's Estimate
$1,452,101.50
$1,609,466.84
Over/Under Est: 10.84% $157,365.34
$1,724,118.00
Over/Under Est: 18.73% $272,016.50
Amt Left: 7.12% $114,651.16
Over/Under Est: 68.87% $1,000,000.00
Amt Left: 52.35% $842,634.66
Delta: -42.22% -$727,983.50
Subcontractor Percentage Amount
TRP CONSTRUCTION GROUP, LLC 2.91% $46,835.49
DK CONTRACTING, LLC 0.92% $14,807.09
D & E LOGISTICS, LLC 0.92% $14,807.09
BARRICADES UNLIMITED 0.89% $14,324.25
K. L. DURHAM CONSTRUCTION, L.L.C. 0.59% $9,495.85
WILLIS ELECTRIC CO., LP 0.52% $8,369.23
ALTEX LANDSCAPE CONSTRUCTION, INC. 0.52% $8,369.23
Total: 7.27% $117,008.23

Bid Items & Bid Tabulations

66 Total 0 of 66
MIDLAND  |  SL 250  |  ODESSA  |  1188-02-118  |  01/05/2024  |  $1,452,101.50  |  C 1188-2-118  |  INTERS & OPERATIONAL IMPRVS  |  64 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
REECE ALBERT, INC.
FNH CONSTRUCTION, LLC
JONES BROS. DIRT & PAVING CONTRACTORS, INC.
REMOVING CONC (RIPRAP)
SY 81.000 $50.000 $40.830 $200.000 $56.000
REMOVING CONC (CURB AND GUTTER)
LF 1,914.000 $13.000 $8.600 $30.000 $30.000
REMOVING CONC (SIDEWALK OR RAMP)
SY 233.000 $25.000 $25.160 $30.000 $40.000
REMOVING STAB BASE & ASPH PAV (8"-10")
SY 1,788.000 $20.000 $13.130 $30.000 $25.750
EXCAVATION (ROADWAY)
CY 469.000 $40.000 $97.110 $30.000 $70.000
DRILL SEEDING (PERM) (URBAN) (SANDY)
SY 1,569.000 $1.000 $2.830 $10.000 $15.000
PROOF ROLLING
HR 8.000 $500.000 $180.840 $150.000 $175.000
FL BS (CMP IN PLC)(TY A GR 4)(7")
SY 4,676.000 $32.000 $27.990 $40.000 $50.930
REWORK BS MTL (TY D)(SURF)(ORD COMP)
SY 267.000 $10.000 $12.790 $50.000 $37.210
PRIME COAT (AE-P)
GAL 588.000 $22.000 $13.310 $10.000 $21.000
ASPH (AC-20-5TR)
GAL 2,649.000 $20.000 $8.080 $40.000 $14.750
AGGR(TY-PB GR-4 SAC-A)
CY 65.000 $500.000 $648.660 $600.000 $475.000
FLEXIBLE PAVEMENT STRUCTURE REPAIR(4")
SY 267.000 $300.000 $177.150 $60.000 $275.000
RIPRAP (CONC)(5 IN)
CY 47.000 $650.000 $994.550 $650.000 $1,800.000
RC PIPE (CL III)(24 IN)
LF 100.000 $200.000 $537.380 $125.000 $652.500
RC PIPE (CL III)(30 IN)
LF 28.000 $300.000 $923.050 $250.000 $693.000
INLET (COMPL)(PCU)(5FT)(NONE)
EA 3.000 $15,000.000 $31,622.820 $15,000.000 $22,500.000
REMOV STR (INLET)
EA 1.000 $2,000.000 $7,280.550 $3,500.000 $5,253.730
REMOV STR (PIPE)
LF 30.000 $30.000 $242.690 $100.000 $112.500
MOBILIZATION
LS 1.000 $130,000.000 $154,722.650 $165,000.000 $245,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 4.000 $11,000.000 $34,970.970 $8,500.000 $50,000.000
ROCK FILTER DAMS (INSTALL) (TY 4)
LF 65.000 $85.000 $128.990 $40.000 $500.000
ROCK FILTER DAMS (REMOVE)
LF 65.000 $25.000 $49.670 $20.000 $250.000
BIODEG EROSN CONT LOGS (INSTL) (18")
LF 520.000 $15.000 $14.180 $18.000 $20.000
BIODEG EROSN CONT LOGS (REMOVE)
LF 520.000 $1.000 $9.010 $9.000 $16.500
REMOVE AND RELAY PAVERS
SY 130.000 $100.000 $28.260 $250.000 $375.000
CONC CURB & GUTTER (TY II)
LF 1,652.000 $50.000 $43.940 $65.000 $112.500
CONC CURB & GUTTER (SLOTTED)
LF 60.000 $60.000 $81.350 $100.000 $112.500
CONC SIDEWALKS (4")
SY 22.000 $200.000 $426.460 $100.000 $210.000
CONC MEDIAN
SY 439.000 $205.000 $188.860 $250.000 $435.000
PIPE UNDERDRAINS (TY 8) (6")
LF 603.000 $40.000 $84.880 $100.000 $90.000
GROUND BOX TY C (162911)
EA 1.000 $5,000.000 $9,609.360 $2,000.000 $12,750.000
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
EA 10.000 $600.000 $1,243.570 $1,500.000 $1,650.000
IN SM RD SN SUP&AM TY10BWG(1)SA(U)
EA 1.000 $1,500.000 $1,413.140 $1,500.000 $1,875.000
REMOVE SM RD SN SUP&AM
EA 5.000 $100.000 $190.390 $500.000 $1,000.000
INSTL DEL ASSM (D-SW)SZ 1(WFLX)SRF
EA 16.000 $150.000 $90.440 $100.000 $120.000
WK ZN PAV MRK REMOV (Y)6"(SLD)
LF 1,950.000 $1.500 $3.390 $10.000 $11.810
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
LF 800.000 $1.000 $4.520 $10.000 $6.000
REFL PAV MRK TY I (W)12"(SLD)(100MIL)
LF 294.000 $5.000 $7.910 $10.000 $10.500
REFL PAV MRK TY I (Y)8"(SLD)(100MIL)
LF 416.000 $1.000 $4.520 $10.000 $6.000
REFL PAV MRK TY I (Y)12"(SLD)(100MIL)
LF 287.000 $5.000 $7.910 $10.000 $10.500
REFL PAV MRK TY I(Y)(MED NOSE)(100MIL)
EA 2.000 $300.000 $565.260 $500.000 $750.000
REFL PAV MRK TY II (W) 36" (YLD TRI)
EA 8.000 $100.000 $84.790 $500.000 $112.500
PAVEMENT SEALER (ARROW)
EA 4.000 $50.000 $84.790 $500.000 $112.500
PAVEMENT SEALER (MED NOSE)
EA 2.000 $100.000 $169.580 $500.000 $225.000
RE PM W/RET REQ TY I (W)6"(BRK)(100MIL)
LF 447.000 $1.000 $2.260 $10.000 $3.000
RE PM W/RET REQ TY I (W)6"(SLD)(100MIL)
LF 936.000 $1.000 $2.260 $10.000 $3.000
RE PM W/RET REQ TY I (Y)6"(SLD)(100MIL)
LF 2,538.000 $1.000 $2.260 $10.000 $3.000
PREFAB PAV MRK TY B (W)(24")(SLD)
LF 28.000 $30.000 $45.220 $20.000 $60.000
PREFAB PAV MRK TY B (W)(ARROW)
EA 4.000 $500.000 $1,356.620 $500.000 $1,800.000
REFL PAV MRKR TY II-C-R
EA 23.000 $5.000 $22.610 $6.000 $30.000
ELIM EXT PAV MRK & MRKS (4")
LF 2,063.000 $1.000 $2.260 $10.000 $3.000
ELIM EXT PAV MRK & MRKS (8")
LF 488.000 $1.250 $4.520 $10.000 $6.000
ELIM EXT PAV MRK & MRKS (12")
LF 435.000 $2.500 $5.650 $10.000 $7.500
ELIM EXT PAV MRK & MRKS (24")
LF 16.000 $5.000 $5.650 $10.000 $7.500
ELIM EXT PAV MRK & MRKS (ARROW)
EA 6.000 $90.000 $113.050 $250.000 $150.000
ELIM EXT PAV MRK & MRKS (WORD)
EA 6.000 $100.000 $113.050 $250.000 $150.000
PAV SURF PREP FOR MRK (ARROW)
EA 4.000 $50.000 $113.050 $250.000 $150.000
PAV SURF PREP FOR MRK (MED NOSE)
EA 2.000 $50.000 $113.050 $250.000 $150.000
SP MIXES SP-B SAC-B PG70-22
TON 632.000 $415.000 $297.520 $300.000 $281.330
TOM-C SAC-A
TON 173.000 $510.000 $415.960 $300.000 $339.310
BONDING COURSE
GAL 246.000 $15.000 $9.990 $10.000 $41.730
PORTABLE CHANGEABLE MESSAGE SIGN
EA 6.000 $12,000.000 $16,757.200 $20,000.000 $34,200.000
TMSP RADAR SPEED CONTROL MONITOR
EA 2.000 $10,000.000 $8,972.300 $15,000.000 $19,000.000
TMA (STATIONARY)
DAY 50.000 $500.000 $361.120 $250.000 $237.500
TMA (MOBILE OPERATION)
HR 48.000 $100.000 $119.170 $85.000 $161.500
Totals: $1,452,101.500 $1,609,466.840 $1,724,118.000 $2,452,101.500