REMOVING CONC (PAV)
|
SY
|
504.000
|
$55.000
|
$43.430
|
$100.000
|
|
|
REMOVING CONC (CURB OR CURB & GUTTER)
|
LF
|
795.000
|
$11.000
|
$13.770
|
$100.000
|
|
|
REMOVING CONC (SIDEWALK OR RAMP)
|
SY
|
520.000
|
$71.500
|
$42.090
|
$50.000
|
|
|
REMOVING STAB BASE AND ASPH PAV (2"-6")
|
SY
|
2,033.000
|
$11.000
|
$32.300
|
$50.000
|
|
|
EXCAVATION (ROADWAY)
|
CY
|
228.000
|
$55.000
|
$48.000
|
$50.000
|
|
|
EMBANKMENT (FINAL)(ORD COMP)(TY A)
|
CY
|
29.000
|
$55.000
|
$18.870
|
$100.000
|
|
|
FURNISHING AND PLACING TOPSOIL (4")
|
SY
|
86.000
|
$5.500
|
$6.360
|
$20.000
|
|
|
BLOCK SODDING
|
SY
|
86.000
|
$1.100
|
$19.500
|
$20.000
|
|
|
FL BS (CMP IN PLC)(TY C GR 4) (6")
|
SY
|
997.000
|
$55.000
|
$14.860
|
$85.000
|
|
|
MICROSURFACING
|
TON
|
179.000
|
$605.000
|
$1,033.500
|
$1,850.000
|
|
|
RIPRAP (CONC)(4 IN)
|
CY
|
83.000
|
$1,100.000
|
$1,392.320
|
$650.000
|
|
|
ADJUSTING MANHOLES
|
EA
|
1.000
|
$2,750.000
|
$547.200
|
$2,500.000
|
|
|
ADJUSTING MANHOLES (SANITARY)
|
EA
|
1.000
|
$2,750.000
|
$547.200
|
$2,500.000
|
|
|
ADJUSTING MANHOLES (WATER VALVE BOX)
|
EA
|
6.000
|
$825.000
|
$912.000
|
$2,500.000
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$131,306.650
|
$372,744.000
|
$220,000.000
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
11.000
|
$22,000.000
|
$3,250.000
|
$20,000.000
|
|
|
CONC CURB & GUTTER (TY II)
|
LF
|
1,918.000
|
$55.000
|
$71.330
|
$85.000
|
|
|
DRIVEWAYS (CONC)
|
SY
|
18.000
|
$192.500
|
$240.890
|
$125.000
|
|
|
CONC SIDEWALKS (4")
|
SY
|
906.000
|
$110.000
|
$197.780
|
$85.000
|
|
|
CURB RAMPS (TY 1)
|
EA
|
19.000
|
$2,750.000
|
$4,045.150
|
$3,250.000
|
|
|
CURB RAMPS (TY 21)
|
EA
|
3.000
|
$3,850.000
|
$4,045.150
|
$3,250.000
|
|
|
CURB RAMP (TY 1) (MOD)
|
EA
|
8.000
|
$2,750.000
|
$4,045.150
|
$3,500.000
|
|
|
CONDT (PVC) (SCH 40) (2")
|
LF
|
110.000
|
$22.000
|
$162.500
|
$40.000
|
|
|
ELEC CONDR (NO.6) BARE
|
LF
|
110.000
|
$3.700
|
$6.500
|
$3.000
|
|
|
GROUND BOX TY C (162911)
|
EA
|
5.000
|
$2,750.000
|
$3,380.000
|
$2,000.000
|
|
|
ALUMINUM SIGNS (TY A)
|
SF
|
135.000
|
$66.000
|
$130.000
|
$50.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
|
EA
|
19.000
|
$990.000
|
$650.000
|
$1,500.000
|
|
|
REMOVE SM RD SN SUP&AM
|
EA
|
11.000
|
$220.000
|
$162.500
|
$850.000
|
|
REFL PAV MRK TY I (W)4"(DOT)(100MIL)
|
LF
|
357.000
|
$2.000
|
$2.280
|
$6.000
|
|
REFL PAV MRK TY I (W)12"(SLD)(100MIL)
|
LF
|
87.000
|
$4.000
|
$3.900
|
$6.000
|
|
REFL PAV MRK TY I (W)18"(SLD)(100MIL)
|
LF
|
193.000
|
$6.000
|
$4.880
|
$12.000
|
|
REFL PAV MRK TY I (W)24"(SLD)(100MIL)
|
LF
|
1,018.000
|
$8.000
|
$6.500
|
$20.000
|
|
REFL PAV MRK TY I (W)(ARROW)(100MIL)
|
EA
|
5.000
|
$200.000
|
$227.500
|
$500.000
|
|
REFL PAV MRK TY I (W)(SYMBOL)(100MIL)
|
EA
|
2.000
|
$300.000
|
$383.500
|
$500.000
|
|
REF PAV MRK TY I(W)18"(YLD TRI)(100MIL)
|
EA
|
8.000
|
$50.000
|
$71.500
|
$500.000
|
|
REFL PAV MRK TY I(W)(BIKE SYML)(100MIL)
|
EA
|
22.000
|
$350.000
|
$204.100
|
$1,000.000
|
|
REFL PAV MRK TY II (W) (SYMBOL)
|
EA
|
2.000
|
$200.000
|
$214.500
|
$500.000
|
|
REFL PAV MRK TY II (W) 18" (YLD TRI)
|
EA
|
8.000
|
$30.000
|
$63.700
|
$500.000
|
|
RE PM W/RET REQ TY I (W)4"(BRK)(100MIL)
|
LF
|
560.000
|
$2.000
|
$2.280
|
$3.000
|
|
RE PM W/RET REQ TY I (W)6"(BRK)(100MIL)
|
LF
|
210.000
|
$2.000
|
$2.600
|
$3.000
|
|
RE PM W/RET REQ TY I (W)6"(SLD)(100MIL)
|
LF
|
5,203.000
|
$2.200
|
$2.600
|
$3.000
|
|
RE PM W/RET REQ TY I (Y)6"(BRK)(100MIL)
|
LF
|
100.000
|
$2.200
|
$2.600
|
$3.000
|
|
RE PM W/RET REQ TY I (Y)6"(SLD)(100MIL)
|
LF
|
1,762.000
|
$2.200
|
$2.600
|
$3.000
|
|
REFL PAV MRKR TY I-R
|
EA
|
4.000
|
$11.000
|
$6.500
|
$6.000
|
|
REFL PAV MRKR TY II-A-A
|
EA
|
5.000
|
$11.000
|
$6.500
|
$6.000
|
|
REFL PAV MRKR TY II-C-R
|
EA
|
34.000
|
$11.000
|
$6.500
|
$6.000
|
|
|
ELIM EXT PAV MRK & MRKS (6")
|
LF
|
131.000
|
$1.100
|
$0.820
|
$3.000
|
|
|
ELIM EXT PAV MRK & MRKS (24")
|
LF
|
257.000
|
$5.500
|
$0.980
|
$20.000
|
|
|
PAV SURF PREP FOR MRK (4")
|
LF
|
917.000
|
$0.550
|
$0.390
|
$3.000
|
|
|
PAV SURF PREP FOR MRK (6")
|
LF
|
7,275.000
|
$0.550
|
$0.440
|
$3.000
|
|
|
PAV SURF PREP FOR MRK (12")
|
LF
|
87.000
|
$1.100
|
$0.510
|
$6.000
|
|
|
PAV SURF PREP FOR MRK (18")
|
LF
|
193.000
|
$1.650
|
$0.550
|
$6.000
|
|
|
PAV SURF PREP FOR MRK (24")
|
LF
|
1,018.000
|
$2.200
|
$0.590
|
$6.000
|
|
|
TRF SIG CBL (TY A)(14 AWG)(3 CONDR)
|
LF
|
860.000
|
$3.600
|
$13.000
|
$3.000
|
|
|
TRF SIG CBL (TY A)(14 AWG)(5 CONDR)
|
LF
|
890.000
|
$4.400
|
$13.000
|
$3.000
|
|
|
PED POLE ASSEMBLY
|
EA
|
6.000
|
$8,250.000
|
$7,800.000
|
$6,500.000
|
|
|
REMOVAL OF GROUND BOXES
|
EA
|
5.000
|
$330.000
|
$650.000
|
$500.000
|
|
|
REMOVE PED POLE ASSM
|
EA
|
1.000
|
$770.000
|
$1,560.000
|
$2,000.000
|
|
|
REMOV PED SIG LED TRAF SIG LAMP UNIT
|
EA
|
10.000
|
$440.000
|
$975.000
|
$2,500.000
|
|
|
INSTALL PED SGN LED TRAF SIG AMP UNIT
|
EA
|
10.000
|
$330.000
|
$1,560.000
|
$12,500.000
|
|
|
RELOCATE OF PEDESTRIAN PUSH BUTTON
|
EA
|
10.000
|
$418.000
|
$975.000
|
$8,500.000
|
|
|
DECOMPOSED GRANITE (3" DEPTH)
|
SY
|
24.000
|
$82.500
|
$130.000
|
$1,000.000
|
|
|
D-GR HMA TY-C PG70-22
|
TON
|
63.000
|
$275.000
|
$422.500
|
$650.000
|
|
|
D-GR HMA TY-D PG70-22
|
TON
|
42.000
|
$275.000
|
$422.500
|
$500.000
|
|
|
TRENCH DRAINS
|
LF
|
799.000
|
$550.000
|
$391.310
|
$65.000
|
|
|
ADJUST OR RELOC EXIST FIRE HYDRANT
|
EA
|
5.000
|
$1,650.000
|
$19,500.000
|
$4,500.000
|
|
Totals: |
$1,686,373.200
|
$1,982,263.220
|
$2,171,890.000
|