Show Job Controls
Bid Cobra

MIDLAND CS (0906-32-060)

Items: 27

County: MIDLAND
Length: N/A
Highway: CS
District: ODESSA
Control Number: 0906-32-060
DBE Goal: N/A
Project: STP 2B23(013)HESG
Guaranty: N/A
Time: 91 WORKING DAYS
Engineer's Estimate: $494,356.00
Date: 08/03/2023 (2 years ago)
Contract Number: N/A
Type: INTERSECTION IMPROVEMENT
Mail/Deliver Bids To: N/A
ODA-PRELETTINGQUESTIONS
Actions:
Notice HCS Excel Tabs Print Print Notice
Bidders (3)
E
Engineer's Estimate
$494,356.00
$496,352.87
Over/Under Est: 0.4% $1,996.87
Over/Under Est: 29.53% $145,970.00
Amt Left: 29.01% $143,973.13
Over/Under Est: 38.37% $189,702.00
Amt Left: 37.82% $187,705.13
Delta: -6.83% -$43,732.00
Subcontractor Percentage Amount
KING & GEORGE, LLC 1.84% $9,132.89
BARRICADES UNLIMITED 1.05% $5,211.71
Total: 2.89% $14,344.60

Bid Items & Bid Tabulations

27 Total 0 of 27
MIDLAND  |  CS  |  ODESSA  |  0906-32-060  |  08/03/2023  |  $494,356.00  |  STP 2B23(013)HESG  |  INTERS IMPRV  |  91 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
TI-ZACK CONCRETE, INC.
FNH CONSTRUCTION, LLC
RAGLE CONSTRUCTION, INC.
REMOVING CONC (PAV)
SY 113.000 $110.000 $70.620 $50.000 $80.000
REMOVING CONC (CURB AND GUTTER)
LF 147.000 $55.000 $10.860 $50.000 $80.000
REMOVING CONC (SIDEWALK OR RAMP)
SY 118.000 $55.000 $13.510 $50.000 $20.000
FL BS (CMP IN PLC)(TY A GR 4) (6")
SY 729.000 $55.000 $19.610 $25.000 $19.000
FL BS (CMP IN PLC)(TY A GR 4) (8")
SY 74.000 $99.000 $21.570 $35.000 $32.000
SALV, HAUL & STKPL RCL APH PV (2 TO 4")
SY 641.000 $88.000 $24.900 $30.000 $18.000
PRIME COAT (MC-30)
GAL 15.000 $110.000 $11.000 $10.000 $100.000
PLAN & TEXT ASPH CONC PAV(0" TO 2")
SY 641.000 $44.000 $22.000 $30.000 $16.000
CONC PVMT (CONT REINF - CRCP) (7")
SY 527.000 $176.000 $345.000 $300.000 $360.000
CONC PVMT(CRCP)(TRANSITION SLAB)
SY 222.000 $176.000 $480.000 $750.000 $120.000
ADJUSTING MANHOLES (SANITARY)
EA 2.000 $1,650.000 $997.500 $2,500.000 $2,100.000
ADJUSTING MANHOLES (WATER VALVE BOX)
EA 5.000 $1,100.000 $399.000 $850.000 $1,000.000
MOBILIZATION
LS 1.000 $49,500.000 $45,000.000 $60,000.000 $68,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 5.000 $3,300.000 $2,750.000 $8,500.000 $50,000.000
BIODEG EROSN CONT LOGS (INSTL) (8")
LF 48.000 $13.200 $5.500 $18.000 $10.000
BIODEG EROSN CONT LOGS (REMOVE)
LF 48.000 $1.100 $1.100 $9.000 $2.000
CONC CURB & GUTTER (TY I)
LF 318.000 $110.000 $90.480 $85.000 $40.000
CONC SIDEWALKS (4")
SY 133.000 $110.000 $160.000 $105.000 $73.000
CURB RAMPS (TY 2)
EA 7.000 $4,000.000 $2,500.000 $5,000.000 $1,800.000
CURB RAMPS (TY 4)
EA 1.000 $4,000.000 $2,500.000 $5,000.000 $1,600.000
ALUMINUM SIGNS (TY G)
SF 10.000 $110.000 $110.000 $50.000 $50.000
REPLACE EXISTING ALUMINUM SIGNS(TY G)
SF 2.000 $110.000 $137.500 $50.000 $50.000
PREFAB PAV MRK TY B (W)(4")(SLD)
LF 660.000 $20.200 $11.000 $20.000 $10.000
PREFAB PAV MRK TY C (W) (8") (DOT)
LF 92.000 $20.200 $22.000 $20.000 $20.000
PREFAB PAV MRK TY C (W) (24") (SLD)
LF 168.000 $40.400 $27.500 $40.000 $25.000
D-GR HMA TY-D PG76-22
TON 5.000 $1,320.000 $440.000 $1,500.000 $4,000.000
PORTABLE CHANGEABLE MESSAGE SIGN
DAY 90.000 $165.000 $1.100 $150.000 $82.000
Totals: $494,356.000 $496,352.870 $640,326.000 $684,058.000