Show Job Controls
Bid Cobra

MIDLAND CS (0906-32-050)

Items: 62

County: MIDLAND
Length: N/A
Highway: CS
District: ODESSA
Control Number: 0906-32-050
DBE Goal: 550.0%
Project: BR 2B23(292)
Guaranty: N/A
Time: 174 WORKING DAYS
Engineer's Estimate: $3,857,967.30
Date: 01/04/2024 (2 years ago)
Contract Number: N/A
Type: BRIDGE REPLACEMENT
Mail/Deliver Bids To: N/A
ODA-PRELETTINGQUESTIONS
Actions:
Notice Questions HCS Excel Tabs Print Print Notice
Bidders (3)
E
Engineer's Estimate
$3,857,967.30
$3,896,638.50
Over/Under Est: 1% $38,671.20
$4,572,987.29
Over/Under Est: 18.53% $715,019.99
Amt Left: 17.36% $676,348.79
Over/Under Est: 29.33% $1,131,419.40
Amt Left: 28.04% $1,092,748.20
Delta: -9.11% -$416,399.41
Subcontractor Percentage Amount
Z-TEK CONSTRUCTION, LLC 13.13% $513,574.50
BAG REINFORCING LLC 3.20% $125,166.67
J. R. (JOE) RAMON & SONS, INC. 3.00% $117,343.75
TRP CONSTRUCTION GROUP, LLC 0.71% $27,771.36
BARRICADES UNLIMITED 0.33% $12,907.81
Total: 20.37% $796,764.09

Bid Items & Bid Tabulations

62 Total 0 of 62
MIDLAND  |  CS  |  ODESSA  |  0906-32-050  |  01/04/2024  |  $3,857,967.30  |  BR 2B23(292)  |  BRIDGE REPL  |  174 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
DELGADO'S CONTRACTORS, LLC
ALTUS CONSTRUCTION LLC
ACME BRIDGE COMPANY, INC.
REMOVING CONC (PAV)
SY 65.000 $80.000 $50.000 $32.960 $110.000
REMOVING CONC (RIPRAP)
SY 1,201.000 $50.000 $25.000 $36.130 $50.000
REMOVING CONC (SIDEWALKS)
SY 230.000 $100.000 $30.000 $20.280 $50.000
REMOVING CONC (CURB AND GUTTER)
LF 412.000 $30.000 $20.000 $15.210 $25.000
REMOVING CONC (APPR SLAB)
SY 118.000 $57.000 $75.000 $45.630 $110.000
REMOVING STAB BASE AND ASPH PAV (5")
SY 638.000 $25.000 $37.500 $20.360 $25.000
PROOF ROLLING
HR 20.000 $250.000 $150.000 $125.490 $279.000
REWORK BS MTL (TY D)(SURF)(ORD COMP)
SY 301.000 $10.000 $25.000 $1.770 $75.000
PRIME COAT (AE-P)
GAL 91.000 $50.000 $50.000 $5.850 $110.000
CONC PVMT (JOINTED - CPCD) (8")
SY 85.000 $400.000 $135.000 $130.810 $400.000
CEM STABIL BKFL
CY 3.000 $1,000.000 $300.000 $278.860 $945.000
TRENCH EXCAVATION PROTECTION
LF 97.000 $30.000 $20.000 $10.140 $130.000
CL C CONC (CULV)
CY 921.000 $2,100.000 $2,000.000 $2,144.750 $2,550.000
BRIDGE SIDEWALK
SF 1,978.000 $26.000 $30.000 $123.700 $28.900
APPROACH SLAB
CY 190.000 $910.000 $1,200.000 $1,218.980 $1,250.000
RETAINING WALL (CAST - IN - PLACE)
SF 1,008.000 $50.000 $120.000 $188.300 $130.000
RIPRAP (CONC)(4 IN)
CY 221.000 $1,000.000 $700.000 $649.170 $1,100.000
RAIL (TY C223)
LF 504.000 $170.000 $250.000 $211.180 $304.000
WINGWALL (FW - S) (HW=7 FT)
EA 4.000 $15,000.000 $30,000.000 $31,941.960 $21,800.000
WINGWALL (PW - 1) (HW=7 FT)
EA 1.000 $30,000.000 $35,000.000 $39,547.180 $33,700.000
WINGWALL (SW - 0) (HW=7 FT)
EA 3.000 $15,000.000 $30,000.000 $40,153.330 $21,000.000
WINGWALL (SW-0)(HW=6FT)(MOD)
EA 4.000 $15,000.000 $25,000.000 $40,647.480 $24,400.000
ADJUSTING MANHOLES (SANITARY)
EA 4.000 $2,750.000 $2,000.000 $2,332.270 $5,610.000
REMOV STR (WINGWALL)
EA 8.000 $3,000.000 $3,000.000 $2,332.270 $4,000.000
REMOV STR (BOX CULVERT)
LF 966.000 $100.000 $100.000 $52.960 $290.000
REMOVE STR (RAIL)
LF 780.000 $50.000 $50.000 $38.140 $52.100
MOBILIZATION
LS 1.000 $344,865.000 $350,000.000 $446,173.360 $493,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 9.000 $12,000.000 $2,500.000 $37,992.340 $10,000.000
ROCK FILTER DAMS (INSTALL) (TY 3)
LF 315.000 $100.000 $100.000 $73.520 $100.000
ROCK FILTER DAMS (REMOVE)
LF 315.000 $40.000 $10.000 $15.210 $22.500
CONC CURB (TY II)
LF 26.000 $100.000 $50.000 $44.840 $193.000
CONC CURB & GUTTER (TY II)
LF 358.000 $80.000 $55.000 $55.010 $83.400
CURB RAMPS (TY 2)
EA 4.000 $4,500.000 $3,000.000 $2,535.080 $5,500.000
CURB RAMPS (TY 10)
EA 4.000 $4,500.000 $3,000.000 $2,585.780 $5,500.000
MTL W-BEAM GD FEN (STEEL POST)
LF 325.000 $40.000 $40.000 $51.380 $54.700
MTL BEAM GD FEN TRANS (THRIE-BEAM)
EA 2.000 $3,000.000 $2,500.000 $4,394.130 $3,960.000
DOWNSTREAM ANCHOR TERMINAL SECTION
EA 1.000 $2,000.000 $1,800.000 $2,433.670 $2,850.000
GUARDRAIL END TREATMENT (INSTALL)
EA 3.000 $3,000.000 $4,000.000 $5,070.150 $4,560.000
IN SM RD SN SUP&AM TY10BWG(1)SB(P)
EA 2.000 $900.000 $1,000.000 $2,028.060 $1,710.000
REMOVE SM RD SN SUP&AM
EA 6.000 $300.000 $100.000 $169.010 $171.000
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2
EA 4.000 $100.000 $35.000 $67.600 $57.000
INSTL DEL ASSM (D-SY)SZ 1(BRF)GF2
EA 11.000 $100.000 $35.000 $67.600 $57.000
WK ZN PAV MRK REMOV (TRAF BTN) TY W
LF 1,590.000 $1.500 $5.000 $3.160 $4.000
REFL PAV MRK TY I (W)24"(SLD)(100MIL)
LF 119.000 $10.000 $16.500 $8.920 $17.100
REFL PAV MRK TY I (W)(WORD)(100MIL)
EA 4.000 $250.000 $440.000 $212.950 $456.000
PAVEMENT SEALER 4"
LF 1,398.000 $0.500 $4.000 $0.410 $2.850
PAVEMENT SEALER 24"
LF 51.000 $2.000 $7.000 $2.030 $6.800
PAVEMENT SEALER (WORD)
EA 4.000 $100.000 $112.000 $50.700 $114.000
RE PM W/RET REQ TY I (W)4"(BRK)(100MIL)
LF 955.000 $2.000 $6.000 $0.740 $5.700
RE PM W/RET REQ TY I (W)4"(SLD)(100MIL)
LF 339.000 $0.700 $6.000 $0.700 $5.700
RE PM W/RET REQ TY I (Y)4"(SLD)(100MIL)
LF 104.000 $2.000 $6.000 $1.070 $5.700
ELIM EXT PAV MRK & MRKS (4")
LF 535.000 $4.000 $6.000 $0.760 $5.700
ELIM EXT PAV MRK & MRKS (24")
LF 39.000 $10.000 $11.000 $4.060 $11.400
PAV SURF PREP FOR MRK (4")
LF 1,398.000 $0.500 $4.000 $0.230 $2.850
PAV SURF PREP FOR MRK (24")
LF 119.000 $2.000 $6.000 $1.520 $5.700
PAV SURF PREP FOR MRK (WORD)
EA 4.000 $100.000 $110.000 $30.420 $114.000
RELOCT RDSD FLSH BCN AM (SOLAR PWRD)
EA 4.000 $5,000.000 $5,000.000 $3,954.720 $6,840.000
D-GR HMA TY-C PG70-22
TON 54.000 $450.000 $225.000 $172.390 $834.000
D-GR HMA TY-D PG70-22
TON 38.000 $450.000 $200.000 $132.430 $980.000
TACK COAT
GAL 60.000 $20.000 $20.000 $4.520 $43.800
PORTABLE CHANGEABLE MESSAGE SIGN
DAY 348.000 $200.000 $200.000 $101.400 $121.000
TMA (STATIONARY)
DAY 144.000 $400.000 $750.000 $338.010 $157.000
Totals: $3,857,967.300 $3,896,638.500 $4,572,987.290 $4,989,386.700