MIDLAND SH 349 (0380-18-013)

Items: 49

County: MIDLAND
Length: 0.0000 MILES
Highway: SH 349
District: ODESSA
Control Number: 0380-18-013
DBE Goal: 0.0%
Project: BR 2B25(102)
Guaranty: $49,000.00
Time: 184 WORKING DAYS
Engineer's Estimate: $2,220,100.23
Date: 11/05/2025 (7 months ago)
Contract Number: 11253016
Type: BRIDGE MAINTENANCE
Project ID: A00211088
Contract Type: Federal
Project Description: BRIDGE MAINTENANCE
Mail/Deliver Bids To: N/A
ODA-PRELETTINGQUESTIONS
Actions:
Notice Questions HCS Excel Tabs Print Print Notice
Pay Estimates:
Bidders (4)
E
Engineer's Estimate
$2,220,100.23
$1,829,294.00
Over/Under Est: -17.6% -$390,806.23
Over/Under Est: -10.4% -$230,878.43
Amt Left: 8.74% $159,927.80
Over/Under Est: 3.22% $71,399.65
Amt Left: 25.27% $462,205.88
Delta: -15.20% -$302,278.08
$2,947,672.00
Over/Under Est: 32.77% $727,571.77
Amt Left: 61.14% $1,118,378.00
Delta: -28.64% -$656,172.12
Subcontractor Percentage Amount
TRP CONSTRUCTION GROUP, LLC 4.27% $78,110.85
IVS HYDRO, INC 2.90% $53,049.53
MORRIS COUNTY CONTRACTORS, L.L.C. 2.15% $39,329.82
A-CORE CONCRETE CUTTING, INC. 1.30% $23,780.82
ROCKIN C MILLING 1.04% $19,024.66
PEYSON TRANSPORT, LLC 0.64% $11,707.48
Total: 12.30% $225,003.16

Bid Items & Bid Tabulations

49 Total 0 of 49
MIDLAND  |  SH 349  |  ODESSA  |  0380-18-013  |  11/05/2025  |  $2,220,100.23  |  BR 2B25(102)  |  BRIDGE MAINT  |  184 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
RAGLE CONSTRUCTION, INC.
SCOUT 5 CONSTRUCTION LLC
GIBSON & ASSOCIATES, INC.
DAN WILLIAMS COMPANY
FLOWABLE FILL (EMBANKMENT)
CY 24.000 $500.000 $280.000 $175.000 $600.000 $650.000
EPOXY WATERPROOF FINISH (TY X)
SF 6,203.000 $15.000 $9.000 $5.000 $9.900 $15.000
PENETRATING CONCRETE SURFACE TREATMENT
SY 8,450.000 $15.000 $8.000 $5.000 $19.800 $27.000
CONC STR REPAIR (EPOXY MORTAR)
SF 11.000 $200.000 $250.000 $25.000 $548.900 $600.000
CONC STR REPAIR(RAPID DECK REP(PRT DPT)
SF 39.000 $275.000 $175.000 $150.000 $368.500 $595.000
CONC STR REPAIR(DECK REP (FULL DEPTH))
SF 1,140.000 $180.000 $140.000 $150.000 $231.000 $115.000
CONC STR REPAIR (VERTICAL & OVERHEAD)
SF 268.000 $385.000 $150.000 $150.000 $247.500 $325.000
CONC STR REPAIR (STANDARD)
SF 76.000 $200.000 $150.000 $100.000 $198.000 $325.000
RIPRAP (CONC)(FLUME)
CY 13.000 $900.000 $650.000 $1,000.000 $1,650.000 $1,500.000
CLEANING AND SEALING EXIST JOINTS (CL5)
LF 266.000 $50.000 $30.000 $30.000 $25.300 $50.000
CLEANING EXISTING JOINTS
LF 500.000 $40.000 $23.000 $25.000 $31.900 $50.000
RESIZING AND SEALING JOINTS
LF 160.000 $80.000 $65.000 $50.000 $82.500 $75.000
CONCRETE OVERLAY (3 IN)
SY 1,479.000 $150.000 $150.000 $100.000 $186.500 $125.000
MULTI-LAYER POLYMER OVERLAY
SY 2,892.000 $70.000 $45.000 $35.000 $44.000 $85.000
POLYESTER POLYMER CONC OVERLAY (1")
SY 340.000 $275.000 $225.000 $400.000 $355.000 $450.000
RAIL (TY SSTR)(HPC)
LF 570.000 $200.000 $98.000 $80.000 $163.900 $115.000
RETROFIT RAIL (TY SSTR)(HPC)
LF 56.000 $425.000 $40.000 $350.000 $209.000 $300.000
HYDRO-DEMOLITION (3 IN)
SY 1,479.000 $160.000 $105.000 $50.000 $39.000 $275.000
MICROMILLING CONCRETE SLAB (1 IN)
SY 340.000 $32.000 $60.000 $300.000 $134.200 $60.000
REMOVE STR (RAIL)
LF 570.000 $60.000 $7.000 $500.000 $40.000 $5.000
MOBILIZATION
LS 1.000 $188,190.930 $180,000.000 $250,000.000 $394,000.000 $290,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 10.000 $15,000.000 $25,000.000 $0.010 $21,000.000 $45,000.000
PORTABLE CHANGEABLE MESSAGE SIGN
EA 4.000 $14,350.000 $25,000.000 $50,000.000 $14,000.000 $17,500.000
TMA (STATIONARY)
DAY 70.000 $175.000 $975.000 $0.010 $687.000 $285.000
MTL W-BEAM GD FEN (STEEL POST)
LF 400.000 $42.000 $28.000 $25.000 $30.800 $50.000
MTL BEAM GD FEN TRANS (THRIE-BEAM)
EA 4.000 $2,325.000 $2,000.000 $2,500.000 $2,200.000 $4,500.000
REMOVE METAL BEAM GUARD FENCE
LF 400.000 $6.000 $3.000 $15.000 $3.300 $7.000
RM MTL BM GD FEN TRANS (T101)
EA 4.000 $260.000 $150.000 $1,000.000 $165.000 $450.000
GUARDRAIL END TREATMENT (INSTALL)
EA 4.000 $3,850.000 $3,200.000 $3,500.000 $3,520.000 $5,000.000
GUARDRAIL END TREATMENT (REMOVE)
EA 4.000 $300.000 $200.000 $500.000 $220.000 $450.000
INSTL DEL ASSM (D-SW)SZ 1(BRF)CTB
EA 6.000 $25.000 $45.000 $50.000 $49.500 $100.000
INSTL DEL ASSM (D-SW)SZ 1(BRF)CTB (BI)
EA 6.000 $42.000 $45.000 $50.000 $49.500 $100.000
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI)
EA 12.000 $40.000 $45.000 $50.000 $49.500 $100.000
INSTL DEL ASSM (D-SY)SZ 1(BRF)CTB
EA 12.000 $42.000 $45.000 $50.000 $49.500 $100.000
PAVEMENT SLER 6"
LF 4,842.000 $0.900 $2.500 $15.000 $0.500 $2.500
PREFAB PM TY B (W)(6")(SLD)
LF 2,211.000 $10.500 $8.500 $15.000 $7.700 $8.500
PREFAB PM TY B (W)(6")(BRK)CONTRAST
LF 420.000 $17.500 $15.000 $15.000 $15.400 $15.000
PREFAB PM TY B (Y)(6")(SLD)
LF 2,211.000 $7.500 $8.500 $15.000 $7.700 $8.500
REFL PAV MRKR TY I-C
EA 21.000 $11.500 $20.000 $25.000 $11.000 $20.000
REFL PAV MRKR TY II-A-A
EA 9.000 $12.500 $20.000 $25.000 $11.000 $20.000
ELIM EXT PM & MRKS (6")
LF 1,746.000 $3.750 $4.000 $3.500 $0.500 $4.000
PAV SURF PREP FOR MRK (6")
LF 4,842.000 $3.000 $3.000 $5.000 $0.440 $3.000
REPLACE RAIL ELEMENT (W-BEAM)
LF 150.000 $35.000 $16.000 $50.000 $17.600 $20.000
REPLACE STEEL POST W/O CONC FND
EA 8.000 $60.000 $80.000 $100.000 $88.000 $250.000
CONCRETE RAIL REPAIR (IN-KIND)
LF 5.000 $400.000 $600.000 $500.000 $1,500.000 $2,000.000
CONC CRCK REPR(DISCRETE)(ROUT AND SEAL)
LF 90.000 $150.000 $35.000 $50.000 $27.500 $100.000
CNC CRACK REPAIR (DISCRETE)(SURF SEAL)
LF 43.000 $120.000 $35.000 $50.000 $68.200 $100.000
BRIDGE JOINT REPLACEMENT (SEJ)
LF 80.000 $650.000 $350.000 $500.000 $487.500 $850.000
CONCRETE BEAM REPAIR (CFRP)
EA 5.000 $10,000.000 $4,500.000 $500.000 $4,290.000 $20,000.000
Totals: $2,220,100.230 $1,829,294.000 $1,989,221.800 $2,291,499.880 $2,947,672.000