MIDLAND BS 349C (0380-09-098)

Items: 100

County: MIDLAND
Length: N/A
Highway: BS 349C
District: ODESSA
Control Number: 0380-09-098
DBE Goal: N/A
Project: F 2022(585)
Guaranty: N/A
Time: 300 WORKING DAYS
Engineer's Estimate: $13,839,757.59
Date: 12/02/2022 (3 years ago)
Contract Number: N/A
Type: REHABILITATE EXISTING ROADWAY
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice HCS Excel Tabs Print Print Notice
Bidders (3)
E
Engineer's Estimate
$13,839,757.59
Over/Under Est: 30.04% $4,157,900.54
$19,338,273.62
Over/Under Est: 39.73% $5,498,516.03
Amt Left: 7.45% $1,340,615.49
$19,735,692.57
Over/Under Est: 42.6% $5,895,934.98
Amt Left: 9.66% $1,738,034.44
Delta: -2.06% -$397,418.95
Subcontractor Percentage Amount
DESERT PAVING, INC. 18.05% $3,248,577.29
HJC FARMS, INC. 2.67% $480,537.47
DK CONTRACTING, LLC 2.52% $453,540.98
O. TREVINO CONSTRUCTION, LLC 2.38% $428,344.26
DOUBLE A CONTRACTING, L.P. 2.26% $406,747.07
DUSTROL, INC. 1.96% $352,754.10
AARON CONCRETE CONTRACTORS, LLC 1.34% $241,168.62
CONTRACTORS SERVICE, LTD. 1.22% $219,571.43
R.E.B.D. TRUCKING LLC 0.32% $57,592.51
BOLER EQUIPMENT 0.13% $23,396.96
STREET FOUNDATION DRILLING, INC. 0.07% $12,598.36
ROYAL REBAR 0.04% $7,199.06
Total: 32.96% $5,932,028.11

Bid Items & Bid Tabulations

100 Total 0 of 100
MIDLAND  |  BS 349C  |  ODESSA  |  0380-09-098  |  12/02/2022  |  $13,839,757.59  |  F 2022(585)  |  REHAB EXIST ROADWAY  |  300 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
JONES BROS. DIRT & PAVING CONTRACTORS, INC.
RK HALL, LLC
REECE ALBERT, INC.
REMOVING CONC (MEDIANS)
SY 1,155.000 $30.000 $90.000 $41.230 $48.090
REMOVING CONC (DRIVEWAYS)
SY 1,192.000 $25.000 $45.000 $47.470 $48.090
REMOVING CONC (CURB AND GUTTER)
LF 5,661.000 $8.000 $19.250 $10.610 $11.250
REMOVING STAB BASE AND ASPH PAV (6")
SY 1,935.000 $4.000 $33.490 $117.470 $5.320
REMOVING STAB BASE AND ASPH PAV(8")
SY 46,961.000 $5.000 $8.380 $9.310 $8.600
REWORK BS MTL (TY D)(SURF)(ORD COMP)
SY 48,932.000 $1.000 $1.320 $1.760 $0.940
PRIME COAT (AE-P)
GAL 9,790.000 $5.000 $4.720 $8.290 $7.100
FOG SEAL (CSS-1H)
GAL 4,699.000 $4.000 $4.280 $5.890 $7.030
ASPH (AC-20-5TR)
GAL 17,846.000 $5.500 $4.650 $5.530 $5.390
AGGR(TY-PB GR-4 SAC-A)
CY 394.000 $245.000 $199.000 $295.520 $360.530
PLAN & TEXT ASPH CONC PAV(4" TO 6")
SY 90,966.000 $5.000 $5.890 $7.120 $5.960
PLANE ASPH CONC PAV (2")
SY 10,735.000 $2.500 $16.780 $21.390 $21.270
PLANE ASPH CONC PAV (3")
SY 52,633.000 $3.000 $3.790 $4.290 $3.850
CONC PVMT (JOINTED - CPCD) (11")
SY 1,686.000 $100.000 $276.000 $276.000 $438.150
CL K CONC (MISC)
CY 13.000 $2,200.000 $2,220.000 $1,800.000 $5,155.950
CL C CONC (RAIL FOUNDATION)(HPC)
CY 384.000 $675.000 $906.000 $2,160.000 $1,089.370
RAIL (TY T80PP-TS)
LF 575.000 $320.000 $775.000 $450.000 $556.490
RETROFIT RAIL (TY T223)(HPC)
LF 224.000 $350.000 $360.000 $480.000 $484.000
RETROFIT RAIL (TY C223)(HPC)
LF 121.000 $350.000 $597.600 $600.000 $532.400
INLET (COMP) (TY SIDEWALK BRIDGE)
EA 1.000 $17,000.000 $43,200.000 $48,000.000 $52,578.990
ADJUSTING MANHOLES
EA 85.000 $1,600.000 $3,000.000 $1,870.380 $3,395.990
ADJUSTING MANHOLES (WATER VALVE BOX)
EA 85.000 $700.000 $1,320.000 $279.520 $1,535.720
ADJUSTING MANHOLES (ELECTRIC BOX)
EA 7.000 $700.000 $1,800.000 $3,546.470 $3,583.000
MOBILIZATION
LS 1.000 $1,237,705.240 $1,720,000.000 $1,569,996.980 $1,260,018.140
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 15.000 $15,000.000 $25,000.000 $30,678.660 $23,993.070
BIODEG EROSN CONT LOGS (INSTL) (8")
LF 630.000 $6.500 $6.700 $10.100 $12.820
BIODEG EROSN CONT LOGS (REMOVE)
LF 630.000 $1.500 $4.400 $3.920 $6.340
PORT CTB (FUR & INST)(LOW PROF)(TY 1)
LF 2,960.000 $50.000 $110.400 $110.400 $44.630
PORT CTB (FUR & INST)(LOW PROF)(TY 2)
LF 80.000 $50.000 $110.400 $110.400 $45.940
PORT CTB (REMOVE)(LOW PROF)(TY 1)
LF 2,960.000 $12.000 $18.000 $18.000 $14.100
PORT CTB (REMOVE)(LOW PROF)(TY 2)
LF 80.000 $14.000 $18.000 $18.000 $15.550
PERM CTB (SGL SLOPE) (TY 1) (42 )
LF 695.000 $125.000 $192.000 $132.000 $166.550
CONC CURB & GUTTER (TY II)
LF 2,000.000 $40.000 $54.000 $102.000 $89.630
DRIVEWAYS (CONC) (FAST TRACK)
SY 4,037.000 $95.000 $286.800 $198.000 $219.000
CONC SIDEWALKS (4")
SY 4,360.000 $90.000 $168.000 $120.000 $154.820
CURB RAMPS (TY 1)
EA 21.000 $3,000.000 $6,300.000 $2,400.000 $5,155.180
CURB RAMPS (TY 2)
EA 4.000 $2,600.000 $6,480.000 $3,000.000 $6,695.720
CURB RAMPS (TY 3)
EA 1.000 $2,600.000 $6,720.000 $3,120.000 $12,356.700
CURB RAMPS (TY 7)
EA 20.000 $2,700.000 $6,480.000 $3,240.000 $5,315.690
CURB RAMPS (TY 10)
EA 15.000 $2,900.000 $6,480.000 $3,360.000 $5,556.690
CURB RAMPS (TY 21)
EA 3.000 $2,800.000 $7,440.000 $4,800.000 $6,902.980
CONC MEDIAN
SY 1,078.000 $120.000 $300.000 $200.020 $199.910
MTL BEAM GD FEN TRANS (THRIE-BEAM)
EA 4.000 $3,000.000 $3,420.000 $3,420.000 $3,815.860
DOWNSTREAM ANCHOR TERMINAL SECTION
EA 2.000 $1,800.000 $1,860.000 $1,860.000 $2,075.290
REMOVE METAL BEAM GUARD FENCE
LF 349.000 $4.000 $3.600 $3.600 $4.020
REMOVE TERMINAL ANCHOR SECTION
EA 2.000 $350.000 $360.000 $360.000 $401.670
GUARDRAIL END TREATMENT (INSTALL)
EA 2.000 $3,900.000 $4,140.000 $4,140.000 $4,619.200
GUARDRAIL END TREATMENT (REMOVE)
EA 2.000 $450.000 $360.000 $360.000 $401.670
CRASH CUSH ATTEN (INSTL)(L)(N)(TL3)
EA 2.000 $30,000.000 $49,800.000 $49,800.000 $71,761.170
MAILBOX INSTALL-S (TWG-POST) TY 2
EA 41.000 $275.000 $327.600 $327.600 $401.670
MAILBOX INSTALL-D (TWG-POST) TY 2
EA 2.000 $350.000 $422.400 $422.400 $468.620
REPLACE EXISTING ALUMINUM SIGNS(TY A)
SF 240.000 $50.000 $51.600 $51.600 $38.160
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
EA 142.000 $900.000 $984.000 $984.000 $1,251.870
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
EA 7.000 $850.000 $1,116.000 $1,116.000 $1,372.370
IN SM RD SN SUP&AM TY10BWG(1)SA(U)
EA 3.000 $1,350.000 $1,434.000 $1,434.000 $1,666.930
IN SM RD SN SUP&AM TY10BWG(1)SB(T)
EA 3.000 $1,000.000 $1,167.600 $1,167.600 $1,472.790
IN SM RD SN SUP&AM TYS80(1)SA(P)
EA 7.000 $1,100.000 $1,216.800 $1,216.800 $1,439.320
IN SM RD SN SUP&AM TYS80(1)SA(T-2EXT)
EA 3.000 $1,700.000 $1,620.000 $1,620.000 $1,874.460
IN SM RD SN SUP&AM TYS80(1)SA(U)
EA 7.000 $1,600.000 $1,699.200 $1,699.200 $1,874.460
IN SM RD SN SUP&AM TYS80(1)SA(U-1EXT)
EA 1.000 $1,400.000 $1,902.000 $1,902.000 $2,075.290
IN SM RD SN SUP&AM TYS80(1)SA(U-BM)
EA 1.000 $1,600.000 $1,885.200 $1,885.200 $1,981.570
IN BRIDGE MNT CLEARANCE SGN ASSM(TY N)
EA 2.000 $2,500.000 $3,924.000 $3,924.000 $5,020.870
IN SM RD SN SUP&AM (RAIL MOUNT)
EA 7.000 $3,800.000 $6,933.600 $6,933.600 $8,669.360
RELOCATE SM RD SN SUP&AM(SIGN ONLY)
EA 39.000 $400.000 $483.600 $483.600 $669.450
REMOVE SM RD SN SUP&AM
EA 178.000 $180.000 $330.000 $276.620 $167.360
WK ZN PAV MRK NON-REMOV (W)4"(BRK)
LF 12,870.000 $0.300 $0.190 $0.190 $0.210
WK ZN PAV MRK NON-REMOV (W)4"(SLD)
LF 389,186.000 $0.250 $0.180 $0.180 $0.200
WK ZN PAV MRK NON-REMOV (W)8"(DOT)
LF 1,103.000 $0.750 $0.960 $0.960 $1.070
WK ZN PAV MRK NON-REMOV (W)8"(SLD)
LF 3,973.000 $0.600 $0.480 $0.480 $0.540
WK ZN PAV MRK NON-REMOV (W)24"(SLD)
LF 14,972.000 $5.000 $2.160 $2.160 $2.410
WK ZN PAV MRK NON-REMOV (Y)4"(BRK)
LF 6,800.000 $0.300 $0.190 $0.190 $0.210
WK ZN PAV MRK NON-REMOV (Y)4"(SLD)
LF 417,404.000 $0.250 $0.180 $0.180 $0.200
WK ZN PAV MRK SHT TERM (TAB)TY W
EA 8,507.000 $1.500 $2.000 $6.460 $2.330
WK ZN PAV MRK SHT TERM (TAB)TY Y-2
EA 10,528.000 $1.500 $2.000 $5.520 $2.360
REFL PAV MRK TY I (W)8"(DOT)(100MIL)
LF 615.000 $2.200 $2.160 $2.160 $2.410
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
LF 4,873.000 $1.100 $1.080 $1.080 $1.210
RE PM W/RET REQ TY I (W)4"(BRK)(100MIL)
LF 12,300.000 $0.500 $0.780 $0.780 $0.870
RE PM W/RET REQ TY I (Y)4"(BRK)(100MIL)
LF 6,800.000 $0.500 $0.780 $0.780 $0.870
RE PM W/RET REQ TY I (Y)4"(SLD)(100MIL)
LF 40,845.000 $0.500 $0.760 $0.760 $0.840
PREFAB PAV MRK TY B (W)(4")(BRK)CNTST
LF 540.000 $20.000 $15.600 $15.600 $17.410
PREFAB PAV MRK TY B (Y)(4")(SLD)
LF 2,116.000 $8.000 $13.200 $13.200 $14.730
PREFAB PAV MRK TY C (W) (24") (SLD)
LF 7,488.000 $15.000 $14.400 $14.400 $16.070
PREFAB PAV MRK TY C (W) (ARROW)
EA 34.000 $250.000 $330.000 $330.000 $368.200
PREFAB PAV MRK TY C (W) (36")(YLD TRI)
EA 19.000 $35.000 $24.000 $24.000 $26.780
REFL PAV MRKR TY I-C
EA 903.000 $4.500 $4.800 $4.800 $5.360
REFL PAV MRKR TY II-A-A
EA 1,290.000 $4.000 $4.800 $4.800 $5.360
ELIM EXT PAV MRK & MRKS (4")
LF 75,711.000 $0.500 $1.000 $1.000 $0.640
ELIM EXT PAV MRK & MRKS (24")
LF 546.000 $3.500 $1.800 $1.800 $2.010
PAV SURF PREP FOR MRK (4")
LF 2,656.000 $0.250 $0.660 $0.660 $0.740
CAM (ASPHALT) PG(76-22)
TON 632.000 $150.000 $955.000 $1,158.760 $1,071.120
CAM (AGGREGATE)
TON 7,665.000 $150.000 $125.000 $142.340 $138.350
SP MIXES SP-B SAC-B PG70-22
TON 15,594.000 $125.000 $111.000 $135.760 $149.370
TACK COAT
GAL 4,729.000 $4.500 $3.700 $9.300 $2.970
STONE-MTRX-ASPH SMAR-F SAC-A
TON 22,185.000 $185.000 $185.000 $217.760 $249.120
TACK COAT
GAL 15,307.000 $4.500 $3.700 $5.700 $2.900
BONDING COURSE
GAL 19,098.000 $5.500 $4.580 $6.650 $2.900
PORTABLE CHANGEABLE MESSAGE SIGN
EA 4.000 $17,500.000 $19,250.000 $21,579.920 $26,813.100
TMA (STATIONARY)
DAY 620.000 $200.000 $165.000 $446.760 $482.000
TMA (MOBILE OPERATION)
DAY 116.000 $450.000 $935.000 $631.380 $983.770
FLOOD GAUGE ASSEMBLY
EA 2.000 $500.000 $483.600 $483.600 $1,338.900
Totals: $13,839,757.590 $17,997,658.130 $19,338,273.620 $19,735,692.570