Show Job Controls
Bid Cobra

MIDLAND SH 349 (0380-09-081)

Items: 55

County: MIDLAND
Length: N/A
Highway: SH 349
District: ODESSA
Control Number: 0380-09-081
DBE Goal: N/A
Project: STP 2017(326)
Guaranty: N/A
Time: 100 WORKING DAYS
Engineer's Estimate: $5,968,225.01
Date: 01/04/2017 (9 years ago)
Contract Number: N/A
Type: ROADWAY REHABILITATION
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice HCS Excel Tabs Print Print Notice
Pay Estimates:
Bidders (4)
E
Engineer's Estimate
$5,968,225.01
$3,699,830.35
Over/Under Est: -38.01% -$2,268,394.66
$3,912,938.00
Over/Under Est: -34.44% -$2,055,287.01
Amt Left: 5.76% $213,107.65
$4,183,391.45
Over/Under Est: -29.91% -$1,784,833.56
Amt Left: 13.07% $483,561.10
Delta: -6.91% -$270,453.45
Over/Under Est: -24.39% -$1,455,637.40
Amt Left: 21.97% $812,757.26
Delta: -7.87% -$329,196.16

Bid Items & Bid Tabulations

55 Total 0 of 55
MIDLAND  |  SH 349  |  ODESSA  |  0380-09-081  |  01/04/2017  |  $5,968,225.01  |  STP 2017(326)  |  ROADWAY REHAB  |  100 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
PRICE CONSTRUCTION, LTD.
REECE ALBERT, INC.
FNF CONSTRUCTION, INC.
JONES BROS. DIRT & PAVING CONTRACTORS, INC.
REMOVING STAB BASE AND ASPH PAV (3"-5")
SY 111,804.000 $4.000 $1.830 $2.050 $4.000 $3.060
BACKFILL (TY B)
LF 100.000 $70.000 $6.380 $10.500 $20.000 $41.000
BLADING
HR 5.000 $300.000 $191.790 $365.000 $128.000 $425.000
PROOF ROLLING
HR 5.000 $375.000 $102.490 $79.000 $76.000 $175.000
REWORK BS MTL (TY D)(SURF)(ORD COMP)
SY 111,804.000 $1.000 $0.860 $0.700 $0.750 $1.380
PRIME COAT (MC-30)
GAL 24,456.000 $3.700 $3.620 $3.550 $4.200 $4.140
FOG SEAL (CSS-1H)
GAL 22,470.000 $3.000 $2.060 $1.150 $2.350 $2.950
SUPERPAVE MIXTURES SP-B PG70-22
TON 20,205.000 $120.000 $68.000 $75.750 $67.250 $86.480
SUPERPAVE MIXTURES SP-D SAC-A PG70-22
TON 17,259.000 $120.000 $82.000 $78.900 $77.500 $80.920
PLANE ASPH CONC PAV (6.5")
SY 9,438.000 $6.000 $5.930 $7.200 $5.000 $7.620
PLANE ASPH CONC PAV (5.5")
SY 1,112.000 $4.000 $2.530 $8.450 $8.500 $9.190
CL A CONC (MISC)
CY 20.000 $1,200.000 $523.700 $503.000 $780.000 $988.900
CLEAN EXIST CULVERTS
EA 1.000 $7,000.000 $882.020 $840.000 $4,400.000 $3,421.000
MOBILIZATION
LS 1.000 $335,000.000 $154,349.000 $221,066.640 $416,124.100 $290,500.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 5.000 $11,000.000 $8,250.000 $14,235.000 $10,000.000 $13,000.000
BIODEG EROSN CONT LOGS (INSTL) (18")
LF 520.000 $15.000 $6.420 $14.450 $9.000 $12.000
BIODEG EROSN CONT LOGS (REMOVE)
LF 520.000 $6.000 $4.700 $1.500 $1.000 $5.000
CONC CURB & GUTTER (TY II)
LF 110.000 $60.000 $24.260 $28.800 $67.000 $83.600
DOWNSTREAM ANCHOR TERMINAL SECTION
EA 2.000 $1,500.000 $1,323.030 $1,102.500 $1,300.000 $1,430.000
MTL BM GD FEN (LONG SPAN SYSTEM)
LF 100.000 $22.000 $49.610 $24.150 $46.000 $23.100
REMOVE METAL BEAM GUARD FENCE
LF 200.000 $12.000 $5.510 $1.580 $5.250 $3.300
REMOVE TERMINAL ANCHOR SECTION
EA 4.000 $250.000 $330.760 $194.250 $310.000 $330.000
GUARDRAIL END TREATMENT (INSTALL)
EA 2.000 $2,530.000 $4,410.090 $2,677.500 $4,100.000 $2,420.000
MAILBOX INSTALL-S (TWW-POST) TY 4
EA 45.000 $200.000 $192.940 $183.750 $200.000 $192.500
MAILBOX INSTALL-D (TWW-POST) TY 4
EA 13.000 $275.000 $275.630 $262.500 $300.000 $275.000
MAILBOX INSTALL-M (TWW-POST) TY 4
EA 5.000 $600.000 $716.640 $682.500 $700.000 $742.500
REPLACE EXISTING ALUMINUM SIGNS(TY A)
SF 90.000 $35.000 $24.260 $23.100 $25.000 $24.200
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
EA 30.000 $750.000 $771.770 $735.000 $750.000 $770.000
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
EA 4.000 $950.000 $826.890 $787.500 $800.000 $825.000
IN SM RD SN SUP&AM TY10BWG(1)SA(U)
EA 3.000 $1,200.000 $937.140 $892.500 $900.000 $984.500
IN SM RD SN SUP&AM TY10BWG(2)SA(P)
EA 1.000 $1,400.000 $1,433.280 $1,365.000 $1,400.000 $1,485.000
IN SM RD SN SUP&AM TYS80(1)SA(P)
EA 3.000 $1,100.000 $937.140 $892.500 $900.000 $825.000
IN SM RD SN SUP&AM TYS80(1)SA(T)
EA 1.000 $1,400.000 $1,102.520 $1,050.000 $1,100.000 $935.000
IN SM RD SN SUP&AM TYS80(1)SA(U-1EXT)
EA 2.000 $1,600.000 $1,212.780 $1,155.000 $1,200.000 $1,100.000
IN SM RD SN SUP&AM TYS80(1)SA(U-2EXT)
EA 1.000 $1,800.000 $1,323.030 $1,260.000 $1,300.000 $1,320.000
REMOVE SM RD SN SUP&AM
EA 46.000 $150.000 $110.250 $105.000 $120.000 $100.000
REMOVE SM RD SN SUP&AM (SIGN ONLY)
EA 10.000 $50.000 $44.100 $42.000 $45.000 $450.000
REMOVE LRSA
EA 1.000 $700.000 $2,205.050 $2,100.000 $2,200.000 $2,750.000
WK ZN PAV MRK NON-REMOV (W)4"(BRK)
LF 10,448.000 $0.140 $0.180 $0.170 $0.170 $0.180
WK ZN PAV MRK NON-REMOV (W)4"(SLD)
LF 41,787.000 $0.150 $0.150 $0.150 $0.170 $0.150
WK ZN PAV MRK NON-REMOV (Y)4"(BRK)
LF 10,448.000 $0.250 $0.180 $0.170 $0.170 $0.180
WK ZN PAV MRK NON-REMOV (Y)4"(SLD)
LF 41,787.000 $0.150 $0.150 $0.150 $0.170 $0.150
WK ZN PAV MRK SHT TERM (TAB)TY W
EA 3,135.000 $2.000 $1.820 $2.500 $2.000 $1.750
WK ZN PAV MRK SHT TERM (TAB)TY Y-2
EA 5,224.000 $2.250 $1.820 $2.500 $2.000 $1.750
RE PM W/RET REQ TY I (W)4"(BRK)(100MIL)
LF 10,448.000 $0.400 $0.370 $0.360 $0.400 $0.370
RE PM W/RET REQ TY I (W)4"(SLD)(100MIL)
LF 41,787.000 $0.520 $0.360 $0.350 $0.400 $0.360
RE PM W/RET REQ TY I (Y)4"(BRK)(100MIL)
LF 10,448.000 $0.450 $0.370 $0.360 $0.400 $0.370
RE PM W/RET REQ TY I (Y)4"(SLD)(100MIL)
LF 41,787.000 $0.450 $0.360 $0.350 $0.400 $0.360
PREFAB PAV MRK TY C (W) (24") (SLD)
LF 560.000 $20.000 $15.440 $14.700 $16.000 $15.400
PREFAB PAV MRK TY C (W) (ARROW)
EA 44.000 $250.000 $198.450 $189.000 $200.000 $198.000
PREFAB PAV MRK TY C (W) (WORD)
EA 44.000 $270.000 $242.560 $231.000 $250.000 $242.000
PREFAB PAV MRK TY C (W) (36")(YLD TRI)
EA 10.000 $60.000 $27.560 $26.250 $28.000 $27.500
REFL PAV MRKR TY I-C
EA 524.000 $3.600 $3.310 $3.150 $3.500 $3.300
REFL PAV MRKR TY II-A-A
EA 1,046.000 $3.400 $2.760 $2.630 $3.000 $2.750
PORTABLE CHANGEABLE MESSAGE SIGN
EA 2.000 $20,000.000 $6,768.990 $14,032.000 $25,000.000 $18,700.000
Totals: $5,968,225.010 $3,699,830.350 $3,912,938.000 $4,183,391.450 $4,512,587.610