Show Job Controls
Bid Cobra

MEDINA FM 1796 (0595-02-024)

Items: 58

County: MEDINA
Length: N/A
Highway: FM 1796
District: SAN ANTONIO
Control Number: 0595-02-024
DBE Goal: N/A
Project: BR 2022(555)
Guaranty: N/A
Time: 176 WORKING DAYS
Engineer's Estimate: $1,581,577.00
Date: 06/02/2022 (4 years ago)
Contract Number: N/A
Type: BRIDGE REPLACEMENT
Mail/Deliver Bids To: N/A
MARSHALL HEAP
JOSE C MENDEZ
Actions:
Notice HCS Excel Tabs Print Print Notice
Bidders (3)
E
Engineer's Estimate
$1,581,577.00
$1,743,784.50
Over/Under Est: 10.26% $162,207.50
$1,808,003.40
Over/Under Est: 14.32% $226,426.40
Amt Left: 3.68% $64,218.90
Over/Under Est: 33.91% $536,379.10
Amt Left: 21.46% $374,171.60
Delta: -17.14% -$309,952.70

Bid Items & Bid Tabulations

58 Total 0 of 58
MEDINA  |  FM 1796  |  SAN ANTONIO  |  0595-02-024  |  06/02/2022  |  $1,581,577.00  |  BR 2022(555)  |  BRIDGE REPL  |  176 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
DELGADO'S CONTRACTORS, LLC
RELMCO, INC.
ACME BRIDGE COMPANY, INC.
PREPARING ROW
STA 6.850 $10,000.000 $2,000.000 $10,000.000 $4,780.000
REMOVING CONC (RIPRAP)
SY 1,197.000 $15.000 $10.000 $20.000 $19.600
EXCAVATION (ROADWAY)
CY 357.000 $18.000 $10.000 $30.000 $34.300
EMBANKMENT (FINAL)(ORD COMP)(TY C)
CY 332.000 $15.000 $20.000 $50.000 $50.300
COMPOST MANUF TOPSOIL (4")
SY 3,880.000 $3.000 $2.000 $6.000 $7.100
DRILL SEEDING (PERM) (RURAL) (CLAY)
SY 3,880.000 $0.500 $1.000 $0.440 $0.450
DRILL SEED (TEMP)(WARM OR COOL)
SY 3,880.000 $0.500 $1.000 $0.390 $0.400
VEGETATIVE WATERING
MG 122.000 $41.000 $25.000 $50.000 $74.700
SOIL RETENTION BLANKETS (CL 1) (TY C)
SY 3,880.000 $2.000 $2.500 $1.260 $1.300
PROOF ROLLING
HR 16.000 $130.000 $100.000 $100.000 $111.000
AGGR(TY-PB GR-4 SAC-B)
CY 34.000 $515.000 $110.000 $250.000 $705.000
ASPH (AC-15P OR AC-10-2TR)
GAL 2,427.000 $8.500 $20.000 $8.000 $15.800
PLANE ASPH CONC PAV (2")
SY 667.000 $10.000 $15.000 $35.000 $40.000
DRILL SHAFT (18 IN)
LF 652.000 $245.000 $275.000 $315.000 $242.000
CL C CONC (ABUT)(EXTEND)
CY 6.000 $1,280.000 $4,000.000 $7,786.800 $5,980.000
CL C CONC (CAP)(EXTEND)
CY 18.000 $3,000.000 $4,500.000 $5,300.400 $8,160.000
CL C CONC (COLUMN)
CY 16.500 $1,235.000 $1,400.000 $4,942.000 $3,320.000
SLAB SPAN (EXTEND)
CY 155.000 $1,250.000 $2,500.000 $1,267.000 $2,200.000
CONC STR REPAIR (VERTICAL & OVERHEAD)
SF 3.000 $300.000 $300.000 $1,200.000 $2,500.000
RIPRAP (MOW STRIP)(4 IN)
CY 34.000 $640.000 $480.000 $485.000 $1,260.000
CLEANING AND SEALING EXISTING JOINTS
LF 274.000 $15.000 $40.000 $50.000 $40.600
RAIL (TY T631)
LF 524.000 $140.000 $110.000 $93.500 $90.200
GABIONS (GALV)
CY 318.000 $215.000 $275.000 $265.000 $293.000
GABION MATTRESSES (GALV)(12 IN)
SY 1,204.000 $175.000 $110.000 $85.000 $112.000
MOBILIZATION
LS 1.000 $200,000.000 $150,000.000 $175,000.000 $170,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 11.000 $5,000.000 $1,700.000 $6,500.000 $5,350.000
ROCK FILTER DAMS (INSTALL) (TY 1)
LF 220.000 $30.000 $35.000 $31.900 $32.700
ROCK FILTER DAMS (REMOVE)
LF 220.000 $14.000 $3.500 $11.000 $11.300
CONSTRUCTION EXITS (INSTALL) (TY 1)
SY 444.000 $20.000 $28.000 $25.300 $26.000
CONSTRUCTION EXITS (REMOVE)
SY 444.000 $7.250 $5.000 $11.000 $11.300
TEMP SEDMT CONT FENCE (INSTALL)
LF 2,910.000 $4.000 $3.500 $3.130 $3.200
TEMP SEDMT CONT FENCE (REMOVE)
LF 2,910.000 $0.750 $1.000 $1.370 $1.400
CONSTRUCTING DETOURS
SY 184.000 $60.000 $100.000 $90.000 $239.000
ONE-WAY TRAF CONT (PORT TRAF SIG)
MO 8.000 $4,000.000 $4,800.000 $6,000.000 $3,390.000
PORT CTB (FUR & INST)(LOW PROF)(TY 1)
LF 1,000.000 $40.000 $62.000 $40.000 $128.000
PORT CTB (FUR & INST)(LOW PROF)(TY 2)
LF 40.000 $50.000 $70.000 $20.000 $138.000
PORT CTB (MOVE)(LOW PROF)(TY 1)
LF 2,000.000 $8.000 $5.000 $15.000 $1.650
PORT CTB (MOVE)(LOW PROF)(TY 2)
LF 80.000 $12.000 $8.000 $15.000 $1.650
PORT CTB (REMOVE)(LOW PROF)(TY 1)
LF 1,000.000 $7.000 $5.000 $18.000 $27.400
PORT CTB (REMOVE)(LOW PROF)(TY 2)
LF 40.000 $10.000 $10.000 $18.000 $27.400
MTL W-BEAM GD FEN (TIM POST)
LF 550.000 $50.000 $30.000 $26.400 $31.400
GUARDRAIL END TREATMENT (INSTALL)
EA 4.000 $3,800.000 $3,300.000 $3,355.000 $3,990.000
IN SM RD SN SUP&AM TY10BWG(1)SA(U)
EA 4.000 $900.000 $1,000.000 $800.000 $1,640.000
REMOVE SM RD SN SUP&AM
EA 2.000 $110.000 $250.000 $150.000 $503.000
INSTL DEL ASSM (D-SW)SZ (BRF)GF1 (BI)
EA 10.000 $25.000 $25.000 $50.000 $51.000
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI)
EA 20.000 $30.000 $30.000 $50.000 $38.100
WK ZN PAV MRK REMOV (W)4"(SLD)
LF 4,680.000 $0.650 $1.500 $2.200 $2.650
WK ZN PAV MRK REMOV (W)24"(SLD)
LF 40.000 $7.250 $33.000 $11.000 $13.300
WK ZN PAV MRK REMOV (Y)4"(SLD)
LF 2,800.000 $0.650 $1.500 $2.200 $2.650
PAVEMENT SEALER 4"
LF 4,170.000 $0.150 $0.750 $1.650 $2.000
RE PM W/RET REQ TY I (W)4"(SLD)(100MIL)
LF 1,370.000 $0.400 $2.500 $1.650 $2.000
RE PM W/RET REQ TY I (Y)4"(SLD)(100MIL)
LF 2,800.000 $0.350 $2.500 $1.650 $2.000
REFL PAV MRKR TY II-A-A
EA 36.000 $20.000 $55.000 $11.000 $13.300
ELIM EXT PAV MRK & MRKS (4")
LF 2,800.000 $0.350 $1.100 $1.100 $1.350
CNC CRACK REPAIR (DISCRETE)(INJECT)
LF 15.000 $90.000 $100.000 $150.000 $320.000
D-GR HMA TY-B PG70-22
TON 968.000 $115.000 $185.000 $165.000 $198.000
INSTALL BRIDGE IDENTIFICATION NUMBERS
EA 2.000 $375.000 $400.000 $800.000 $355.000
PORTABLE CHANGEABLE MESSAGE SIGN
EA 2.000 $12,000.000 $12,500.000 $16,000.000 $19,200.000
Totals: $1,581,577.000 $1,743,784.500 $1,808,003.400 $2,117,956.100