Show Job Controls
Bid Cobra

MCLENNAN SH0006 (6413-61-001)

Items: 42

County: MCLENNAN
Length: N/A
Highway: SH0006
District: WACO
Control Number: 6413-61-001
DBE Goal: N/A
Project: RMC - 641361001
Guaranty: N/A
Time: 365 CALENDAR DAYS
Engineer's Estimate: $1,251,914.00
Date: 10/07/2022 (3 years ago)
Contract Number: N/A
Type: BRIDGE RAIL REPAIR
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice HCS Excel Tabs Print Print Notice
Documents:
Bidders (3)
E
Engineer's Estimate
$1,251,914.00
$970,926.00
Over/Under Est: -22.44% -$280,988.00
$1,091,495.00
Over/Under Est: -12.81% -$160,419.00
Amt Left: 12.42% $120,569.00
Over/Under Est: 15.82% $198,027.25
Amt Left: 49.34% $479,015.25
Delta: -32.84% -$358,446.25

Bid Items & Bid Tabulations

42 Total 0 of 42
MCLENNAN  |  SH0006  |  WACO  |  6413-61-001  |  10/07/2022  |  $1,251,914.00  |  RMC - 641361001  |  BRIDGE RAIL REPAIR  |  365 CALENDAR DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
T&L CLEANING SERVICES LLC
DIGG COMMERCIAL, LLC
B & MS CONSTRUCTION, INC.
CONC STR REPAIR (VERTICAL & OVERHEAD)
SF 50.000 $170.000 $25.000 $500.000 $195.000
RAIL (HANDRAIL)(DECORATIVE)
LF 30.000 $100.000 $100.000 $300.000 $103.500
MOBILIZATION (CALLOUT)
EA 12.000 $7,588.000 $1.000 $1.000 $3,500.000
MOBILIZATION (EMERGENCY)
EA 8.000 $2,846.000 $1.000 $1.000 $500.000
MTL W-BEAM GD FEN (STEEL POST)
LF 300.000 $30.000 $30.000 $1.000 $40.250
TERMINAL ANCHOR SECTION
EA 5.000 $200.000 $100.000 $1.000 $550.000
MTL BEAM GD FEN TRANS (THRIE-BEAM)
EA 5.000 $1,600.000 $1,500.000 $1.000 $2,012.500
DOWNSTREAM ANCHOR TERMINAL SECTION
EA 5.000 $1,400.000 $1,200.000 $1.000 $1,725.000
REMOVE METAL BEAM GUARD FENCE
LF 600.000 $3.000 $0.010 $1.000 $5.000
REMOVE TERMINAL ANCHOR SECTION
EA 10.000 $250.000 $1,500.000 $1.000 $287.500
GUARDRAIL END TREATMENT (REMOVE)
EA 10.000 $250.000 $1,500.000 $1.000 $450.000
GDRAIL END TRT(INSTALL)(HBA POST)
EA 40.000 $3,000.000 $1,000.000 $1.000 $2,450.000
CRASH CUSH ATTEN (DES SOURCE)
EA 5.000 $2,000.000 $2,500.000 $1.000 $1,750.000
CRASH CUSH ATTEN (REMOVE)
EA 5.000 $1,000.000 $1.000 $1.000 $690.000
CRASH CUSH ATTEN (INSTL)(R)(N)(TL2)
EA 2.000 $15,000.000 $13,000.000 $1.000 $18,400.000
CRASH CUSH ATTEN (INSTL)(R)(N)(TL3)
EA 2.000 $20,000.000 $14,000.000 $1.000 $26,000.000
CRASH CUSH ATTEN (INSTL)(R)(W)(TL3)
EA 2.000 $25,000.000 $14,000.000 $1.000 $32,000.000
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2
EA 50.000 $35.000 $10.000 $1.000 $35.000
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI)
EA 10.000 $40.000 $10.000 $1.000 $38.000
REPAIR RAIL ELEMENT (W - BEAM)
LF 4,500.000 $30.000 $24.000 $1.000 $35.000
REPAIR RAIL ELEMENT (THRIE - BEAM)
LF 25.000 $40.000 $20.000 $1.000 $51.750
REP RAIL ELMNT(THRIE-BM TRANS TO W -BM)
LF 12.000 $40.000 $20.000 $1.000 $57.500
REM / REPL TIMBER/STL POST W/O CONC FND
EA 200.000 $60.000 $30.000 $1.000 $57.500
REM / REPL TIMBER / STL POST W/CONC FND
EA 100.000 $60.000 $50.000 $1.000 $115.000
REALIGN POSTS
EA 100.000 $40.000 $10.000 $1.000 $42.000
REMOVE & REPLACE BLOCKOUT
EA 1,000.000 $30.000 $10.000 $1.000 $23.000
REMOVE GDRAIL END TRT / REPL WITH SGT
EA 125.000 $3,300.000 $4,500.000 $1.000 $4,600.000
REPAIR RAIL ELEMENT(W - BEAM FURNISHED)
LF 2,000.000 $20.000 $1.000 $1.000 $22.000
REPAIR SINGLE GUARDRAIL TERMINAL
EA 5.000 $500.000 $1.000 $1.000 $2,875.000
REPLACE POSTS (TL-4)
EA 200.000 $170.000 $160.000 $200.000 $188.000
CABLE SPLICE / TURNBUCKLE (TL-4)
EA 2.000 $230.000 $50.000 $1.000 $230.000
REPR OR REPLC CABLE BARR TERM SEC(TL-4)
EA 5.000 $1,500.000 $1,500.000 $1.000 $1,900.000
REPLACE CABLE (TL-4)
LF 7,000.000 $4.000 $0.010 $1.000 $5.750
POST AND CABLE FENCE (NEW INSTALLATION)
LF 200.000 $12.000 $10.000 $1.000 $16.000
POST AND CABLE FENCE (NEW CONC ANCHOR)
EA 5.000 $60.000 $1.000 $1.000 $120.000
POST AND CABLE FENCE(REMV / REPL POSTS)
EA 20.000 $300.000 $100.000 $1.000 $320.000
POST AND CABLE FENCE (REMV/ REPL CABLE)
LF 700.000 $5.000 $3.000 $1.000 $10.000
REMOVE AND REPLACE (TRACC)
EA 5.000 $10,000.000 $1.000 $1.000 $8,395.000
RMV/REPL(VIA-SAND FILL PLASTIC BARRELS)
EA 20.000 $400.000 $1.000 $1.000 $575.000
REPAIR(STEEL POST W/ CHANNEL IRON RAIL)
LF 150.000 $120.000 $100.000 $1.000 $135.000
REPAIR (W-BEAM - T101 RAIL)
LF 250.000 $80.000 $50.000 $1.000 $110.000
TMA (STATIONARY)
DAY 100.000 $160.000 $100.000 $10,000.000 $327.750
Totals: $1,251,914.000 $970,926.000 $1,091,495.000 $1,449,941.250