MCLENNAN FM 2113 (2060-01-039)

Items: 135

County: MCLENNAN
Length: 5.5170 MILES
Highway: FM 2113
District: WACO
Control Number: 2060-01-039
DBE Goal: 5.0%
Project: STP 2025(769)HES
Guaranty: $100,000.00
Time: 300 WORKING DAYS
Engineer's Estimate: $15,103,012.16
Date: 05/01/2025 (1 year ago)
Contract Number: 5253003
Type: REHABILITATE EXISTING ROADWAY
Project ID: A00129124
Contract Type: Federal
Project Description: SAFETY WIDENING
Mail/Deliver Bids To:
TEXAS DEPARTMENT OF TRANSPORTATION
ATTN: CONSTRUCTION DIVISION - RM M1C3.02
6230 E STASSNEY LN, AUSTIN, TX 78744
CLAYTON ZACHA
Actions:
Notice Questions HCS Excel Tabs Print Print Notice
Bidders (3)
E
Engineer's Estimate
$15,103,012.16
$10,809,103.87
Over/Under Est: -28.43% -$4,293,908.29
Over/Under Est: -17.46% -$2,636,567.59
Amt Left: 15.33% $1,657,340.70
Over/Under Est: -15.6% -$2,355,927.87
Amt Left: 17.93% $1,937,980.42
Delta: -2.25% -$280,639.72
Subcontractor Percentage Amount
TRP CONSTRUCTION GROUP, LLC 2.01% $217,268.93
ODUM SERVICES, LLC 1.78% $192,407.31
HIGHWAY TRAFFIC CONTROL & SERVICES, LLC 1.44% $155,655.35
STRUCTURAL INTEGRITY GROUP LLC 1.09% $117,822.45
J. H. ODEN CONTRACTING COMPANY 0.77% $83,232.37
4E TREE WORX LLC 0.67% $72,422.98
A-CORE CONCRETE CUTTING, INC. 0.26% $28,104.44
*AUSTIN TRAFFIC SIGNAL CONSTRUCTION CO., INC. 0.26% $28,104.44
DALLAS LITE AND BARRICADE, INC. 0.22% $23,780.68
PROFESSIONAL TRAFFIC CONTROL LLC 0.08% $8,647.52
Total: 8.58% $927,446.47

Bid Items & Bid Tabulations

135 Total 0 of 135
MCLENNAN  |  FM 2113  |  WACO  |  2060-01-039  |  05/01/2025  |  $15,103,012.16  |  STP 2025(769)HES  |  REHAB EXIST ROADWAY  |  300 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
BIG CREEK CONSTRUCTION, LTD.
KNIFE RIVER CORPORATION - SOUTH
TEXAS MATERIALS GROUP, INC.
PREPARING ROW
STA 289.800 $2,000.000 $1,000.000 $585.000 $500.000
REMOV CONC (RIPRAP)
SY 156.000 $29.000 $25.000 $30.000 $25.000
REMOV CONC (DRIVEWAYS)
SY 1,263.000 $20.000 $25.000 $28.000 $31.000
RMV (0"-4") TRT/UNTRT BASE & ASPH PAV
SY 83,880.000 $24.000 $0.300 $0.010 $0.010
EXCAV (ROADWAY)
CY 8,877.000 $17.250 $17.000 $21.000 $24.000
EMBANK (FNL)(DC)(TY B)
CY 15,547.000 $17.000 $17.000 $21.000 $14.000
FURN & PLACE TOPSOIL (4")
SY 101,242.000 $1.000 $0.500 $0.470 $0.600
DRILL SEED (PERM_RURAL_CLAY)
SY 101,242.000 $0.230 $0.220 $0.180 $0.200
DRILL SEED (TEMP_WARM_COOL)
SY 101,242.000 $0.210 $0.220 $0.160 $0.200
VEGETATIVE WATERING
TGL 1,642.000 $35.000 $20.000 $5.000 $45.000
FL BS (CMP IN PLACE)(TY D GR 3)(IN VEH)
CY 3,287.000 $55.000 $60.000 $80.000 $48.000
FL BS (CMP IN PLC)(TY D GR 5)(FNAL POS)
CY 24,251.000 $75.000 $65.000 $79.000 $70.000
REWORK BS MTL (TY C)(10")(ORD COMP)
SY 110,139.000 $2.500 $2.000 $1.750 $3.000
CEMENT
TON 1,793.000 $270.000 $250.000 $240.000 $230.000
CEMENT TRT (EXIST MATL)(8")
SY 149,374.000 $2.500 $3.000 $2.000 $3.600
EMULS ASPH (BS OR SUBGR TRT)(CSS-1H)
GAL 173,771.000 $3.500 $3.100 $2.000 $3.700
FOG SEAL (CSS-1H)
GAL 13,972.000 $4.500 $5.500 $3.500 $4.600
ASPH (CRS-2)
GAL 62,874.000 $3.500 $3.400 $3.200 $3.200
AGGR (TY-D OR L, GR-4)
CY 1,035.000 $165.000 $140.000 $165.000 $165.000
SP MIXES SP-C SAC-B PG70-22
TON 34,491.000 $100.000 $90.000 $115.000 $125.500
TACK COAT
GAL 29,680.000 $2.050 $3.500 $2.750 $2.900
PLANE ASPH CONC PAV(2" TO 4")
SY 300.000 $2.750 $15.000 $30.000 $42.300
PLANE ASPH CONC PAV(4")
SY 16,755.000 $2.080 $3.000 $2.900 $5.250
CEM STABIL BKFL
CY 88.000 $255.000 $190.000 $220.000 $295.000
FLOWABLE BACKFILL
CY 9.000 $320.000 $275.000 $1,000.000 $375.000
TEMPORARY SPL SHORING
SF 1,260.000 $30.000 $28.000 $27.000 $40.000
CONC STR REPAIR (STANDARD)
SF 100.000 $150.000 $170.000 $153.000 $134.000
RIPRAP (CONC)(5 IN)
CY 39.000 $890.000 $650.000 $570.000 $700.000
RIPRAP (CONC)(FLUME)
CY 34.000 $745.000 $700.000 $700.000 $780.000
RIPRAP (MOW STRIP)(4 IN)
CY 225.000 $650.000 $675.000 $565.000 $675.000
CLEANING AND SEALING EXIST JOINTS (CL3)
LF 88.000 $41.000 $100.000 $100.000 $51.000
CLEANING AND SEALING EXIST JOINTS (CL7)
LF 44.000 $50.000 $85.000 $100.000 $40.000
POLYESTER POLYMER CONC OVERLAY
CY 7.800 $4,500.000 $15,800.000 $13,500.000 $10,800.000
CONC BOX CULV (4 FT X 4 FT)(EXTEND)
LF 20.000 $760.000 $840.000 $1,312.000 $1,320.000
RC PIPE (CL III)(18 IN)
LF 1,270.000 $85.000 $73.000 $70.000 $61.000
RC PIPE (CL III)(24 IN)
LF 72.000 $115.000 $100.000 $160.000 $80.000
RC PIPE (CL III)(30 IN)
LF 194.000 $195.000 $140.000 $300.000 $145.000
RC PIPE (CL III)(42 IN)
LF 20.000 $305.000 $280.000 $350.000 $300.000
JCTBOX(COMPL)(PJB)(3FTX3FT)
EA 1.000 $6,000.000 $5,000.000 $3,400.000 $18,000.000
INLET (COMPL)(PSL)(FG)(3FTX3FT-3FTX3FT)
EA 1.000 $6,600.000 $5,800.000 $3,600.000 $12,000.000
HEADWALL (CH - PW - 0) (DIA= 30 IN)
EA 1.000 $9,600.000 $6,300.000 $12,000.000 $12,000.000
HEADWALL (CH - PW - 0) (DIA= 42 IN)
EA 1.000 $12,300.000 $9,400.000 $13,000.000 $20,000.000
WINGWALL (PW - 1) (HW=6 FT)
EA 2.000 $28,000.000 $21,000.000 $16,000.000 $28,000.000
SET (TY II) (18 IN) (RCP) (6: 1) (P)
EA 86.000 $1,440.000 $1,060.000 $1,085.000 $1,475.000
SET (TY II) (24 IN) (RCP) (6: 1) (P)
EA 4.000 $1,775.000 $1,410.000 $2,700.000 $1,700.000
SET (TY II) (30 IN) (RCP) (4: 1) (C)
EA 6.000 $2,050.000 $2,500.000 $2,900.000 $2,300.000
SET (TY II) (30 IN) (RCP) (6: 1) (P)
EA 4.000 $2,800.000 $2,800.000 $3,800.000 $4,000.000
SET (TY II) (42 IN) (RCP) (4: 1) (C)
EA 1.000 $4,650.000 $4,100.000 $5,600.000 $7,500.000
CLEAN EXIST CULVERTS
EA 8.000 $3,000.000 $3,000.000 $1,270.000 $3,500.000
REMOV STR (SET)
EA 104.000 $645.000 $400.000 $875.000 $220.000
REMOV STR (WINGWALL)
EA 2.000 $2,640.000 $2,500.000 $1,700.000 $1,200.000
REMOV STR (PIPE)
LF 1,514.000 $25.000 $15.000 $50.000 $12.000
REMOV STR (BOX CULVERT)
LF 8.000 $250.000 $250.000 $250.000 $300.000
MOBILIZATION
LS 1.000 $1,361,945.210 $750,000.420 $1,075,000.000 $862,300.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 20.000 $5,000.000 $3,000.000 $12,500.000 $2,000.000
PORTABLE CHANGEABLE MESSAGE SIGN
DAY 15.000 $100.000 $150.000 $200.000 $100.000
PORTABLE CHANGEABLE MESSAGE SIGN
EA 2.000 $10,100.000 $8,500.000 $25,000.000 $4,200.000
TMA (STATIONARY)
DAY 90.000 $215.000 $400.000 $225.000 $250.000
TMA (MOBILE OPERATION)
HR 1,080.000 $55.000 $30.000 $5.000 $20.000
ROCK FILTER DAMS (INSTALL) (TY 2)
LF 800.000 $44.000 $40.000 $45.000 $65.000
ROCK FILTER DAMS (REMOVE)
LF 800.000 $8.840 $5.000 $13.500 $10.000
TEMP SEDMT CONT FENCE (INSTALL)
LF 1,500.000 $4.710 $4.600 $12.500 $4.000
TEMP SEDMT CONT FENCE (REMOVE)
LF 1,500.000 $1.000 $1.000 $3.250 $1.000
BIODEG EROSN CONT LOGS (INSTL) (8")
LF 275.000 $10.000 $6.000 $12.500 $5.000
BIODEG EROSN CONT LOGS (REMOVE)
LF 275.000 $1.000 $1.000 $3.250 $1.000
PORT CTB (DES SOURCE)(F-SHAPE)(TY 1)
LF 300.000 $30.000 $30.000 $32.000 $33.100
PORT CTB (MOVE)(F-SHAPE)(TY 1)
LF 1,000.000 $15.000 $20.000 $28.000 $38.500
PORT CTB (STKPL)(F-SHAPE)(TY 1)
LF 300.000 $20.000 $15.000 $31.000 $33.100
INTERSECTIONS (ACP)
SY 2,583.000 $42.000 $27.000 $53.000 $71.000
DRIVEWAYS (CONC) (HES)
SY 1,156.000 $130.000 $140.000 $155.000 $184.000
DRIVEWAYS (ACP)
SY 3,103.000 $50.000 $29.000 $72.000 $68.700
MILL RUMBLE STRIPS (ASPHALT) (SHLDR)
LF 36,000.000 $0.250 $0.220 $0.300 $0.270
MILL RUMBLE STRIPS (ASPH) (CENTERLINE)
LF 18,010.000 $0.200 $0.220 $0.500 $0.590
MTL W-BEAM GD FEN (STEEL POST)
LF 2,412.500 $34.000 $39.000 $31.000 $30.000
MTL BEAM GD FEN TRANS (THRIE-BEAM)
EA 6.000 $2,725.000 $2,900.000 $3,100.000 $3,000.000
SHORT RADIUS (28")
LF 125.000 $50.000 $60.000 $43.000 $30.000
REMOVE METAL BEAM GUARD FENCE
LF 1,737.500 $4.380 $5.000 $2.750 $3.000
RM MTL BM GD FENCE TRANS (THRIE-BEAM)
EA 6.000 $300.000 $300.000 $275.000 $250.000
GUARDRAIL END TREATMENT (INSTALL)
EA 26.000 $3,500.000 $3,500.000 $3,200.000 $2,877.500
GUARDRAIL END TREATMENT (REMOVE)
EA 18.000 $500.000 $360.000 $275.000 $250.000
CRASH CUSH ATTEN (MOVE & RESET)
EA 6.000 $2,800.000 $2,000.000 $2,100.000 $1,235.000
CRASH CUSH ATTEN (REMOVE)
EA 2.000 $1,500.000 $1,500.000 $950.000 $825.000
CRASH CUSH ATTEN (INSTL)(S)(N)(TL3)
EA 2.000 $8,000.000 $10,000.000 $9,000.000 $7,360.000
MAILBOX INSTALL-S (TWW-POST) TY 4
EA 34.000 $315.000 $430.000 $300.000 $389.000
MAILBOX INSTALL-D (TWW-POST) TY 4
EA 2.000 $340.000 $450.000 $345.000 $392.000
GROUND BOX TY A (122311)
EA 8.000 $485.000 $3,250.000 $2,700.000 $2,500.000
REMOVE GROUND BOX
EA 8.000 $1,060.000 $650.000 $540.000 $500.000
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
EA 61.000 $653.090 $680.000 $665.000 $616.000
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
EA 18.000 $826.180 $770.000 $780.000 $700.000
IN SM RD SN SUP&AM TY10BWG(1)SA(T-2EXT)
EA 4.000 $869.470 $830.000 $840.000 $753.000
IN SM RD SN SUP&AM TY10BWG(1)SA(U)
EA 2.000 $952.430 $870.000 $865.000 $791.000
IN SM RD SN SUP&AM TYS80(1)SA(P)
EA 1.000 $802.180 $740.000 $800.000 $670.000
IN SM RD SN SUP&AM TYS80(1)SA(U-BM)
EA 2.000 $1,210.280 $1,280.000 $1,000.000 $1,160.000
RELOCATE SM RD SN SUP & AM TY TEMP
EA 79.000 $246.190 $430.000 $300.000 $390.000
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI)
EA 53.000 $44.410 $50.000 $35.000 $45.000
INSTL OM ASSM (OM-2X)(WC)GND
EA 14.000 $62.500 $52.000 $65.000 $50.000
INSTL OM ASSM (OM-2Y)(WC)GND
EA 55.000 $97.560 $63.000 $65.000 $50.000
REMOVE DELIN & OBJECT MARKER ASSMS
EA 56.000 $35.000 $25.000 $54.000 $20.000
WK ZN PAV MRK NON-REMOV (W)6"(SLD)
LF 52,558.000 $0.500 $0.170 $0.330 $0.300
WK ZN PAV MRK NON-REMOV (W)12"(SLD)
LF 172.000 $4.000 $1.250 $4.350 $4.000
WK ZN PAV MRK NON-REMOV (Y)6"(SLD)
LF 116,028.000 $0.450 $0.150 $0.430 $0.400
WK ZN PAV MRK SHT TERM (TAB)TY W
EA 106.000 $1.500 $1.380 $1.600 $1.000
WK ZN PAV MRK SHT TERM (TAB)TY Y-2
EA 5,760.000 $1.500 $1.380 $1.600 $1.000
REFL PAV MRK TY I (W)8"(DOT)(100MIL)
LF 945.000 $1.670 $1.800 $1.360 $1.250
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
LF 4,200.000 $1.900 $1.200 $1.090 $1.000
REFL PAV MRK TY I (W)24"(SLD)(100MIL)
LF 455.000 $12.770 $9.000 $13.040 $12.000
TY I HIGH PERF PM (W)6"(BRK)(100MIL)
LF 80.000 $1.780 $3.000 $1.630 $1.500
TY I HIGH PERF PM (W)6"(SLD)(100MIL)
LF 57,545.000 $1.000 $0.850 $0.680 $0.630
TY I HIGH PERF PM (Y)6"(BRK)(100MIL)
LF 3,840.000 $0.800 $0.850 $0.700 $0.640
TY I HIGH PERF PM (Y)6"(SLD)(100MIL)
LF 46,950.000 $1.000 $0.850 $0.700 $0.640
PAVEMENT SLER 6"
LF 2,655.000 $1.780 $0.400 $0.710 $0.650
PAVEMENT SLER 8"
LF 480.000 $1.050 $0.500 $0.960 $0.880
PAVEMENT SLER 24"
LF 155.000 $3.230 $5.000 $3.260 $3.000
PAVEMENT SLER (ARROW)
EA 1.000 $45.000 $87.000 $108.000 $100.000
PAVEMENT SLER (WORD)
EA 1.000 $50.000 $87.000 $108.000 $100.000
PAVEMENT SLER (RR XING)
EA 3.000 $125.000 $170.000 $215.000 $200.000
PREFAB PM TY C (W)(ARROW)
EA 26.000 $247.320 $300.000 $260.000 $240.000
PREFAB PM TY C (W)(LN REDUCT ARROW)
EA 1.000 $503.000 $550.000 $760.000 $700.000
PREFAB PM TY C (W)(WORD)
EA 22.000 $328.380 $400.000 $415.000 $385.000
PREFAB PM TY C (W)(RR XING)
EA 3.000 $652.840 $1,100.000 $975.000 $900.000
REFL PAV MRKR TY I-C
EA 217.000 $6.910 $5.000 $5.000 $4.750
REFL PAV MRKR TY II-A-A
EA 2,161.000 $8.390 $5.000 $5.000 $4.750
ELIM EXT PM & MRKS (6")
LF 170,216.000 $3.000 $0.100 $0.340 $0.340
ELIM EXT PM & MRKS (8")
LF 480.000 $2.350 $0.100 $1.050 $1.000
ELIM EXT PM & MRKS (12")
LF 172.000 $2.530 $0.800 $2.400 $2.250
ELIM EXT PM & MRKS (24")
LF 155.000 $7.140 $0.800 $3.750 $3.500
ELIM EXT PM & MRKS (RR XING)
EA 3.000 $250.000 $125.000 $380.000 $350.000
PAV SURF PREP FOR MRK (6")
LF 2,655.000 $0.240 $0.300 $1.360 $1.250
PAV SURF PREP FOR MRK (8")
LF 480.000 $2.000 $0.600 $1.790 $1.650
PAV SURF PREP FOR MRK (24")
LF 90.000 $1.480 $5.000 $2.170 $2.000
PAV SURF PREP FOR MRK (ARROW)
EA 1.000 $27.800 $30.000 $48.000 $45.000
PAV SURF PREP FOR MRK (WORD)
EA 1.000 $25.000 $30.000 $54.000 $50.000
PAV SURF PREP FOR MRK (RR XING)
EA 3.000 $80.000 $80.000 $215.000 $200.000
UNDERSEAL COURSE
GAL 4,189.000 $5.250 $4.320 $4.000 $4.500
SOLAR POWERED LED ROADSIDE SIGN
EA 1.000 $2,550.000 $3,500.000 $3,800.000 $9,800.000
Totals: $15,103,012.160 $10,809,103.870 $12,466,444.565 $12,747,084.290
INCLUDES FORCE ACCOUNT WORK AMOUNTS AS FOLLOWS:
Description Amount
EROSION CONTROL MAINTENANCE: CONTRACTOR FORCE ACCOUNT WORK (PART) $50,000.00
LAW ENFORCEMENT: CONTRACTOR FORCE ACCOUNT WORK (PART) $10,000.00
CONTRACTOR FORCE ACCOUNT WORK (PART) $2,000.00
SAFETY CONTINGENCY: CONTRACTOR FORCE ACCOUNT WORK (PART) $15,000.00
Total: $77,000.00