MCLENNAN FM 939 (1192-01-024)

Items: 91

County: MCLENNAN
Length: N/A
Highway: FM 939
District: WACO
Control Number: 1192-01-024
DBE Goal: N/A
Project: STP 2017(936)
Guaranty: N/A
Time: 240 WORKING DAYS
Engineer's Estimate: $6,869,585.99
Date: 01/09/2019 (7 years ago)
Contract Number: N/A
Type: WDN, GR, BS, SURF, ADD SHLDRS
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice HCS Excel Tabs Print Print Notice
Pay Estimates:
Bidders (3)
E
Engineer's Estimate
$6,869,585.99
$6,431,694.20
Over/Under Est: -6.37% -$437,891.79
Over/Under Est: -4.73% -$324,705.95
Amt Left: 1.76% $113,185.84
Over/Under Est: 6.08% $417,635.19
Amt Left: 13.3% $855,526.98
Delta: -11.34% -$742,341.14

Bid Items & Bid Tabulations

91 Total 0 of 91
MCLENNAN  |  FM 939  |  WACO  |  1192-01-024  |  01/09/2019  |  $6,869,585.99  |  STP 2017(936)  |  WDN, GR, BS, SURF, ADD SHLDRS  |  240 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
KNIFE RIVER CORPORATION - SOUTH
TEXAS MATERIALS GROUP, INC.
BIG CREEK CONSTRUCTION, LTD.
SUBGRADE WIDENING (DENS CONT)
STA 492.000 $500.000 $400.000 $400.000 $755.000
EMBANKMENT (FINAL)(DENS CONT)(TY B)
CY 37,856.000 $10.000 $14.000 $10.000 $10.000
DRILL SEEDING (PERM) (RURAL) (CLAY)
SY 290,934.000 $0.110 $0.110 $0.110 $0.120
DRILL SEEDING (TEMP) (WARM)
SY 145,467.000 $0.090 $0.060 $0.090 $0.100
DRILL SEEDING (TEMP) (COOL)
SY 145,467.000 $0.100 $0.060 $0.090 $0.100
VEGETATIVE WATERING
MG 4,716.000 $9.910 $1.000 $19.000 $5.000
SOIL RETENTION BLANKETS (CL 1) (TY A)
SY 18,946.000 $1.250 $0.800 $0.930 $1.000
FL BS (CMP IN PLC)(TYD GR1-2)(FNAL POS)
CY 20,673.000 $37.000 $34.000 $40.000 $44.000
FL BS (RDWY DEL) (TY D GR 1-2) (IN VEH)
CY 10,336.000 $40.000 $23.250 $20.000 $25.000
REWORK BS MTL (TY C) (9") (DENS CONT)
SY 186,056.000 $2.300 $0.540 $1.000 $1.750
CEMENT
TON 1,968.000 $135.000 $136.000 $138.000 $150.000
CEMENT TREAT (EXIST MATL) (7")
SY 187,423.000 $2.200 $1.000 $1.700 $1.500
EMULS ASPH (BS OR SUBGR TRT)(MS-2)
GAL 42,410.000 $2.400 $2.360 $2.800 $1.500
ASPH (CRS-2)
GAL 99,224.000 $2.300 $2.350 $3.000 $2.600
ASPH (RC-250)
GAL 21,205.000 $3.750 $3.110 $3.000 $3.400
AGGR(TY-D GR-4 OR TY-L GR-4)
CY 1,357.000 $74.000 $95.000 $117.000 $65.000
AGGR (TY-D GR-5 OR TY-L GR-5)
CY 606.000 $65.000 $105.000 $106.000 $75.000
D-GR HMA TY-C SAC-B PG64-22
TON 17,728.000 $60.000 $70.000 $65.000 $65.000
PLANE ASPH CONC PAV(0" TO 6")
SY 131,333.000 $1.650 $0.460 $1.100 $1.500
RIPRAP (CONC)(4 IN)
CY 10.000 $300.000 $465.000 $450.000 $400.000
RIPRAP (STONE PROTECTION)(18 IN)
CY 158.000 $82.000 $149.000 $150.000 $185.000
RIPRAP (MOW STRIP)(4 IN)
CY 169.000 $392.000 $390.000 $471.000 $500.000
RETROFIT RAIL (TY T131RC)
LF 210.000 $156.000 $192.000 $146.000 $200.000
CONC BOX CULV (3 FT X 2 FT)(EXTEND)
LF 50.000 $320.140 $398.000 $382.000 $450.000
CONC BOX CULV (5 FT X 4 FT)(EXTEND)
LF 20.000 $653.200 $470.000 $452.000 $600.000
CONC BOX CULV (5 FT X 5 FT)(EXTEND)
LF 76.000 $632.990 $356.000 $342.000 $650.000
CONC BOX CULV (6 FT X 6 FT)(EXTEND)
LF 44.000 $521.760 $501.000 $481.000 $700.000
CONC BOX CULV (7 FT X 4 FT)(EXTEND)
LF 8.000 $564.000 $948.000 $910.000 $750.000
CONC BOX CULV (7 FT X 5 FT)(EXTEND)
LF 20.000 $589.790 $641.000 $616.000 $800.000
CONC BOX CULV (9 FT X 5 FT)(EXTEND)
LF 32.000 $504.000 $479.000 $460.000 $900.000
CONC BOX CULV (9 FT X 6 FT)(EXTEND)
LF 32.000 $520.000 $518.000 $498.000 $950.000
CONC BOX CULV (10 FT X 5 FT)(EXTEND)
LF 30.000 $600.230 $769.000 $738.000 $1,050.000
CONC BOX CULV (10 FT X 6 FT)(EXTEND)
LF 30.000 $3,200.000 $748.000 $718.000 $1,100.000
RC PIPE (CL III)(18 IN)
LF 774.000 $48.000 $49.000 $47.000 $65.000
RC PIPE (CL III)(24 IN)
LF 256.000 $52.730 $59.000 $57.000 $75.000
RC PIPE (CL III)(30 IN)
LF 8.000 $63.200 $142.000 $137.000 $100.000
RC PIPE (CL III)(36 IN)
LF 12.000 $80.150 $143.000 $138.000 $150.000
RC PIPE (CL III)(42 IN)
LF 18.000 $105.180 $186.000 $179.000 $200.000
HEADWALL (CH - PW - 0) (DIA= 36 IN)
EA 2.000 $6,364.950 $5,800.000 $5,598.000 $6,000.000
HEADWALL (CH - PW - 0) (DIA= 42 IN)
EA 2.000 $5,500.150 $6,000.000 $5,783.000 $7,500.000
WINGWALL (PW - 1) (HW=3 FT)
EA 2.000 $4,800.000 $5,700.000 $5,542.000 $6,700.000
WINGWALL (PW - 1) (HW=4 FT)
EA 2.000 $8,422.000 $6,100.000 $5,869.000 $7,000.000
WINGWALL (PW - 1) (HW=5 FT)
EA 2.000 $9,650.230 $6,800.000 $6,608.000 $13,500.000
WINGWALL (PW - 1) (HW=6 FT)
EA 8.000 $9,356.790 $8,900.000 $8,548.000 $18,000.000
WINGWALL (PW - 1) (HW=7 FT)
EA 4.000 $16,937.490 $10,000.000 $9,616.000 $19,000.000
WINGWALL (PW - 1) (HW=8 FT)
EA 4.000 $23,000.120 $11,100.000 $10,725.000 $21,000.000
WINGWALL (PW - 1) (HW=9 FT)
EA 2.000 $24,255.370 $20,300.000 $19,517.000 $32,000.000
SET (TY II) (18 IN) (CMP) (6: 1) (P)
EA 16.000 $803.950 $1,020.000 $983.000 $780.000
SET (TY II) (18 IN) (RCP) (6: 1) (P)
EA 68.000 $610.840 $955.000 $920.000 $730.000
SET (TY II) (24 IN) (CMP) (6: 1) (P)
EA 10.000 $1,077.000 $1,240.000 $1,197.000 $1,010.000
SET (TY II) (24 IN) (RCP) (4: 1) (C)
EA 2.000 $610.000 $940.000 $902.000 $780.000
SET (TY II) (24 IN) (RCP) (6: 1) (C)
EA 8.000 $1,051.760 $1,150.000 $1,105.000 $930.000
SET (TY II) (24 IN) (RCP) (6: 1) (P)
EA 44.000 $1,217.400 $1,150.000 $1,105.000 $930.000
SET (TY II) (30 IN) (CMP) (6: 1) (P)
EA 6.000 $1,677.600 $2,000.000 $1,922.000 $1,680.000
SET (TY II) (30 IN) (RCP) (4: 1) (C)
EA 2.000 $1,586.000 $1,350.000 $1,302.000 $1,200.000
SET (TY II) (36 IN) (RCP) (4: 1) (C)
EA 2.000 $2,800.840 $2,540.000 $2,440.000 $2,400.000
SET (TY II) (42 IN) (RCP) (4: 1) (C)
EA 2.000 $2,952.000 $4,490.000 $4,318.000 $3,400.000
CLEAN EXIST CULVERTS
EA 3.000 $1,284.820 $3,575.000 $3,445.000 $3,000.000
REMOV STR (PIPE)
LF 726.000 $11.820 $9.350 $9.000 $12.000
MOBILIZATION
LS 1.000 $400,000.000 $634,000.000 $428,765.000 $716,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 16.000 $3,000.000 $10,000.000 $12,000.000 $5,000.000
ROCK FILTER DAMS (INSTALL) (TY 2)
LF 1,010.000 $27.020 $28.500 $28.000 $28.000
ROCK FILTER DAMS (REMOVE)
LF 1,010.000 $7.700 $6.000 $6.000 $6.500
TEMP SEDMT CONT FENCE (INSTALL)
LF 31,510.000 $3.000 $3.000 $2.400 $2.500
TEMP SEDMT CONT FENCE (REMOVE)
LF 31,510.000 $0.610 $0.250 $0.250 $0.350
INTERSECTIONS (ACP)
SY 1,064.000 $26.000 $31.000 $27.000 $22.000
DRIVEWAYS (ACP)
SY 5,100.000 $28.400 $31.000 $24.000 $22.000
TURNOUTS (ACP)
SY 573.000 $36.000 $31.000 $12.000 $22.000
RUMBLE STRIPS (CENTERLINE)
LF 49,150.000 $0.170 $0.300 $0.300 $0.210
MTL W-BEAM GD FEN (STEEL POST)
LF 2,675.000 $30.000 $22.000 $23.300 $31.000
MTL BEAM GD FEN TRANS (THRIE-BEAM)
EA 12.000 $1,656.000 $2,125.000 $1,873.000 $2,300.000
REMOVE METAL BEAM GUARD FENCE
LF 1,550.000 $2.100 $2.050 $1.100 $1.200
GUARDRAIL END TREATMENT (INSTALL)
EA 16.000 $2,731.000 $2,600.000 $2,730.000 $2,600.000
GUARDRAIL END TREATMENT (REMOVE)
EA 12.000 $245.000 $235.000 $200.000 $210.000
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
EA 2.000 $484.000 $470.000 $533.220 $550.000
IN SM RD SN SUP&AM TY10BWG(1)SA(U)
EA 2.000 $560.000 $520.000 $613.290 $625.000
IN SM RD SN SUP&AM TYTWT(1)WS(P)
EA 47.000 $320.000 $315.000 $334.530 $350.000
REMOVE SM RD SN SUP&AM
EA 9.000 $86.000 $104.000 $100.000 $110.000
RELOCATE SM RD SN SUP & AM TY TEMP
EA 50.000 $196.000 $185.000 $206.000 $90.000
INSTL DEL ASSM (D-SW)SZ (BRF)GF1 (BI)
EA 16.000 $22.400 $22.000 $13.000 $15.000
INSTL DEL ASSM (D-DW)SZ 2(WC)GND
EA 4.000 $40.000 $78.000 $39.000 $42.000
INSTL OM ASSM (OM-2Y)(WC)GND
EA 44.000 $65.000 $78.000 $75.000 $80.000
WK ZN PAV MRK SHT TERM (TAB)TY Y-2
EA 8,936.000 $1.000 $1.350 $1.000 $1.000
REFL PAV MRK TY I (W)24"(SLD)(100MIL)
LF 242.000 $5.000 $5.210 $10.000 $11.000
RE PM W/RET REQ TY I (W)4"(SLD)(100MIL)
LF 98,945.000 $0.260 $0.350 $0.350 $0.400
RE PM W/RET REQ TY I (Y)4"(BRK)(100MIL)
LF 10,780.000 $0.270 $0.380 $0.390 $0.450
RE PM W/RET REQ TY I (Y)4"(SLD)(100MIL)
LF 27,848.000 $0.280 $0.350 $0.360 $0.400
REFL PAV MRKR TY II-A-A
EA 886.000 $4.000 $3.130 $3.650 $3.850
PORTABLE CHANGEABLE MESSAGE SIGN
EA 2.000 $3,122.300 $9,500.000 $18,945.000 $10,000.000
TMA (STATIONARY)
DAY 24.000 $165.000 $250.000 $350.000 $200.000
TMA (MOBILE OPERATION)
HR 312.000 $35.000 $25.000 $5.000 $50.000
Totals: $6,869,585.990 $6,431,694.200 $6,544,880.040 $7,287,221.180