Show Job Controls
Bid Cobra

MCLENNAN VARIOUS (0909-22-214)

Items: 69

County: MCLENNAN
Length: 0.0000 MILES
Highway: VARIOUS
District: WACO
Control Number: 0909-22-214
DBE Goal: 300.0%
Project: STP 2025(296)TAPS
Guaranty: $21,000.00
Time: 66 WORKING DAYS
Engineer's Estimate: $1,067,720.00
Date: 09/04/2025 (9 months ago)
Contract Number: 9253032
Type: CONSTRUCT PEDESTRIAN INFRASTRUCTURE
Project ID: A00206363
Contract Type: Federal
Project Description: WILL CONSTRUCT 6FT WIDE SIDEWALKS ON SOUTH SIDE OF S. CARPENTER ST FROM SH 164 TO E. BOWIE ST AND DOWN E. BOWIE ST TO S. LUMPKIN ST IN MART. PROJECT WILL INCLUDE THREE CROSSWALKS, ADA RAMPS AND NEW SIGNAGE.
Mail/Deliver Bids To:
TEXAS DEPARTMENT OF TRANSPORTATION
ATTN: CONSTRUCTION DIVISION - RM M1C3.02
6230 E STASSNEY LN, AUSTIN, TX 78744
CLAYTON ZACHA
Actions:
Notice Questions HCS Excel Tabs Print Print Notice
Bidders (6)
E
Engineer's Estimate
$1,067,720.00
$995,057.79
Over/Under Est: -6.81% -$72,662.21
Over/Under Est: 2.74% $29,237.02
Amt Left: 10.24% $101,899.23
$1,168,001.00
Over/Under Est: 9.39% $100,281.00
Amt Left: 17.38% $172,943.21
Delta: -6.48% -$71,043.98
Over/Under Est: 14.7% $156,964.00
Amt Left: 23.08% $229,626.21
Delta: -4.85% -$56,683.00
$1,275,505.70
Over/Under Est: 19.46% $207,785.70
Amt Left: 28.18% $280,447.91
Delta: -4.15% -$50,821.70
Over/Under Est: 38.46% $410,693.00
Amt Left: 48.58% $483,355.21
Delta: -15.91% -$202,907.30
Subcontractor Percentage Amount
4E TREE WORX LLC 2.44% $24,279.41
ROBIN STEEL LLC 2.32% $23,085.34
HIGHWAY TRAFFIC CONTROL & SERVICES, LLC 1.01% $10,050.08
D. I. J. CONSTRUCTION, INC. 0.80% $7,960.46
Total: 6.57% $65,375.29

Bid Items & Bid Tabulations

69 Total 0 of 69
MCLENNAN  |  VARIOUS  |  WACO  |  0909-22-214  |  09/04/2025  |  $1,067,720.00  |  STP 2025(296)TAPS  |  CONSTRUCT PEDESTRIAN INFRASTRUCT  |  66 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
TI-ZACK CONCRETE, LLC
CROSS PLUS CONSTRUCTION, LLC
STX CIVIL
HIGHWAY 19 CONSTRUCTION LLC
PMCO CONSTRUCTION LLC
GARRET SHIELDS INFRASTRUCTURE
PREPARING ROW
STA 26.920 $900.000 $1,100.000 $256.000 $1,500.000 $2,500.000 $3,000.000 $1,000.000
PREP ROW (TREE REMOVE) (12"-24" DIA)
EA 3.000 $2,000.000 $1,650.000 $1,000.000 $800.000 $1,000.000 $3,000.000 $1,000.000
REMOV CONC (RIPRAP)
SY 3.000 $35.000 $140.600 $1,200.000 $10.000 $25.000 $50.000 $50.000
REMOV CONC (SIDEWALK, RAMP OR SUP)
SY 27.000 $35.000 $31.240 $25.000 $10.000 $25.000 $25.000 $50.000
REMOV CONC (CURB OR CURB & GUTTER)
LF 79.000 $15.000 $32.040 $15.000 $10.000 $10.000 $25.000 $40.000
RMV (0"-12") TRT/UNTRT BASE & ASPH PAV
SY 106.000 $20.000 $31.830 $55.000 $20.000 $15.000 $50.000 $30.000
EXCAV (CHANNEL)
CY 715.000 $40.000 $70.790 $31.000 $25.000 $25.000 $30.000 $40.000
EMBANK (FNL)(OC)(TY B)
CY 194.000 $60.000 $86.970 $40.000 $45.000 $100.000 $40.000 $50.000
FURN & PLACE TOPSOIL (4")
SY 2,867.000 $5.000 $2.940 $12.000 $6.000 $5.000 $4.500 $5.000
BLOCK SODDING
SY 2,867.000 $8.000 $6.600 $8.500 $6.000 $7.000 $6.000 $12.000
VEGETATIVE WATERING
TGL 29.000 $50.000 $1.100 $111.000 $50.000 $100.000 $200.000 $100.000
FLEXIBLE PAVEMENT STRUCTURE REPAIR(8")
SY 540.000 $185.000 $80.170 $250.000 $125.000 $350.000 $185.000 $110.000
CL A CONC (COLLAR)
EA 4.000 $3,000.000 $1,870.000 $355.000 $1,200.000 $1,500.000 $1,000.000 $1,000.000
CL C CONC (MISC)
CY 14.000 $1,250.000 $803.920 $679.000 $1,200.000 $1,000.000 $555.000 $1,000.000
RIPRAP (CONC)(6 IN)
CY 36.000 $500.000 $803.920 $800.000 $800.000 $700.000 $800.000 $1,000.000
RAIL (HANDRAIL)(TY A)
LF 5.000 $200.000 $550.000 $2,000.000 $600.000 $180.000 $1,525.000 $300.000
RAIL (HANDRAIL)(TY B)
LF 31.000 $200.000 $275.000 $375.000 $250.000 $180.000 $605.000 $200.000
CMP (GAL STL 12 IN)
LF 178.000 $80.000 $165.000 $50.000 $100.000 $35.000 $185.000 $80.000
CMP (GAL STL 18 IN)
LF 96.000 $120.000 $220.000 $50.000 $110.000 $55.000 $200.000 $120.000
SET (TY II) (12 IN) (CMP) (6: 1) (P)
EA 14.000 $1,500.000 $2,200.000 $670.000 $800.000 $700.000 $2,000.000 $1,400.000
SET (TY II) (18 IN) (CMP) (6: 1) (C)
EA 6.000 $2,500.000 $2,200.000 $799.000 $1,500.000 $1,100.000 $2,200.000 $1,200.000
GRATE & FRAME
EA 52.000 $2,000.000 $1,391.310 $1,250.000 $2,900.000 $1,800.000 $2,000.000 $2,000.000
ADJUSTING MANHOLES (WATER VALVE BOX)
EA 5.000 $1,500.000 $1,687.200 $290.000 $800.000 $350.000 $650.000 $1,000.000
ADJUSTING MANHOLES (WATER METER)
EA 1.000 $1,000.000 $843.600 $200.000 $800.000 $300.000 $650.000 $1,000.000
CLEAN EXIST CULVERTS
EA 2.000 $1,000.000 $605.000 $1,000.000 $4,000.000 $5,000.000 $2,500.000 $5,000.000
REMOV STR (PIPE)
LF 205.000 $50.000 $16.500 $16.000 $20.000 $50.000 $25.000 $20.000
REMOVE STR (RAIL)
LF 5.000 $300.000 $38.500 $10.000 $25.000 $50.000 $500.000 $50.000
MOBILIZATION
LS 1.000 $93,705.000 $103,142.970 $80,000.000 $90,000.000 $167,000.000 $127,000.000 $100,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 5.000 $5,000.000 $1,650.000 $3,500.000 $2,800.000 $5,000.000 $4,000.000 $5,000.000
PORTABLE CHANGEABLE MESSAGE SIGN
DAY 112.000 $155.000 $0.110 $100.000 $75.000 $100.000 $100.000 $100.000
TMA (STATIONARY)
DAY 56.000 $200.000 $0.110 $1.000 $225.000 $500.000 $200.000 $400.000
TMA (MOBILE OPERATION)
HR 40.000 $100.000 $0.110 $1.000 $45.000 $100.000 $200.000 $400.000
ROCK FILTER DAMS (INSTALL) (TY 2)
LF 81.000 $40.000 $0.110 $1.000 $45.000 $35.000 $50.000 $30.000
ROCK FILTER DAMS (REMOVE)
LF 81.000 $15.000 $0.110 $1.000 $10.000 $10.000 $11.000 $5.000
SANDBAGS FOR EROSION CONTROL
EA 20.000 $15.000 $0.110 $1.000 $10.000 $5.000 $100.000 $5.000
TEMP SEDMT CONT FENCE (INSTALL)
LF 1,062.000 $6.000 $0.120 $6.000 $5.000 $4.000 $5.000 $6.000
TEMP SEDMT CONT FENCE (REMOVE)
LF 1,062.000 $2.000 $0.110 $1.000 $1.000 $1.000 $1.100 $1.000
BIODEG EROSN CONT LOGS (INSTL) (12")
LF 80.000 $9.000 $0.110 $1.000 $8.000 $5.000 $6.000 $6.000
BIODEG EROSN CONT LOGS (REMOVE)
LF 80.000 $3.000 $0.110 $1.000 $2.000 $1.000 $1.100 $1.000
CONC CURB (TY I)
LF 227.000 $30.000 $51.410 $75.000 $35.000 $35.000 $100.000 $20.000
CONC CURB (TY II)
LF 1,306.000 $40.000 $51.410 $75.000 $35.000 $35.000 $50.000 $25.000
CONC CURB & GUTTER (TY I)
LF 10.000 $40.000 $51.410 $75.000 $100.000 $30.000 $125.000 $40.000
CONC CURB & GUTTER (TY II)
LF 174.000 $50.000 $51.410 $75.000 $80.000 $45.000 $125.000 $40.000
CONC CURB & GUTTER (ARMOR CURB)
LF 56.000 $400.000 $343.120 $175.000 $450.000 $80.000 $300.000 $80.000
CONCRETE C&G (VALLEY GUTTER)
LF 205.000 $70.000 $77.110 $76.000 $50.000 $25.000 $85.000 $40.000
DRIVEWAYS (CONC) (HES)
SY 98.000 $150.000 $115.730 $120.000 $150.000 $110.000 $125.000 $120.000
DRIVEWAYS (ACP)
SY 332.000 $100.000 $76.890 $175.000 $120.000 $75.000 $105.000 $120.000
CONC SIDEWALKS (4")
SY 895.000 $100.000 $92.400 $85.000 $100.000 $75.000 $90.000 $100.000
CURB RAMPS (TY 1)
SY 20.000 $165.000 $139.090 $140.000 $280.000 $150.000 $150.000 $3,000.000
CURB RAMPS (TY 2)
SY 12.000 $165.000 $139.090 $140.000 $280.000 $180.000 $150.000 $3,000.000
CURB RAMPS (TY 3)
SY 56.000 $165.000 $139.090 $140.000 $280.000 $180.000 $150.000 $3,000.000
CURB RAMPS (TY 6)
SY 28.000 $165.000 $139.810 $138.000 $280.000 $180.000 $150.000 $3,000.000
CURB RAMPS (TY 7)
SY 62.000 $165.000 $139.090 $142.000 $280.000 $150.000 $150.000 $3,000.000
CONC SIDEWALKS (SPECIAL)
SY 582.000 $225.000 $267.970 $325.000 $350.000 $350.000 $300.000 $150.000
RELOCATE EXISTING MAILBOX
EA 3.000 $380.000 $0.110 $120.000 $450.000 $100.000 $825.000 $500.000
ALUMINUM SIGNS (TY A)
SF 24.000 $70.000 $44.000 $100.000 $200.000 $35.000 $335.000 $50.000
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
EA 14.000 $850.000 $495.000 $750.000 $900.000 $850.000 $1,250.000 $800.000
RELOCATE SM RD SN SUP&AM TY 10BWG
EA 3.000 $700.000 $385.000 $650.000 $150.000 $300.000 $650.000 $1,000.000
REMOVE SM RD SN SUP&AM
EA 3.000 $150.000 $27.500 $50.000 $250.000 $100.000 $125.000 $500.000
RE PM TY II (W) 4" (SLD)
LF 165.000 $1.000 $3.580 $4.000 $1.000 $25.000 $2.000 $3.000
PAVEMENT SLER 4"
LF 165.000 $1.000 $0.660 $4.000 $2.000 $10.000 $1.000 $2.000
PAVEMENT SLER 24"
LF 220.000 $5.000 $2.750 $40.000 $7.000 $10.000 $6.000 $2.500
PAVEMENT SLER (WORD)
EA 2.000 $50.000 $38.500 $400.000 $230.000 $20.000 $500.000 $110.000
PAVEMENT SLER (SYMBOL)
EA 1.000 $50.000 $44.000 $152.000 $200.000 $20.000 $500.000 $110.000
PREFAB PM TY C (W)(24")(SLD)
LF 220.000 $18.000 $28.600 $32.000 $20.000 $10.000 $25.000 $25.000
PREFAB PM TY C (W)(WORD)
EA 2.000 $300.000 $275.000 $423.000 $500.000 $250.000 $2,000.000 $500.000
PRE PM TY C (WHT)(ACC PRK)(SYMBL ONLY)
EA 1.000 $400.000 $220.000 $321.000 $700.000 $350.000 $2,000.000 $500.000
PAV SURF PREP FOR MRK (24")
LF 220.000 $3.000 $1.380 $15.000 $7.000 $20.000 $5.000 $2.000
REC RAPID FLASH BEACON (2-WAY SOLAR)
EA 2.000 $9,500.000 $11,000.000 $9,457.000 $22,000.000 $5,000.000 $10,000.000 $10,000.000
Totals: $1,067,720.000 $995,057.790 $1,096,957.020 $1,168,001.000 $1,224,684.000 $1,275,505.700 $1,478,413.000
INCLUDES FORCE ACCOUNT WORK AMOUNTS AS FOLLOWS:
Description Amount
SAFETY CONTINGENCY: CONTRACTOR FORCE ACCOUNT WORK (PART) $2,000.00
EROSION CONTROL MAINTENANCE: CONTRACTOR FORCE ACCOUNT WORK (PART) $2,000.00
Total: $4,000.00