Show Job Controls
Bid Cobra

MCLENNAN VA (0909-00-049)

Items: 85

County: MCLENNAN
Length: N/A
Highway: VA
District: WACO
Control Number: 0909-00-049
DBE Goal: N/A
Project: STP 2018(546)
Guaranty: N/A
Time: 198 WORKING DAYS
Engineer's Estimate: $2,089,093.76
Date: 02/02/2018 (8 years ago)
Contract Number: N/A
Type: CNSTR CURB RMPS
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice HCS Excel Tabs Print Print Notice
Pay Estimates:
Bidders (6)
E
Engineer's Estimate
$2,089,093.76
$1,647,633.40
Over/Under Est: -21.13% -$441,460.36
$1,753,395.00
Over/Under Est: -16.07% -$335,698.76
Amt Left: 6.42% $105,761.60
$1,886,746.98
Over/Under Est: -9.69% -$202,346.78
Amt Left: 14.51% $239,113.58
Delta: -7.61% -$133,351.98
Over/Under Est: -8.37% -$174,916.76
Amt Left: 16.18% $266,543.60
Delta: -1.45% -$27,430.02
Over/Under Est: -4.03% -$84,282.01
Amt Left: 21.68% $357,178.35
Delta: -4.73% -$90,634.75
Over/Under Est: -3.29% -$68,777.56
Amt Left: 22.62% $372,682.80
Delta: -0.77% -$15,504.45

Bid Items & Bid Tabulations

85 Total 0 of 85
MCLENNAN  |  VA  |  WACO  |  0909-00-049  |  02/02/2018  |  $2,089,093.76  |  STP 2018(546)  |  CNSTR CURB RMPS  |  198 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
TI-ZACK CONCRETE, INC.
ENCINO LANDSCAPE, INC.
TTG UTILITIES, LP
HIGHWAY 19 CONSTRUCTION LLC
SOUTH TEXAS ILLUMINATION, LLC
CROSS PLUS CONSTRUCTION, LLC
REMOVING CONC (RIPRAP)
SY 36.000 $15.000 $12.000 $10.000 $40.100 $25.000 $26.000 $40.000
REMOVING CONC (SIDEWALKS)
SY 169.000 $20.000 $12.000 $10.000 $21.350 $10.000 $26.000 $67.000
REMOVING CONC (DRIVEWAYS)
SY 70.000 $14.500 $20.000 $10.000 $30.950 $25.000 $26.000 $35.000
REMOVING CONC (CURB)
LF 1,146.000 $9.000 $10.000 $5.000 $9.400 $5.000 $16.500 $12.000
REMOVING CONC (MISC)
SY 39.000 $18.000 $25.000 $10.000 $37.000 $25.000 $18.500 $34.000
REMOVING CONC (CURB OR CURB & GUTTER)
LF 564.000 $7.000 $10.000 $5.000 $12.800 $10.000 $13.000 $8.000
REMOVING CONC (SIDEWALK OR RAMP)
SY 81.000 $9.000 $12.000 $10.000 $44.500 $10.000 $18.500 $56.000
REMOVING STAB BASE AND ASPH PAV(0"-16")
SY 264.000 $10.000 $12.000 $10.000 $75.700 $15.000 $13.000 $50.000
EXCAVATION (ROADWAY)
CY 552.000 $7.780 $1.000 $10.000 $79.800 $20.000 $13.000 $25.000
EXCAVATION (SPECIAL)
CY 300.000 $20.000 $1.000 $15.000 $88.100 $30.000 $16.500 $26.000
EMBANKMENT (FINAL)(ORD COMP)(TY B)
CY 651.000 $8.000 $1.000 $20.000 $95.750 $30.000 $18.500 $25.000
BLOCK SODDING
SY 842.000 $3.000 $4.000 $7.000 $4.550 $5.000 $5.000 $5.000
BROADCAST SEED (PERM) (RURAL) (CLAY)
SY 5,106.000 $0.250 $1.000 $1.000 $0.300 $1.000 $0.250 $0.500
BROADCAST SEED (TEMP) (WARM)
SY 2,553.000 $0.250 $1.000 $1.000 $0.250 $1.000 $0.250 $0.500
BROADCAST SEED (TEMP) (COOL)
SY 2,553.000 $0.250 $1.000 $1.000 $0.250 $1.000 $0.250 $0.500
VEGETATIVE WATERING
MG 222.000 $9.000 $1.000 $20.000 $36.450 $1.000 $5.000 $23.000
D-GR HMA(SQ) TY-C PG76-22
TON 490.200 $200.000 $150.000 $200.000 $364.550 $200.000 $199.000 $157.000
D-GR HMA (SQ) TYC PG76 - 22 (LEVEL UP)
TON 360.900 $250.000 $100.000 $200.000 $151.950 $200.000 $199.000 $157.000
FLEX PAVE STRUCTURE REPAIR (8"-10")
SY 64.000 $75.000 $105.000 $50.000 $364.600 $110.000 $68.000 $150.000
FLEX PAVEMENT STRUCTURE REPAIR (2-8")
SY 289.000 $39.000 $85.000 $30.000 $364.600 $75.000 $54.500 $150.000
PLANE ASPH CONC PAV(0" TO 2")
SY 250.000 $5.000 $12.000 $1.000 $30.400 $38.000 $45.000 $20.000
PLANE ASPH CONC PAV(0" TO 4")
SY 1,558.000 $8.000 $12.000 $2.000 $12.150 $12.000 $14.250 $20.000
FLOWABLE BACKFILL
CY 64.700 $140.000 $55.000 $400.000 $324.900 $180.000 $152.000 $200.000
CL A CONC (MISC)
CY 20.000 $500.000 $650.000 $1,000.000 $485.750 $1,000.000 $373.000 $500.000
CL C CONC (RETAINING WALL)
CY 23.000 $945.000 $650.000 $1,000.000 $697.000 $1,000.000 $49.000 $500.000
CL C CONC (MISC)
CY 30.700 $600.000 $650.000 $1,000.000 $486.100 $1,000.000 $713.000 $500.000
CL A CONC (STEPS)
CY 18.300 $220.000 $650.000 $1,000.000 $662.750 $1,000.000 $998.000 $900.000
RETAINING WALL (CONC BLOCK)
SF 879.000 $75.000 $25.000 $50.000 $25.900 $35.000 $43.000 $34.000
RETAINING WALL (CAST - IN - PLACE)
SF 2,839.000 $40.000 $40.000 $60.000 $40.500 $50.000 $56.000 $45.000
RIPRAP (CONC)(4 IN)
CY 14.800 $500.000 $650.000 $1,000.000 $396.000 $500.000 $365.000 $500.000
RAIL (HANDRAIL)(TY A)
LF 513.000 $337.000 $115.000 $80.000 $167.550 $150.000 $143.000 $120.000
RAIL (HANDRAIL)(TY B)
LF 829.000 $200.000 $85.000 $80.000 $115.300 $106.000 $102.000 $120.000
RC PIPE (CL IV)(18 IN)
LF 173.000 $125.000 $85.000 $60.000 $112.600 $70.000 $60.000 $67.000
JCTBOX(COMPL)(PJB)(3FTX3FT)
EA 7.000 $3,000.000 $3,500.000 $3,000.000 $3,378.000 $2,500.000 $3,656.000 $2,500.000
SET (PIPE RUNNER ASSEMBLY)
EA 2.000 $5,000.000 $5,000.000 $2,000.000 $674.600 $1,000.000 $780.000 $1,000.000
SET (TY II) (18 IN) (RCP) (6: 1) (P)
EA 2.000 $1,000.000 $1,200.000 $1,000.000 $765.800 $700.000 $880.000 $2,500.000
GRATE & FRAME
EA 25.000 $1,200.000 $1,000.000 $1,500.000 $1,100.500 $1,000.000 $942.000 $300.000
CAST-IN-PLACE TRENCH DRAIN
LF 93.000 $395.000 $300.000 $200.000 $107.850 $150.000 $405.000 $100.000
ADJUSTING MANHOLES
EA 1.000 $600.000 $500.000 $1,500.000 $807.000 $500.000 $1,703.000 $600.000
REMOV STR (BOX CULVERT)
EA 2.000 $7,000.000 $150.000 $1,000.000 $1,803.750 $5,000.000 $1,580.000 $1,900.000
REMOV STR (SET)
EA 1.000 $450.000 $150.000 $200.000 $360.750 $500.000 $264.000 $400.000
REMOVE STR (RAIL)
LF 38.000 $20.000 $15.000 $20.000 $28.600 $10.000 $40.000 $43.000
MOBILIZATION
LS 1.000 $256,700.000 $100,000.000 $230,000.000 $113,660.050 $250,000.000 $195,000.000 $200,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 10.000 $7,500.000 $1,000.000 $4,000.000 $4,453.450 $5,000.000 $4,900.000 $7,000.000
ROCK FILTER DAMS (INSTALL) (TY 1)
LF 110.000 $36.470 $0.100 $20.000 $38.900 $35.000 $34.000 $20.000
ROCK FILTER DAMS (INSTALL) (TY 2)
LF 80.000 $30.950 $0.100 $20.000 $42.500 $35.000 $37.000 $20.000
ROCK FILTER DAMS (REMOVE)
LF 190.000 $8.930 $0.100 $10.000 $12.150 $10.000 $13.000 $20.000
SANDBAGS FOR EROSION CONTROL
EA 1,000.000 $4.000 $0.100 $1.000 $7.300 $1.000 $5.000 $3.000
TEMP SEDMT CONT FENCE (INSTALL)
LF 1,250.000 $4.000 $0.100 $3.000 $1.800 $3.000 $1.750 $3.000
TEMP SEDMT CONT FENCE (REMOVE)
LF 1,250.000 $1.000 $0.100 $1.000 $0.500 $1.000 $0.550 $3.000
CONC CURB (TY II)
LF 1,626.000 $17.000 $25.000 $15.000 $20.200 $20.000 $21.000 $226.000
CONC CURB & GUTTER (TY II)
LF 132.000 $30.000 $35.000 $35.000 $49.100 $50.000 $45.000 $25.000
DRIVEWAYS (CONC)
SY 274.000 $69.000 $80.000 $70.000 $107.900 $100.000 $65.000 $45.000
CONC SIDEWALKS (4")
SY 5,114.000 $50.000 $95.000 $50.000 $42.700 $68.000 $62.000 $38.000
CURB RAMPS (TY 1)
EA 43.000 $1,700.000 $1,400.000 $1,500.000 $1,327.500 $1,200.000 $2,254.000 $1,200.000
CURB RAMPS (TY 2)
EA 5.000 $1,685.000 $1,400.000 $1,500.000 $1,340.400 $1,800.000 $2,275.000 $1,500.000
CURB RAMPS (TY 3)
EA 2.000 $1,400.000 $1,400.000 $1,500.000 $1,327.500 $1,200.000 $2,300.000 $1,600.000
CURB RAMPS (TY 5)
EA 7.000 $1,960.000 $1,400.000 $1,500.000 $1,371.300 $2,500.000 $2,050.000 $1,800.000
CURB RAMPS (TY 6)
EA 44.000 $2,400.000 $1,400.000 $1,500.000 $1,327.500 $1,200.000 $2,500.000 $2,000.000
CURB RAMPS (TY 7)
EA 99.000 $1,735.000 $1,400.000 $1,500.000 $1,327.500 $1,000.000 $2,500.000 $1,500.000
CURB RAMPS (TY 10)
EA 7.000 $2,290.000 $1,400.000 $1,500.000 $1,327.500 $1,000.000 $2,500.000 $1,800.000
CONC SIDEWALKS (SPECIAL) (TYPE B)
SY 131.000 $70.000 $150.000 $80.000 $43.000 $200.000 $100.000 $56.000
RELOCATE SM RD SN SUP&AM TY 10BWG
EA 26.000 $400.000 $150.000 $300.000 $289.600 $300.000 $325.000 $200.000
RELOCATE SM RD SN SUP&AM TY S80
EA 16.000 $200.000 $150.000 $300.000 $289.600 $300.000 $325.000 $400.000
REMOVE SM RD SN SUP&AM
EA 1.000 $100.000 $150.000 $100.000 $240.600 $100.000 $50.000 $56.000
REFL PAV MRK TY I (W)8"(DOT)(100MIL)
LF 15.000 $30.000 $3.600 $5.000 $9.700 $20.000 $3.400 $4.000
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
LF 463.000 $2.000 $3.200 $5.000 $6.900 $10.000 $1.200 $4.000
REFL PAV MRK TY I (W)24"(SLD)(100MIL)
LF 649.000 $7.000 $6.800 $15.000 $13.700 $10.000 $4.750 $4.000
PAVEMENT SEALER 4"
LF 1,731.000 $1.000 $0.400 $1.000 $0.850 $3.000 $0.700 $4.000
PAVEMENT SEALER 8"
LF 478.000 $1.250 $1.200 $1.000 $1.700 $3.000 $0.400 $4.000
PAVEMENT SEALER 24"
LF 649.000 $2.500 $2.400 $1.000 $5.100 $5.000 $0.750 $4.000
RE PM W/RET REQ TY I (W)4"(SLD)(100MIL)
LF 1,401.000 $3.000 $0.600 $3.000 $3.650 $10.000 $1.200 $1.500
RE PM W/RET REQ TY I (Y)4"(SLD)(100MIL)
LF 330.000 $3.000 $1.200 $3.000 $4.200 $10.000 $0.650 $3.000
PREFAB PAV MRK TY C (W) (ARROW)
EA 1.000 $15.000 $220.000 $300.000 $463.950 $100.000 $240.000 $156.000
ELIM EXT PAV MRK & MRKS (4")
LF 589.000 $1.250 $0.800 $1.000 $2.300 $2.000 $1.200 $1.000
ELIM EXT PAV MRK & MRKS (12")
LF 230.000 $3.500 $2.000 $2.000 $5.500 $2.000 $2.400 $1.000
ELIM EXT PAV MRK & MRKS (24")
LF 112.000 $3.000 $4.500 $3.000 $7.050 $4.000 $2.400 $1.000
PAV SURF PREP FOR MRK (4")
LF 1,731.000 $0.200 $0.100 $1.000 $0.300 $3.000 $1.550 $1.000
PAV SURF PREP FOR MRK (8")
LF 478.000 $0.300 $0.200 $1.000 $0.600 $3.000 $1.550 $1.000
PAV SURF PREP FOR MRK (24")
LF 603.000 $0.650 $1.000 $1.000 $2.950 $5.000 $2.400 $8.000
PED DETECT PUSH BUTTON (STANDARD)
EA 8.000 $400.000 $250.000 $500.000 $1,579.850 $1,000.000 $157.000 $200.000
REMOVAL OF PEDESTRIAN PUSH BUTTONS
EA 8.000 $100.000 $50.000 $100.000 $182.300 $350.000 $53.000 $100.000
RETROFIT DET WARN SURF(SURF APP OR CIP)
SF 76.000 $32.000 $35.000 $50.000 $41.300 $75.000 $21.000 $25.000
RETROFIT DET WARN SURF(SURF APPLIED)
EA 8.000 $350.000 $250.000 $400.000 $452.500 $500.000 $230.000 $100.000
RETROFIT DET WARN SURF(SURF APP OR CIP)
EA 3.000 $500.000 $250.000 $400.000 $452.500 $500.000 $230.000 $100.000
Totals: $2,089,093.760 $1,647,633.400 $1,753,395.000 $1,886,746.990 $1,914,177.000 $2,004,811.750 $2,020,316.200