Show Job Controls
Bid Cobra

MCLENNAN SL 396 (0258-10-050)

Items: 71

County: MCLENNAN
Length: 0.0000 MILES
Highway: SL 396
District: WACO
Control Number: 0258-10-050
DBE Goal: 6.0%
Project: F 2025(771)
Guaranty: $59,000.00
Time: 180 WORKING DAYS
Engineer's Estimate: $2,956,391.00
Date: 05/01/2025 (1 year ago)
Contract Number: 5253015
Type: CONSTRUCT SIDEWALKS & CURB RAMPS
Project ID: A00194279
Contract Type: Federal
Project Description: ADA REMEDIATION INCLUDING UPGRADING ADA CURB RAMPS, PED BUTTONS, AND INSTALLING SIDEWALK
Mail/Deliver Bids To:
TEXAS DEPARTMENT OF TRANSPORTATION
ATTN: CONSTRUCTION DIVISION - RM M1C3.02
6230 E STASSNEY LN, AUSTIN, TX 78744
CLAYTON ZACHA
Actions:
Notice Questions HCS Excel Tabs Print Print Notice
Bidders (6)
E
Engineer's Estimate
$2,956,391.00
$2,695,683.72
Over/Under Est: -8.82% -$260,707.28
$2,716,165.32
Over/Under Est: -8.13% -$240,225.68
Amt Left: 0.76% $20,481.60
$2,793,095.10
Over/Under Est: -5.52% -$163,295.90
Amt Left: 3.61% $97,411.38
Delta: -2.83% -$76,929.78
$2,837,523.86
Over/Under Est: -4.02% -$118,867.14
Amt Left: 5.26% $141,840.14
Delta: -1.59% -$44,428.76
Over/Under Est: -3.16% -$93,496.12
Amt Left: 6.2% $167,211.16
Delta: -0.89% -$25,371.02
Over/Under Est: 19.55% $578,081.00
Amt Left: 31.12% $838,788.28
Delta: -23.46% -$671,577.12
Subcontractor Percentage Amount
D&G ENERGY CORPORATION 3.49% $95,155.39
JR WEST TEXAS CONCRETE LLC 1.60% $43,624.25
LINEAR TRAFFIC MARKINGS LLC 0.91% $24,811.29
ROBIN STEEL LLC 0.55% $14,995.83
DIAMOND ELITE BARRICADES, LLC 0.53% $14,450.53
Total: 7.08% $193,037.29

Bid Items & Bid Tabulations

71 Total 0 of 71
MCLENNAN  |  SL 396  |  WACO  |  0258-10-050  |  05/01/2025  |  $2,956,391.00  |  F 2025(771)  |  CONSTRUCT SIDEWALKS & CURB RAMPS  |  180 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
TI-ZACK CONCRETE, LLC
3LW CIVIL LLC
STX CIVIL
TALBERT COMPANIES LLC
CROSS PLUS CONSTRUCTION, LLC
GREY SKY CONSTRUCTION LLC
PREP ROW (TREE PRUNE AND TRIM)
STA 5.000 $1,000.000 $137.500 $1,000.000 $2,200.000 $2,430.000 $2,500.000 $30,000.000
REMOV CONC (DRIVEWAYS)
SY 3,690.000 $20.000 $27.800 $30.000 $13.000 $19.733 $22.500 $20.000
REMOV CONC (SIDEWALK, RAMP OR SUP)
SY 521.000 $25.000 $30.630 $25.000 $30.000 $20.385 $45.000 $20.000
REMOV CONC (CURB OR CURB & GUTTER)
LF 2,093.000 $12.000 $11.440 $22.500 $16.000 $18.416 $10.000 $20.000
REMOV CONC (MISC)
SY 222.000 $41.000 $35.950 $25.000 $30.000 $25.301 $12.000 $50.000
RMV (4"-8") TRT/UNTRT BASE & ASPH PAV
SY 1,720.000 $10.000 $23.200 $25.000 $7.000 $6.638 $24.000 $20.000
EXCAV (SPECIAL)
CY 320.000 $30.000 $74.810 $65.000 $110.000 $27.900 $25.000 $50.000
EMBANK (FNL)(OC)(TY B)
CY 2,370.000 $45.000 $51.170 $55.000 $45.000 $39.218 $42.000 $40.000
BLOCK SODDING
SY 12,748.000 $6.500 $5.500 $8.500 $7.000 $6.469 $8.000 $8.000
VEGETATIVE WATERING
TGL 115.000 $200.000 $110.000 $87.390 $50.000 $168.750 $152.000 $50.000
RDSIDE AMENITY (WHEEL STOP)
EA 15.000 $300.000 $165.000 $150.000 $260.000 $393.750 $250.000 $500.000
RDSIDE AMENITY (WHEEL STOP REMOV&RESET)
EA 25.000 $250.000 $110.000 $125.000 $245.000 $393.750 $150.000 $500.000
D-GR HMA TY-D PG 76-22 (EXEMPT)
TON 50.000 $180.000 $330.000 $450.000 $400.000 $509.963 $250.000 $500.000
PLANE & TEXT ASPH CONC PAV(0" TO 2")
SY 100.000 $5.000 $22.000 $4.390 $5.000 $56.250 $25.000 $50.000
CUT & RESTORING PAV
SY 1,939.000 $165.000 $115.500 $148.500 $250.000 $39.375 $89.000 $150.000
RIPRAP (CONC)(4 IN)
CY 57.000 $500.000 $824.660 $660.250 $800.000 $602.010 $750.000 $550.000
RAIL (HANDRAIL)(TY E)
LF 251.000 $250.000 $187.000 $190.330 $130.000 $225.000 $256.000 $185.000
INLET (COMPL)(ARMOR CURB SLOT)
EA 2.000 $4,430.000 $5,500.000 $5,186.650 $9,500.000 $2,253.960 $4,212.000 $15,000.000
INLET (COMP)(TY SIDEWALK BRIDGE)
EA 4.000 $6,000.000 $13,750.000 $14,218.210 $15,000.000 $9,311.895 $9,124.000 $20,000.000
ADJUSTING MANHOLES
EA 10.000 $2,000.000 $798.000 $1,450.000 $1,500.000 $3,937.500 $529.000 $2,000.000
ADJUSTING INLETS
EA 1.000 $1,300.000 $798.000 $3,030.000 $2,000.000 $3,943.125 $1,250.000 $5,000.000
ADJUSTING MANHOLES (UTILITY BOX)
EA 16.000 $400.000 $498.750 $750.000 $900.000 $1,687.500 $612.000 $2,500.000
ADJUSTING MANHOLES (WATER VALVE BOX)
EA 18.000 $2,000.000 $443.330 $528.970 $800.000 $1,912.500 $981.000 $2,500.000
MOBILIZATION
LS 1.000 $288,000.000 $219,982.280 $176,000.000 $225,000.000 $374,062.500 $210,000.000 $340,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 12.000 $8,500.000 $2,750.000 $8,568.600 $2,170.000 $9,562.500 $8,000.000 $8,500.000
PORTABLE CHANGEABLE MESSAGE SIGN
EA 2.000 $12,000.000 $1.100 $8,500.000 $8,000.000 $18,000.000 $1,200.000 $16,500.000
TMA (STATIONARY)
DAY 176.000 $500.000 $1.100 $165.000 $65.000 $393.750 $350.000 $250.000
TMA (MOBILE OPERATION)
HR 16.000 $500.000 $1.100 $0.010 $80.000 $281.250 $500.000 $55.000
CONSTRUCTION PERIMETER FENCE
LF 4,000.000 $4.000 $0.110 $0.010 $2.000 $5.344 $19.000 $30.000
TEMP SEDMT CONT FENCE (INSTALL)
LF 4,454.000 $5.000 $0.110 $0.010 $5.000 $4.388 $5.000 $4.000
TEMP SEDMT CONT FENCE (REMOVE)
LF 4,454.000 $2.500 $0.110 $0.010 $2.000 $1.013 $1.000 $2.000
BIODEG EROSN CONT LOGS (INSTL) (8")
LF 757.000 $8.000 $0.110 $0.010 $8.000 $5.625 $12.000 $18.000
BIODEG EROSN CONT LOGS (REMOVE)
LF 757.000 $2.500 $0.110 $0.010 $2.000 $2.250 $1.000 $9.000
PERM CTB (F-SHAPE) (TY 1)
LF 280.000 $85.000 $220.000 $151.600 $140.000 $253.125 $152.000 $300.000
CONC CURB (TY II)
LF 1,010.000 $25.000 $54.660 $45.000 $30.000 $14.996 $45.000 $65.000
CONC CURB & GUTTER (TY II)
LF 2,786.000 $50.000 $54.660 $62.520 $45.000 $39.060 $41.000 $65.000
DRIVEWAYS (CONC) (HES)
SY 3,448.000 $125.000 $110.770 $107.080 $110.000 $100.811 $121.000 $125.000
CONC SIDEWALKS (4")
SY 7,058.000 $80.000 $98.350 $72.000 $75.000 $89.460 $99.000 $60.000
CURB RAMPS (TY 1)
EA 23.000 $2,750.000 $2,143.770 $1,783.000 $2,500.000 $2,368.159 $1,500.000 $3,850.000
CURB RAMPS (TY 2)
EA 3.000 $2,750.000 $2,143.770 $1,783.000 $2,500.000 $2,889.236 $1,500.000 $3,850.000
CURB RAMPS (TY 3)
EA 6.000 $2,800.000 $2,143.770 $1,783.000 $2,200.000 $2,965.028 $1,500.000 $3,850.000
CURB RAMPS (TY 7)
EA 4.000 $2,800.000 $2,143.770 $1,607.830 $2,000.000 $2,585.081 $1,500.000 $3,850.000
CURB RAMPS (TY 10)
EA 3.000 $2,800.000 $2,143.770 $1,885.000 $2,600.000 $3,049.110 $1,500.000 $3,850.000
CURB RAMPS (TY 21)
EA 9.000 $2,750.000 $2,143.770 $1,983.140 $3,600.000 $3,003.199 $1,500.000 $3,850.000
CURB RAMPS (TY 22)
EA 1.000 $4,000.000 $1,999.190 $2,183.140 $3,100.000 $3,547.283 $1,500.000 $3,850.000
REMOVE METAL BEAM GUARD FENCE
LF 350.000 $2.000 $16.500 $2.500 $3.250 $8.156 $7.000 $3.000
GUARDRAIL END TREATMENT (REMOVE)
EA 2.000 $300.000 $165.000 $750.000 $450.000 $337.500 $400.000 $500.000
CHAIN LINK FENCE (REMOVE)
LF 28.000 $24.000 $16.500 $20.000 $15.000 $39.375 $25.000 $20.000
GATE (REMOVE)
EA 1.000 $788.000 $165.000 $250.000 $500.000 $337.500 $522.000 $1,500.000
CONDT (PVC) (SCH 40) (3")
LF 135.000 $15.000 $27.500 $24.000 $30.150 $33.750 $35.000 $50.000
CONDT (PVC) (SCH 40) (3") (BORE)
LF 494.000 $50.000 $60.500 $60.000 $67.000 $41.963 $42.000 $100.000
ELEC CONDR (NO.8) BARE
LF 622.000 $2.500 $1.760 $2.400 $2.000 $3.713 $4.300 $3.000
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
EA 19.000 $900.000 $495.000 $792.000 $700.000 $810.000 $1,200.000 $1,500.000
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
EA 2.000 $900.000 $605.000 $907.500 $700.000 $928.125 $1,400.000 $1,500.000
IN SM RD SN SUP&AM TY10BWG(1)SA(U)
EA 1.000 $900.000 $825.000 $1,182.500 $700.000 $1,209.375 $1,428.000 $1,500.000
REFL PAV MRK TY I (W)24"(SLD)(100MIL)
LF 1,936.000 $15.000 $9.080 $9.900 $9.950 $9.281 $9.230 $20.000
PAVEMENT SLER 24"
LF 1,936.000 $3.500 $1.100 $1.200 $1.210 $1.125 $2.000 $5.000
ELIM EXT PM & MRKS (24")
LF 1,689.000 $5.500 $3.290 $3.590 $3.620 $3.364 $5.000 $5.000
PAV SURF PREP FOR MRK (24")
LF 1,936.000 $2.500 $1.020 $1.120 $1.210 $1.046 $2.000 $5.000
PED SIG SEC (LED)(COUNTDOWN)
EA 9.000 $1,250.000 $880.000 $1,200.000 $964.880 $963.788 $1,000.000 $6,500.000
TRF SIG CBL (TY A)(12 AWG)(2 CONDR)
LF 211.000 $4.000 $1.930 $2.400 $2.110 $3.938 $4.000 $3.000
TRF SIG CBL (TY A)(16 AWG)(3 CONDR)
LF 192.000 $4.000 $1.540 $2.400 $1.690 $4.050 $5.000 $3.000
PED POLE ASSEMBLY
EA 5.000 $3,500.000 $3,960.000 $4,560.000 $4,341.980 $4,755.038 $5,000.000 $5,000.000
RELOCATE PED POLE ASSEMBLY
EA 1.000 $3,000.000 $5,720.000 $3,000.000 $6,271.750 $3,948.750 $4,000.000 $5,000.000
REMOVE PED POLE ASSEMBLY
EA 1.000 $3,000.000 $368.500 $1,200.000 $404.040 $1,957.500 $1,800.000 $2,500.000
PED DETECT PUSH BUTTON (APS)
EA 12.000 $1,000.000 $990.000 $1,440.000 $1,085.490 $1,882.575 $1,900.000 $1,850.000
PED DETECTOR CONTROLLER UNIT
EA 1.000 $4,000.000 $7,639.500 $5,400.000 $8,376.400 $6,499.575 $7,825.000 $6,500.000
REMOVAL OF SIGNAL HEAD ASSM
EA 3.000 $100.000 $77.000 $480.000 $84.430 $326.250 $399.000 $500.000
INSTALL OF SIGNAL HEAD ASSM
EA 7.000 $200.000 $368.500 $1,200.000 $404.050 $1,935.000 $1,900.000 $500.000
REMOVAL OF PEDESTRIAN PUSH BUTTONS
EA 11.000 $200.000 $27.500 $120.000 $30.150 $108.788 $125.000 $250.000
GROUND BOX (PREPARE)
EA 9.000 $2,000.000 $220.000 $300.000 $241.220 $401.288 $778.000 $500.000
Totals: $2,956,391.000 $2,695,683.720 $2,716,165.320 $2,793,095.100 $2,837,523.821 $2,862,894.880 $3,534,472.000
INCLUDES FORCE ACCOUNT WORK AMOUNTS AS FOLLOWS:
Description Amount
SAFETY CONTINGENCY: CONTRACTOR FORCE ACCOUNT WORK (NON-PART) $261,404.00
EROSION CONTROL MAINTENANCE: CONTRACTOR FORCE ACCOUNT WORK (NON-PART) $25,000.00
LAW ENFORCEMENT: CONTRACTOR FORCE ACCOUNT WORK (NON-PART) $25,000.00
Total: $311,404.00