MCLENNAN SH 6 (0258-09-147)

Items: 131

County: MCLENNAN
Length: 0.0000 MILES
Highway: SH 6
District: WACO
Control Number: 0258-09-147
DBE Goal: 8.0%
Project: BR 2025(387)
Guaranty: $100,000.00
Time: WORKING DAYS
Engineer's Estimate: $102,301,057.16
Date: 01/08/2025 (1 year ago)
Contract Number: 1253203
Type: BRIDGE REPLACEMENT
Project ID: A00004860
Contract Type: Federal
Project Description: RECONSTRUCT AND WIDEN BRIDGES AND APPROACHES TO ACCOMMODATE 4 LANES WITH SHOULDERS.
Mail/Deliver Bids To: N/A
CLAYTON ZACHA
Actions:
Notice Questions HCS Excel Tabs Print Print Notice
Bidders (3)
E
Engineer's Estimate
$102,301,057.16
$113,740,588.46
Over/Under Est: 11.18% $11,439,531.30
$116,377,794.14
Over/Under Est: 13.76% $14,076,736.98
Amt Left: 2.32% $2,637,205.68
$184,386,826.22
Over/Under Est: 80.24% $82,085,769.06
Amt Left: 62.11% $70,646,237.76
Delta: -58.44% -$68,009,032.08
Subcontractor Percentage Amount
A. H. BECK FOUNDATION CO., INC. 18.20% $20,454,989.06
LONE STAR PAVING COMPANY 1.34% $1,506,026.67
JB PINNACLE GROUP, LLC 1.02% $1,146,378.51
ENVIRONMENTAL SAFETY SERVICES, INC. 0.77% $865,403.38
COWBOY TRUCKING 0.48% $539,472.24
TERRACON CONSULTANTS, INC. 0.44% $494,516.22
TEXAS CLEAR CUT LLC 0.41% $460,799.20
TEXAS STEEL INDUSTRIAL PLACING, LLC 0.34% $382,126.17
TRP CONSTRUCTION GROUP, LLC 0.30% $337,170.15
F & W ELECTRICAL CONTRACTORS, INC. 0.23% $258,497.11
PRIMATE CONSTRUCTION, LP 0.11% $123,629.05
A BROTHERS MILLING, LLC 0.03% $33,717.01
B.E.S.T. 0.02% $22,478.01
AWP SAFETY 0.01% $11,239.00
TEXAS STEEL INDUSTRIAL PLACING, CONCRETE DIVISION LLC 0.00% $0.00
TEXAS STEEL INDUSTRIAL PLACING, LLC 0.00% $0.00
APPLE PERSONNEL SERVICE, INC. 0.00% $0.00
Total: 23.70% $26,636,441.78

Bid Items & Bid Tabulations

131 Total 0 of 131
MCLENNAN  |  SH 6  |  WACO  |  0258-09-147  |  01/08/2025  |  $102,301,057.16  |  BR 2025(387)  |  BRIDGE REPL  |  WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
ORION CONSTRUCTION, LLC
A. L. HELMCAMP, INC.
WEBBER, LLC
PREPARING ROW
STA 25.000 $1,500.000 $440,000.000 $25,000.000 $720,000.000
REMOV CONC (MOWSTRIP)
LF 827.000 $11.500 $7.000 $25.000 $11.640
RMV (10"-12") TRT/UNTRT BASE & ASPH PAV
SY 9,514.000 $12.000 $17.000 $16.000 $15.530
EXCAV (ROADWAY)
CY 4,663.000 $32.000 $25.000 $35.000 $11.330
EMBANK (FNL)(DC)(TY C1)
CY 2,551.000 $55.000 $48.000 $65.000 $11.480
FURN & PLACE TOPSOIL (4")
SY 1,336.000 $10.000 $30.000 $11.000 $23.280
BROADCAST SEED (PERM_URBAN_CLAY)
SY 1,336.000 $1.000 $1.250 $3.000 $0.760
BROADCAST SEED (TEMP_WARM_COOL)
SY 1,336.000 $1.000 $0.300 $3.000 $0.760
VEGETATIVE WATERING
TGL 22.000 $100.000 $200.000 $65.000 $71.430
FL BS (CMP IN PLC)(TYD GR1-2)(FNAL POS)
CY 3,322.000 $80.000 $125.000 $110.000 $118.450
LIME (COM OR QK)(SLURRY)
TON 372.000 $250.000 $425.000 $350.000 $434.510
LIME TRT (SUBGRADE)(12")
SY 13,774.000 $10.000 $10.000 $12.000 $13.610
EMULS ASPH (BS OR SUBGR TRT)(CSS-1H)
GAL 10,464.000 $5.750 $7.000 $4.000 $8.140
FOG SEAL (CSS-1H)
GAL 5,232.000 $4.500 $6.000 $4.000 $7.980
ASPH (CRS-2P)
GAL 5,232.000 $5.000 $7.000 $4.500 $8.740
AGGR (TY-D OR L, GR-4)
CY 97.000 $170.000 $270.000 $550.000 $467.330
D-GR HMA TY-B PG64-22 (EXEMPT)
TON 4,328.000 $165.000 $185.000 $125.000 $193.770
D-GR HMA TY-B PG64-22 (LEVEL-UP)
TON 288.000 $165.000 $255.000 $460.000 $338.150
TACK COAT
GAL 7,136.000 $6.000 $6.250 $4.500 $7.980
STONE-MTRX-ASPH SMA-D SAC-A PG76-22
TON 2,688.000 $165.000 $250.000 $170.000 $269.760
PLANE ASPH CONC PAV (2" TO 4 1/2")
SY 11,336.000 $6.000 $7.000 $7.000 $7.520
CEM STABIL BKFL
CY 51.000 $225.000 $450.000 $400.000 $265.960
TEMPORARY SPL SHORING
SF 1,000.000 $50.000 $200.000 $73.000 $75.990
DRILL SHAFT (18 IN)
LF 158.000 $200.000 $1,000.000 $340.000 $475.000
DRILL SHAFT (24 IN)
LF 27.000 $300.000 $135.000 $450.000 $475.000
DRILL SHAFT (30 IN)
LF 38.000 $350.000 $600.000 $510.000 $475.000
DRILL SHAFT (36 IN)
LF 1,452.000 $375.000 $1,200.000 $400.000 $475.000
DRILL SHAFT (66 IN)
LF 8,885.000 $900.000 $1,630.000 $1,600.000 $475.000
DRILL SHAFT (72 IN)
LF 3,002.000 $1,200.000 $1,890.000 $1,700.000 $555.000
DRILL SHAFT (RDWY ILL POLE) (30 IN)
LF 16.000 $350.000 $615.000 $540.000 $635.260
CL C CONC (ABUT)(HPC)
CY 143.600 $1,490.000 $2,250.000 $3,600.000 $5,130.000
CL C CONC (CAP)(HPC)(MASS)
CY 4,900.600 $1,500.000 $2,475.000 $2,300.000 $7,025.000
CL C CONC (COLUMN)(HPC)
CY 1,951.000 $1,500.000 $2,390.000 $1,900.000 $3,450.000
REINF CONC SLAB
SF 460,391.000 $36.000 $30.000 $41.000 $59.750
APPROACH SLAB
CY 183.000 $900.000 $900.000 $1,000.000 $1,000.000
PRESTR CONC GIRDER (TX54)
LF 5,805.060 $220.000 $280.000 $320.000 $420.000
PRESTR CONC GIRDER (TX70)
LF 56,640.000 $260.000 $285.000 $330.000 $563.000
RIPRAP (MOW STRIP)(4 IN)
CY 527.000 $690.000 $1,000.000 $660.000 $1,158.760
RIPRAP (STONE PROTECTION)(24 IN)
CY 2,094.000 $265.000 $185.000 $200.000 $352.250
RAIL (TY SSTR)
LF 8,020.000 $145.000 $105.000 $85.000 $129.750
SEALED EXPANSION JOINT (4 IN) (SEJ - M)
LF 1,720.100 $230.000 $330.000 $270.000 $444.400
RC PIPE (CL III)(24 IN)
LF 98.000 $120.000 $210.000 $160.000 $303.950
JCTBOX(COMPL)(PJB)(3FTX3FT)
EA 1.000 $7,000.000 $6,250.000 $8,000.000 $9,118.610
INLET (COMPL)(PSL)(SL)(3FTX3FT)
EA 1.000 $7,500.000 $2,000.000 $8,000.000 $22,796.520
SET (TY II) (24 IN) (RCP) (6: 1) (P)
EA 1.000 $3,000.000 $4,250.000 $1,300.000 $4,559.310
REMOV STR (INLET)
EA 2.000 $2,000.000 $1,250.000 $3,000.000 $2,279.660
REMOV STR (PIPE)
LF 87.000 $22.000 $25.000 $110.000 $75.990
REMOV STR (BRIDGE 1000 FT OR GREATER)
EA 2.000 $750,000.000 $3,500,000.000 $6,500,000.000 $11,123,745.000
MOBILIZATION
LS 1.000 $3,750,000.000 $11,000,000.000 $15,000,000.000 $18,000,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 52.000 $8,000.000 $35,000.000 $40,000.000 $26,770.000
PORTABLE CHANGEABLE MESSAGE SIGN
DAY 1,400.000 $200.000 $125.000 $100.000 $60.790
PORTABLE CHANGEABLE MESSAGE SIGN
EA 2.000 $10,000.000 $50,000.000 $15,000.000 $37,994.190
TMA (STATIONARY)
DAY 700.000 $300.000 $1.000 $240.000 $361.860
TMA (MOBILE OPERATION)
HR 7,000.000 $40.000 $1.000 $50.000 $113.980
TEMP SEDMT CONT FENCE (INSTALL)
LF 285.000 $5.000 $12.000 $9.000 $16.350
TEMP SEDMT CONT FENCE (REMOVE)
LF 285.000 $2.000 $2.000 $3.000 $6.930
BIODEG EROSN CONT LOGS (INSTL) (12")
LF 504.000 $12.000 $18.000 $6.000 $19.040
BIODEG EROSN CONT LOGS (REMOVE)
LF 504.000 $3.000 $2.000 $1.000 $9.060
CONSTRUCTING DETOURS
SY 2,564.000 $150.000 $180.000 $120.000 $121.580
PORT CTB (FUR & INST)(F-SHAPE)(TY 1)
LF 16,470.000 $50.000 $20.000 $85.000 $95.250
PORT CTB (MOVE)(F-SHAPE)(TY 1)
LF 750.000 $7.500 $10.000 $50.000 $22.250
PORT CTB (REMOVE)(F-SHAPE)(TY 1)
LF 16,470.000 $18.000 $5.000 $40.000 $30.650
PERM CTB (SGL SLOPE) (TY 1) (42 )
LF 5,244.000 $180.000 $90.000 $75.000 $109.550
PERM CTB (SGL SLOPE) (TY 3) (42 )
LF 110.000 $400.000 $500.000 $700.000 $434.440
MILL RUMBLE STRIPS (ASPHALT) (SHLDR)
LF 4,446.000 $1.000 $1.900 $1.500 $0.380
MTL W-BEAM GD FEN (STEEL POST)
LF 11,563.000 $35.000 $36.000 $28.000 $40.270
MTL BEAM GD FEN TRANS (THRIE-BEAM)
EA 4.000 $3,000.000 $3,300.000 $2,500.000 $3,723.430
DOWNSTREAM ANCHOR TERMINAL SECTION
EA 4.000 $1,500.000 $1,850.000 $1,600.000 $2,051.690
REMOVE METAL BEAM GUARD FENCE
LF 12,175.000 $4.000 $3.500 $2.500 $3.800
REMOVE DOWNSTREAM ANCHOR TERMINAL
EA 4.000 $225.000 $200.000 $230.000 $227.970
RM MTL BM GD FENCE TRANS (THRIE-BEAM)
EA 5.000 $500.000 $275.000 $230.000 $303.950
CABLE BARRIER SYSTEM (INSTALL)(TL-3)
LF 1,555.000 $40.000 $33.000 $33.000 $37.230
CABLE BARRIER TERM SEC (INSTL)(TL-3)
EA 2.000 $3,000.000 $6,500.000 $5,000.000 $7,142.910
CABLE BARRIER (REMOVE)
LF 2,997.000 $6.000 $2.750 $8.000 $3.040
CABLE BARRIER TERMINAL SECTION (REMOVE)
EA 2.000 $2,000.000 $1,025.000 $1,700.000 $1,139.830
GUARDRAIL END TREATMENT (INSTALL)
EA 4.000 $3,000.000 $4,500.000 $3,300.000 $4,977.240
GUARDRAIL END TREATMENT (REMOVE)
EA 4.000 $300.000 $275.000 $230.000 $303.950
CRASH CUSH ATTEN (MOVE & RESET)
EA 1.000 $2,000.000 $3,000.000 $3,000.000 $3,039.540
CRASH CUSH ATTEN (REMOVE)
EA 1.000 $1,500.000 $2,000.000 $2,500.000 $1,823.730
CRASH CUSH ATTEN (INSTL)(R)(N)(TL3)
EA 2.000 $20,000.000 $40,000.000 $32,000.000 $42,933.440
CRASH CUSH ATTEN (INSTL)(S)(N)(TL3)
EA 1.000 $10,000.000 $15,000.000 $11,000.000 $14,437.780
RELOCATE RD IL ASM (TRANS-BASE)
EA 2.000 $3,300.000 $4,000.000 $3,500.000 $3,875.410
REPLACE LUMINAIRE W/(250W EQ) LED
EA 2.000 $1,000.000 $650.000 $580.000 $1,363.240
CONDT (PVC) (SCH 40) (2")
LF 320.000 $18.000 $38.000 $33.000 $17.600
CONDT (PVC) (SCH 40) (2") (BORE)
LF 320.000 $35.000 $70.000 $60.000 $44.010
ELEC CONDR (NO.8) BARE
LF 640.000 $2.500 $5.250 $5.000 $3.510
ELEC CONDR (NO.8) INSULATED
LF 1,280.000 $2.500 $10.000 $9.000 $3.430
GROUND BOX TY A (122311)W/APRON
EA 2.000 $1,500.000 $2,500.000 $2,300.000 $1,633.750
ALUMINUM SIGNS (TY O)
SF 317.000 $50.000 $135.000 $118.000 $63.300
REPLACE EXISTING ALUMINUM SIGNS(TY A)
SF 30.000 $55.000 $60.000 $50.000 $53.190
REPLACE EXISTING ALUMINUM SIGNS(TY G)
SF 251.000 $40.000 $142.000 $125.000 $68.390
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
EA 5.000 $700.000 $940.000 $1,300.000 $1,047.120
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
EA 2.000 $850.000 $1,130.000 $1,700.000 $1,089.670
REMOVE SM RD SN SUP&AM
EA 4.000 $150.000 $158.000 $200.000 $303.950
REPLACE LRSA
EA 1.000 $6,000.000 $2,540.000 $2,500.000 $4,331.340
INS OH SN SUP(85 FT BRDG)
EA 1.000 $50,000.000 $120,000.000 $105,000.000 $126,520.670
REMOVE OVERHD SIGN SUP
EA 1.000 $20,000.000 $15,750.000 $14,000.000 $19,042.690
INSTL DEL ASSM (D-SW)SZ 1(BRF)CTB
EA 80.000 $20.000 $32.000 $50.000 $63.830
INSTL DEL ASSM (D-SW)SZ 1(BRF)CTB (BI)
EA 54.000 $42.000 $32.000 $50.000 $63.830
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2
EA 118.000 $45.000 $32.000 $50.000 $37.990
WK ZN PAV MRK REMOV (W)6"(BRK)
LF 6,045.000 $3.500 $2.030 $1.800 $1.610
WK ZN PAV MRK REMOV (W)6"(SLD)
LF 37,531.000 $1.500 $1.900 $1.700 $1.610
WK ZN PAV MRK REMOV (W)8"(DOT)
LF 1,329.000 $4.000 $4.580 $4.000 $2.430
WK ZN PAV MRK REMOV (W)8"(SLD)
LF 1,769.000 $2.000 $3.800 $3.500 $2.430
WK ZN PAV MRK REMOV (W)12"(SLD)
LF 382.000 $4.000 $13.090 $12.000 $10.640
WK ZN PAV MRK REMOV (Y)6"(SLD)
LF 41,461.000 $2.000 $1.900 $1.700 $1.610
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
LF 1,550.000 $2.000 $2.420 $2.100 $1.520
REFL PAV MRK TY I (W)12"(SLD)(100MIL)
LF 150.000 $8.500 $7.850 $7.000 $9.120
TY I HIGH PERF PM (W)6"(BRK)(100MIL)
LF 5,710.000 $1.000 $1.310 $1.200 $1.520
TY I HIGH PERF PM (W)6"(SLD)(100MIL)
LF 12,130.000 $1.000 $1.310 $1.200 $1.520
TY I HIGH PERF PM (Y)6"(SLD)(100MIL)
LF 12,250.000 $1.000 $1.310 $1.200 $1.520
PAVEMENT SLER 6"
LF 30,090.000 $0.500 $0.460 $0.400 $0.610
PAVEMENT SLER 8"
LF 1,550.000 $1.000 $0.650 $0.600 $0.760
PAVEMENT SLER 12"
LF 150.000 $1.600 $2.620 $2.300 $4.560
REFL PAV MRKR TY II-C-R
EA 302.000 $8.500 $9.690 $8.500 $10.640
ELIM EXT PM & MRKS (4")
LF 49,702.000 $0.750 $0.330 $0.260 $0.530
ELIM EXT PM & MRKS (6")
LF 85,037.000 $2.000 $0.330 $0.260 $0.760
ELIM EXT PM & MRKS (8")
LF 3,097.000 $1.180 $0.790 $0.700 $0.760
ELIM EXT PM & MRKS (12")
LF 382.000 $3.000 $2.620 $2.250 $3.040
PAV SURF PREP FOR MRK (6")
LF 30,090.000 $0.300 $0.260 $0.220 $0.150
PAV SURF PREP FOR MRK (8")
LF 1,550.000 $0.750 $0.460 $0.400 $0.150
PAV SURF PREP FOR MRK (12")
LF 150.000 $1.000 $2.620 $2.250 $0.150
PAV SURF PREP FOR MRK (RPM)
EA 302.000 $1.000 $2.620 $2.250 $0.150
FULL - WIDTH MOWING
CYC 16.000 $4,000.000 $5,000.000 $2,000.000 $4,559.300
ANTI-GRAFFITI COATING (PERMNENT-TY II)
SF 9,868.000 $1.000 $1.500 $1.900 $1.630
NO. OF WORKING DAYS
$/D 20,000.000 $20,000.000 $856.000 $1,075.000 $950.000
NO. OF DAYS MILESTONE 1
$/D 25,000.000 $25,000.000 $305.000 $373.000 $373.000
TIP TESTING(DRILL SHAFT)
EA 108.000 $5,200.000 $30,000.000 $7,800.000 $11,429.720
REMOVE AND RE-LAY EXISTING STONE RIPRAP
CY 2,164.000 $100.000 $20.000 $170.000 $402.350
STEEL FENCE (REMOVE)
LF 106.000 $25.000 $50.000 $50.000 $30.400
STEEL FENCE (INSTALL)
LF 106.000 $50.000 $100.000 $170.000 $91.190
Totals: $1,096,476,057.160 $138,485,588.460 $147,202,794.140 $212,711,826.220