PREPARING ROW
|
STA
|
25.000
|
$1,500.000
|
$440,000.000
|
$25,000.000
|
$720,000.000
|
|
|
REMOV CONC (MOWSTRIP)
|
LF
|
827.000
|
$11.500
|
$7.000
|
$25.000
|
$11.640
|
|
|
RMV (10"-12") TRT/UNTRT BASE & ASPH PAV
|
SY
|
9,514.000
|
$12.000
|
$17.000
|
$16.000
|
$15.530
|
|
|
EXCAV (ROADWAY)
|
CY
|
4,663.000
|
$32.000
|
$25.000
|
$35.000
|
$11.330
|
|
|
EMBANK (FNL)(DC)(TY C1)
|
CY
|
2,551.000
|
$55.000
|
$48.000
|
$65.000
|
$11.480
|
|
|
FURN & PLACE TOPSOIL (4")
|
SY
|
1,336.000
|
$10.000
|
$30.000
|
$11.000
|
$23.280
|
|
|
BROADCAST SEED (PERM_URBAN_CLAY)
|
SY
|
1,336.000
|
$1.000
|
$1.250
|
$3.000
|
$0.760
|
|
|
BROADCAST SEED (TEMP_WARM_COOL)
|
SY
|
1,336.000
|
$1.000
|
$0.300
|
$3.000
|
$0.760
|
|
|
VEGETATIVE WATERING
|
TGL
|
22.000
|
$100.000
|
$200.000
|
$65.000
|
$71.430
|
|
|
FL BS (CMP IN PLC)(TYD GR1-2)(FNAL POS)
|
CY
|
3,322.000
|
$80.000
|
$125.000
|
$110.000
|
$118.450
|
|
|
LIME (COM OR QK)(SLURRY)
|
TON
|
372.000
|
$250.000
|
$425.000
|
$350.000
|
$434.510
|
|
|
LIME TRT (SUBGRADE)(12")
|
SY
|
13,774.000
|
$10.000
|
$10.000
|
$12.000
|
$13.610
|
|
|
EMULS ASPH (BS OR SUBGR TRT)(CSS-1H)
|
GAL
|
10,464.000
|
$5.750
|
$7.000
|
$4.000
|
$8.140
|
|
|
FOG SEAL (CSS-1H)
|
GAL
|
5,232.000
|
$4.500
|
$6.000
|
$4.000
|
$7.980
|
|
|
ASPH (CRS-2P)
|
GAL
|
5,232.000
|
$5.000
|
$7.000
|
$4.500
|
$8.740
|
|
|
AGGR (TY-D OR L, GR-4)
|
CY
|
97.000
|
$170.000
|
$270.000
|
$550.000
|
$467.330
|
|
|
D-GR HMA TY-B PG64-22 (EXEMPT)
|
TON
|
4,328.000
|
$165.000
|
$185.000
|
$125.000
|
$193.770
|
|
|
D-GR HMA TY-B PG64-22 (LEVEL-UP)
|
TON
|
288.000
|
$165.000
|
$255.000
|
$460.000
|
$338.150
|
|
|
TACK COAT
|
GAL
|
7,136.000
|
$6.000
|
$6.250
|
$4.500
|
$7.980
|
|
|
STONE-MTRX-ASPH SMA-D SAC-A PG76-22
|
TON
|
2,688.000
|
$165.000
|
$250.000
|
$170.000
|
$269.760
|
|
|
PLANE ASPH CONC PAV (2" TO 4 1/2")
|
SY
|
11,336.000
|
$6.000
|
$7.000
|
$7.000
|
$7.520
|
|
|
CEM STABIL BKFL
|
CY
|
51.000
|
$225.000
|
$450.000
|
$400.000
|
$265.960
|
|
|
TEMPORARY SPL SHORING
|
SF
|
1,000.000
|
$50.000
|
$200.000
|
$73.000
|
$75.990
|
|
|
DRILL SHAFT (18 IN)
|
LF
|
158.000
|
$200.000
|
$1,000.000
|
$340.000
|
$475.000
|
|
|
DRILL SHAFT (24 IN)
|
LF
|
27.000
|
$300.000
|
$135.000
|
$450.000
|
$475.000
|
|
|
DRILL SHAFT (30 IN)
|
LF
|
38.000
|
$350.000
|
$600.000
|
$510.000
|
$475.000
|
|
|
DRILL SHAFT (36 IN)
|
LF
|
1,452.000
|
$375.000
|
$1,200.000
|
$400.000
|
$475.000
|
|
|
DRILL SHAFT (66 IN)
|
LF
|
8,885.000
|
$900.000
|
$1,630.000
|
$1,600.000
|
$475.000
|
|
|
DRILL SHAFT (72 IN)
|
LF
|
3,002.000
|
$1,200.000
|
$1,890.000
|
$1,700.000
|
$555.000
|
|
|
DRILL SHAFT (RDWY ILL POLE) (30 IN)
|
LF
|
16.000
|
$350.000
|
$615.000
|
$540.000
|
$635.260
|
|
|
CL C CONC (ABUT)(HPC)
|
CY
|
143.600
|
$1,490.000
|
$2,250.000
|
$3,600.000
|
$5,130.000
|
|
|
CL C CONC (CAP)(HPC)(MASS)
|
CY
|
4,900.600
|
$1,500.000
|
$2,475.000
|
$2,300.000
|
$7,025.000
|
|
|
CL C CONC (COLUMN)(HPC)
|
CY
|
1,951.000
|
$1,500.000
|
$2,390.000
|
$1,900.000
|
$3,450.000
|
|
|
REINF CONC SLAB
|
SF
|
460,391.000
|
$36.000
|
$30.000
|
$41.000
|
$59.750
|
|
|
APPROACH SLAB
|
CY
|
183.000
|
$900.000
|
$900.000
|
$1,000.000
|
$1,000.000
|
|
|
PRESTR CONC GIRDER (TX54)
|
LF
|
5,805.060
|
$220.000
|
$280.000
|
$320.000
|
$420.000
|
|
|
PRESTR CONC GIRDER (TX70)
|
LF
|
56,640.000
|
$260.000
|
$285.000
|
$330.000
|
$563.000
|
|
|
RIPRAP (MOW STRIP)(4 IN)
|
CY
|
527.000
|
$690.000
|
$1,000.000
|
$660.000
|
$1,158.760
|
|
|
RIPRAP (STONE PROTECTION)(24 IN)
|
CY
|
2,094.000
|
$265.000
|
$185.000
|
$200.000
|
$352.250
|
|
|
RAIL (TY SSTR)
|
LF
|
8,020.000
|
$145.000
|
$105.000
|
$85.000
|
$129.750
|
|
|
SEALED EXPANSION JOINT (4 IN) (SEJ - M)
|
LF
|
1,720.100
|
$230.000
|
$330.000
|
$270.000
|
$444.400
|
|
|
RC PIPE (CL III)(24 IN)
|
LF
|
98.000
|
$120.000
|
$210.000
|
$160.000
|
$303.950
|
|
|
JCTBOX(COMPL)(PJB)(3FTX3FT)
|
EA
|
1.000
|
$7,000.000
|
$6,250.000
|
$8,000.000
|
$9,118.610
|
|
|
INLET (COMPL)(PSL)(SL)(3FTX3FT)
|
EA
|
1.000
|
$7,500.000
|
$2,000.000
|
$8,000.000
|
$22,796.520
|
|
|
SET (TY II) (24 IN) (RCP) (6: 1) (P)
|
EA
|
1.000
|
$3,000.000
|
$4,250.000
|
$1,300.000
|
$4,559.310
|
|
|
REMOV STR (INLET)
|
EA
|
2.000
|
$2,000.000
|
$1,250.000
|
$3,000.000
|
$2,279.660
|
|
|
REMOV STR (PIPE)
|
LF
|
87.000
|
$22.000
|
$25.000
|
$110.000
|
$75.990
|
|
|
REMOV STR (BRIDGE 1000 FT OR GREATER)
|
EA
|
2.000
|
$750,000.000
|
$3,500,000.000
|
$6,500,000.000
|
$11,123,745.000
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$3,750,000.000
|
$11,000,000.000
|
$15,000,000.000
|
$18,000,000.000
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
52.000
|
$8,000.000
|
$35,000.000
|
$40,000.000
|
$26,770.000
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
DAY
|
1,400.000
|
$200.000
|
$125.000
|
$100.000
|
$60.790
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
EA
|
2.000
|
$10,000.000
|
$50,000.000
|
$15,000.000
|
$37,994.190
|
|
|
TMA (STATIONARY)
|
DAY
|
700.000
|
$300.000
|
$1.000
|
$240.000
|
$361.860
|
|
|
TMA (MOBILE OPERATION)
|
HR
|
7,000.000
|
$40.000
|
$1.000
|
$50.000
|
$113.980
|
|
|
TEMP SEDMT CONT FENCE (INSTALL)
|
LF
|
285.000
|
$5.000
|
$12.000
|
$9.000
|
$16.350
|
|
|
TEMP SEDMT CONT FENCE (REMOVE)
|
LF
|
285.000
|
$2.000
|
$2.000
|
$3.000
|
$6.930
|
|
|
BIODEG EROSN CONT LOGS (INSTL) (12")
|
LF
|
504.000
|
$12.000
|
$18.000
|
$6.000
|
$19.040
|
|
|
BIODEG EROSN CONT LOGS (REMOVE)
|
LF
|
504.000
|
$3.000
|
$2.000
|
$1.000
|
$9.060
|
|
|
CONSTRUCTING DETOURS
|
SY
|
2,564.000
|
$150.000
|
$180.000
|
$120.000
|
$121.580
|
|
|
PORT CTB (FUR & INST)(F-SHAPE)(TY 1)
|
LF
|
16,470.000
|
$50.000
|
$20.000
|
$85.000
|
$95.250
|
|
|
PORT CTB (MOVE)(F-SHAPE)(TY 1)
|
LF
|
750.000
|
$7.500
|
$10.000
|
$50.000
|
$22.250
|
|
|
PORT CTB (REMOVE)(F-SHAPE)(TY 1)
|
LF
|
16,470.000
|
$18.000
|
$5.000
|
$40.000
|
$30.650
|
|
|
PERM CTB (SGL SLOPE) (TY 1) (42 )
|
LF
|
5,244.000
|
$180.000
|
$90.000
|
$75.000
|
$109.550
|
|
|
PERM CTB (SGL SLOPE) (TY 3) (42 )
|
LF
|
110.000
|
$400.000
|
$500.000
|
$700.000
|
$434.440
|
|
|
MILL RUMBLE STRIPS (ASPHALT) (SHLDR)
|
LF
|
4,446.000
|
$1.000
|
$1.900
|
$1.500
|
$0.380
|
|
|
MTL W-BEAM GD FEN (STEEL POST)
|
LF
|
11,563.000
|
$35.000
|
$36.000
|
$28.000
|
$40.270
|
|
|
MTL BEAM GD FEN TRANS (THRIE-BEAM)
|
EA
|
4.000
|
$3,000.000
|
$3,300.000
|
$2,500.000
|
$3,723.430
|
|
|
DOWNSTREAM ANCHOR TERMINAL SECTION
|
EA
|
4.000
|
$1,500.000
|
$1,850.000
|
$1,600.000
|
$2,051.690
|
|
|
REMOVE METAL BEAM GUARD FENCE
|
LF
|
12,175.000
|
$4.000
|
$3.500
|
$2.500
|
$3.800
|
|
|
REMOVE DOWNSTREAM ANCHOR TERMINAL
|
EA
|
4.000
|
$225.000
|
$200.000
|
$230.000
|
$227.970
|
|
|
RM MTL BM GD FENCE TRANS (THRIE-BEAM)
|
EA
|
5.000
|
$500.000
|
$275.000
|
$230.000
|
$303.950
|
|
|
CABLE BARRIER SYSTEM (INSTALL)(TL-3)
|
LF
|
1,555.000
|
$40.000
|
$33.000
|
$33.000
|
$37.230
|
|
|
CABLE BARRIER TERM SEC (INSTL)(TL-3)
|
EA
|
2.000
|
$3,000.000
|
$6,500.000
|
$5,000.000
|
$7,142.910
|
|
|
CABLE BARRIER (REMOVE)
|
LF
|
2,997.000
|
$6.000
|
$2.750
|
$8.000
|
$3.040
|
|
|
CABLE BARRIER TERMINAL SECTION (REMOVE)
|
EA
|
2.000
|
$2,000.000
|
$1,025.000
|
$1,700.000
|
$1,139.830
|
|
|
GUARDRAIL END TREATMENT (INSTALL)
|
EA
|
4.000
|
$3,000.000
|
$4,500.000
|
$3,300.000
|
$4,977.240
|
|
|
GUARDRAIL END TREATMENT (REMOVE)
|
EA
|
4.000
|
$300.000
|
$275.000
|
$230.000
|
$303.950
|
|
|
CRASH CUSH ATTEN (MOVE & RESET)
|
EA
|
1.000
|
$2,000.000
|
$3,000.000
|
$3,000.000
|
$3,039.540
|
|
|
CRASH CUSH ATTEN (REMOVE)
|
EA
|
1.000
|
$1,500.000
|
$2,000.000
|
$2,500.000
|
$1,823.730
|
|
|
CRASH CUSH ATTEN (INSTL)(R)(N)(TL3)
|
EA
|
2.000
|
$20,000.000
|
$40,000.000
|
$32,000.000
|
$42,933.440
|
|
|
CRASH CUSH ATTEN (INSTL)(S)(N)(TL3)
|
EA
|
1.000
|
$10,000.000
|
$15,000.000
|
$11,000.000
|
$14,437.780
|
|
|
RELOCATE RD IL ASM (TRANS-BASE)
|
EA
|
2.000
|
$3,300.000
|
$4,000.000
|
$3,500.000
|
$3,875.410
|
|
|
REPLACE LUMINAIRE W/(250W EQ) LED
|
EA
|
2.000
|
$1,000.000
|
$650.000
|
$580.000
|
$1,363.240
|
|
|
CONDT (PVC) (SCH 40) (2")
|
LF
|
320.000
|
$18.000
|
$38.000
|
$33.000
|
$17.600
|
|
|
CONDT (PVC) (SCH 40) (2") (BORE)
|
LF
|
320.000
|
$35.000
|
$70.000
|
$60.000
|
$44.010
|
|
|
ELEC CONDR (NO.8) BARE
|
LF
|
640.000
|
$2.500
|
$5.250
|
$5.000
|
$3.510
|
|
|
ELEC CONDR (NO.8) INSULATED
|
LF
|
1,280.000
|
$2.500
|
$10.000
|
$9.000
|
$3.430
|
|
|
GROUND BOX TY A (122311)W/APRON
|
EA
|
2.000
|
$1,500.000
|
$2,500.000
|
$2,300.000
|
$1,633.750
|
|
|
ALUMINUM SIGNS (TY O)
|
SF
|
317.000
|
$50.000
|
$135.000
|
$118.000
|
$63.300
|
|
|
REPLACE EXISTING ALUMINUM SIGNS(TY A)
|
SF
|
30.000
|
$55.000
|
$60.000
|
$50.000
|
$53.190
|
|
|
REPLACE EXISTING ALUMINUM SIGNS(TY G)
|
SF
|
251.000
|
$40.000
|
$142.000
|
$125.000
|
$68.390
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
|
EA
|
5.000
|
$700.000
|
$940.000
|
$1,300.000
|
$1,047.120
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
|
EA
|
2.000
|
$850.000
|
$1,130.000
|
$1,700.000
|
$1,089.670
|
|
|
REMOVE SM RD SN SUP&AM
|
EA
|
4.000
|
$150.000
|
$158.000
|
$200.000
|
$303.950
|
|
|
REPLACE LRSA
|
EA
|
1.000
|
$6,000.000
|
$2,540.000
|
$2,500.000
|
$4,331.340
|
|
|
INS OH SN SUP(85 FT BRDG)
|
EA
|
1.000
|
$50,000.000
|
$120,000.000
|
$105,000.000
|
$126,520.670
|
|
|
REMOVE OVERHD SIGN SUP
|
EA
|
1.000
|
$20,000.000
|
$15,750.000
|
$14,000.000
|
$19,042.690
|
|
|
INSTL DEL ASSM (D-SW)SZ 1(BRF)CTB
|
EA
|
80.000
|
$20.000
|
$32.000
|
$50.000
|
$63.830
|
|
|
INSTL DEL ASSM (D-SW)SZ 1(BRF)CTB (BI)
|
EA
|
54.000
|
$42.000
|
$32.000
|
$50.000
|
$63.830
|
|
|
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2
|
EA
|
118.000
|
$45.000
|
$32.000
|
$50.000
|
$37.990
|
|
|
WK ZN PAV MRK REMOV (W)6"(BRK)
|
LF
|
6,045.000
|
$3.500
|
$2.030
|
$1.800
|
$1.610
|
|
|
WK ZN PAV MRK REMOV (W)6"(SLD)
|
LF
|
37,531.000
|
$1.500
|
$1.900
|
$1.700
|
$1.610
|
|
|
WK ZN PAV MRK REMOV (W)8"(DOT)
|
LF
|
1,329.000
|
$4.000
|
$4.580
|
$4.000
|
$2.430
|
|
|
WK ZN PAV MRK REMOV (W)8"(SLD)
|
LF
|
1,769.000
|
$2.000
|
$3.800
|
$3.500
|
$2.430
|
|
|
WK ZN PAV MRK REMOV (W)12"(SLD)
|
LF
|
382.000
|
$4.000
|
$13.090
|
$12.000
|
$10.640
|
|
|
WK ZN PAV MRK REMOV (Y)6"(SLD)
|
LF
|
41,461.000
|
$2.000
|
$1.900
|
$1.700
|
$1.610
|
|
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
|
LF
|
1,550.000
|
$2.000
|
$2.420
|
$2.100
|
$1.520
|
|
REFL PAV MRK TY I (W)12"(SLD)(100MIL)
|
LF
|
150.000
|
$8.500
|
$7.850
|
$7.000
|
$9.120
|
|
TY I HIGH PERF PM (W)6"(BRK)(100MIL)
|
LF
|
5,710.000
|
$1.000
|
$1.310
|
$1.200
|
$1.520
|
|
TY I HIGH PERF PM (W)6"(SLD)(100MIL)
|
LF
|
12,130.000
|
$1.000
|
$1.310
|
$1.200
|
$1.520
|
|
TY I HIGH PERF PM (Y)6"(SLD)(100MIL)
|
LF
|
12,250.000
|
$1.000
|
$1.310
|
$1.200
|
$1.520
|
|
|
PAVEMENT SLER 6"
|
LF
|
30,090.000
|
$0.500
|
$0.460
|
$0.400
|
$0.610
|
|
|
PAVEMENT SLER 8"
|
LF
|
1,550.000
|
$1.000
|
$0.650
|
$0.600
|
$0.760
|
|
|
PAVEMENT SLER 12"
|
LF
|
150.000
|
$1.600
|
$2.620
|
$2.300
|
$4.560
|
|
REFL PAV MRKR TY II-C-R
|
EA
|
302.000
|
$8.500
|
$9.690
|
$8.500
|
$10.640
|
|
|
ELIM EXT PM & MRKS (4")
|
LF
|
49,702.000
|
$0.750
|
$0.330
|
$0.260
|
$0.530
|
|
|
ELIM EXT PM & MRKS (6")
|
LF
|
85,037.000
|
$2.000
|
$0.330
|
$0.260
|
$0.760
|
|
|
ELIM EXT PM & MRKS (8")
|
LF
|
3,097.000
|
$1.180
|
$0.790
|
$0.700
|
$0.760
|
|
|
ELIM EXT PM & MRKS (12")
|
LF
|
382.000
|
$3.000
|
$2.620
|
$2.250
|
$3.040
|
|
|
PAV SURF PREP FOR MRK (6")
|
LF
|
30,090.000
|
$0.300
|
$0.260
|
$0.220
|
$0.150
|
|
|
PAV SURF PREP FOR MRK (8")
|
LF
|
1,550.000
|
$0.750
|
$0.460
|
$0.400
|
$0.150
|
|
|
PAV SURF PREP FOR MRK (12")
|
LF
|
150.000
|
$1.000
|
$2.620
|
$2.250
|
$0.150
|
|
|
PAV SURF PREP FOR MRK (RPM)
|
EA
|
302.000
|
$1.000
|
$2.620
|
$2.250
|
$0.150
|
|
|
FULL - WIDTH MOWING
|
CYC
|
16.000
|
$4,000.000
|
$5,000.000
|
$2,000.000
|
$4,559.300
|
|
|
ANTI-GRAFFITI COATING (PERMNENT-TY II)
|
SF
|
9,868.000
|
$1.000
|
$1.500
|
$1.900
|
$1.630
|
|
|
NO. OF WORKING DAYS
|
$/D
|
20,000.000
|
$20,000.000
|
$856.000
|
$1,075.000
|
$950.000
|
|
|
NO. OF DAYS MILESTONE 1
|
$/D
|
25,000.000
|
$25,000.000
|
$305.000
|
$373.000
|
$373.000
|
|
|
TIP TESTING(DRILL SHAFT)
|
EA
|
108.000
|
$5,200.000
|
$30,000.000
|
$7,800.000
|
$11,429.720
|
|
|
REMOVE AND RE-LAY EXISTING STONE RIPRAP
|
CY
|
2,164.000
|
$100.000
|
$20.000
|
$170.000
|
$402.350
|
|
|
STEEL FENCE (REMOVE)
|
LF
|
106.000
|
$25.000
|
$50.000
|
$50.000
|
$30.400
|
|
|
STEEL FENCE (INSTALL)
|
LF
|
106.000
|
$50.000
|
$100.000
|
$170.000
|
$91.190
|
|
Totals: |
$1,096,476,057.160
|
$138,485,588.460
|
$147,202,794.140
|
$212,711,826.220
|