MCLENNAN US 77 (0209-01-076)

Items: 67

County: MCLENNAN
Length: 0.0000 MILES
Highway: US 77
District: WACO
Control Number: 0209-01-076
DBE Goal: 0.0%
Project: F 2026(605)
Guaranty: $100,000.00
Time: 109 WORKING DAYS
Engineer's Estimate: $9,476,549.15
Date: 05/06/2026 (5 weeks ago)
Contract Number: 5263009
Type: RESURFACE ROADWAY
Project ID: A00196395
Contract Type: Federal
Project Description: MILL & INLAY
Mail/Deliver Bids To:
TEXAS DEPARTMENT OF TRANSPORTATION
ATTN: CONSTRUCTION DIVISION - RM M1C3.02
6230 E STASSNEY LN, AUSTIN, TX 78744
CLAYTON ZACHA
Actions:
Notice Questions HCS Excel Tabs Print Print Notice
Bidders (4)
E
Engineer's Estimate
$9,476,549.15
$5,957,587.85
Over/Under Est: -37.13% -$3,518,961.30
Over/Under Est: -28.48% -$2,699,051.80
Amt Left: 13.76% $819,909.50
Over/Under Est: -23.08% -$2,186,744.26
Amt Left: 22.36% $1,332,217.04
Delta: -7.56% -$512,307.54
Over/Under Est: -14.74% -$1,396,439.57
Amt Left: 35.63% $2,122,521.73
Delta: -10.84% -$790,304.69

Bid Items & Bid Tabulations

67 Total 0 of 67
MCLENNAN  |  US 77  |  WACO  |  0209-01-076  |  05/06/2026  |  $9,476,549.15  |  F 2026(605)  |  RESURF ROADWAY  |  109 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
BIG CREEK CONSTRUCTION, LTD.
TEXAS MATERIALS GROUP, INC.
KNIFE RIVER CORPORATION - SOUTH
LONE STAR PAVING COMPANY
EXCAV (ROADWAY)
CY 116.000 $30.000 $50.000 $68.080 $45.000 $22.000
EMBANK (FNL)(OC)(TY B)
CY 87.000 $30.000 $50.000 $90.350 $35.000 $24.000
BROADCAST SEED (PERM_URBAN_CLAY)
SY 3,000.000 $3.000 $0.740 $0.770 $1.000 $1.000
BROADCAST SEED (TEMP_WARM_COOL)
SY 3,000.000 $1.000 $0.700 $0.780 $0.750 $1.000
VEGETATIVE WATERING
TGL 49.000 $32.000 $30.000 $50.000 $25.000 $77.000
SP MIXES SP-C SAC-B PG70-22
TON 21,504.000 $140.000 $90.000 $101.600 $112.000 $135.000
TOM-C PG76-22 SAC-A
TON 10,752.000 $150.000 $120.000 $148.500 $164.000 $165.000
TACK COAT
GAL 18,699.000 $3.000 $1.000 $3.300 $2.990 $4.000
FLEXIBLE PAVEMENT STRUCTURE REPAIR(11")
SY 882.000 $85.000 $100.000 $99.000 $141.000 $140.000
PLANE ASPH CONC PAV(3")
SY 191,565.000 $3.000 $2.600 $3.200 $2.490 $2.350
CONC STR REPAIR (STANDARD)
SF 413.000 $185.000 $75.000 $60.000 $65.000 $60.000
RIPRAP (MOW STRIP)(4 IN)
CY 125.000 $700.000 $680.000 $723.000 $620.000 $850.000
CLEANING AND SEALING EXIST JOINTS (CL7)
LF 1,178.000 $55.000 $60.000 $61.000 $50.000 $61.000
POLYESTER POLYMER CONC OVERLAY
CY 251.000 $4,000.000 $4,000.000 $3,763.000 $3,450.000 $3,400.000
ADJUSTING MANHOLES
EA 31.000 $1,500.000 $2,200.000 $2,250.000 $2,100.000 $2,500.000
ADJUSTING MANHOLES (WATER VALVE BOX)
EA 22.000 $650.000 $900.000 $1,715.000 $1,400.000 $1,500.000
DIAMOND GRINDING SLAB
SY 459.000 $100.000 $35.000 $70.000 $42.000 $275.000
MICROMILLING CONCRETE SLAB (1/2 IN)
SY 2,290.000 $60.000 $25.000 $8.200 $11.500 $22.000
MOBILIZATION
LS 1.000 $865,000.000 $90,000.000 $202,000.000 $330,000.000 $405,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 5.000 $5,000.000 $4,000.000 $1,500.000 $20,000.000 $23,000.000
PORTABLE CHANGEABLE MESSAGE SIGN
EA 4.000 $15,000.000 $7,500.000 $5,400.000 $5,000.000 $10,000.000
TMA (STATIONARY)
DAY 109.000 $250.000 $350.000 $85.190 $500.000 $275.000
TMA (MOBILE OPERATION)
DAY 5.000 $250.000 $700.000 $585.000 $850.000 $275.000
ROCK FILTER DAMS (INSTALL) (TY 3)
LF 500.000 $70.000 $75.000 $90.000 $25.000 $17.000
ROCK FILTER DAMS (REMOVE)
LF 500.000 $20.000 $10.000 $20.000 $8.000 $17.000
TEMP SEDMT CONT FENCE (INSTALL)
LF 2,000.000 $6.000 $4.500 $3.820 $4.000 $4.000
TEMP SEDMT CONT FENCE (REMOVE)
LF 2,000.000 $1.500 $1.000 $1.250 $1.250 $1.500
DRIVEWAYS (ACP)
SY 6,998.000 $150.000 $36.000 $45.000 $62.000 $65.000
MTL W-BEAM GD FEN (STEEL POST)
LF 1,037.500 $38.000 $42.000 $32.500 $32.500 $31.000
MTL BEAM GD FEN TRANS (THRIE-BEAM)
EA 4.000 $2,800.000 $2,500.000 $2,700.000 $2,900.000 $2,100.000
DOWNSTREAM ANCHOR TERMINAL SECTION
EA 5.000 $1,800.000 $1,500.000 $1,200.000 $1,200.000 $1,300.000
REMOVE METAL BEAM GUARD FENCE
LF 937.500 $8.000 $3.000 $2.500 $2.500 $2.000
REMOVE TERMINAL ANCHOR SECTION
EA 1.000 $600.000 $220.000 $150.000 $150.000 $200.000
REMOVE DOWNSTREAM ANCHOR TERMINAL
EA 4.000 $600.000 $220.000 $150.000 $150.000 $200.000
RM MTL BM GD FENCE TRANS (THRIE-BEAM)
EA 4.000 $400.000 $250.000 $200.000 $200.000 $200.000
GUARDRAIL END TREATMENT (INSTALL)
EA 9.000 $4,000.000 $3,400.000 $2,950.000 $2,950.000 $3,100.000
GUARDRAIL END TREATMENT (REMOVE)
EA 9.000 $500.000 $300.000 $250.000 $250.000 $200.000
INSTL DEL ASSM (D-SW)SZ 1(BRF)CTB (BI)
EA 20.000 $20.000 $30.000 $20.000 $20.000 $32.000
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2
EA 27.000 $45.000 $50.000 $45.000 $45.000 $42.000
WK ZN PAV MRK NON-REMOV (W)6"(BRK)
LF 12,280.000 $0.300 $0.300 $0.250 $0.200 $0.200
WK ZN PAV MRK NON-REMOV (W)6"(SLD)
LF 27,891.000 $0.300 $0.250 $0.200 $0.200 $0.200
WK ZN PAV MRK NON-REMOV (W)8"(DOT)
LF 471.000 $0.700 $0.450 $0.400 $0.300 $0.300
WK ZN PAV MRK NON-REMOV (W)8"(SLD)
LF 2,552.000 $0.700 $0.450 $0.400 $0.300 $0.300
WK ZN PAV MRK NON-REMOV (W)24"(SLD)
LF 2,121.000 $5.000 $4.000 $2.000 $1.750 $1.750
WK ZN PAV MRK NON-REMOV (W)(ARROW)
EA 12.000 $125.000 $70.000 $50.000 $50.000 $50.000
WK ZN PAV MRK NON-REMOV (W)(UTURN ARW)
EA 2.000 $125.000 $75.000 $55.000 $100.000 $100.000
WK ZN PAV MRK NON-REMOV(W)(WORD)
EA 14.000 $225.000 $80.000 $60.000 $50.000 $50.000
WK ZN PAV MRK NON-REMOV(W)36"(YLD TRI)
EA 5.000 $30.000 $20.000 $15.000 $11.000 $11.000
WK ZN PAV MRK NON-REMOV (Y)6"(BRK)
LF 9,550.000 $0.300 $0.300 $0.250 $0.200 $0.200
WK ZN PAV MRK NON-REMOV (Y)6"(SLD)
LF 43,205.000 $0.300 $0.250 $0.200 $0.200 $0.200
WK ZN PAV MRK SHT TERM (TAB)TY W
EA 6,960.000 $4.000 $1.000 $0.950 $0.500 $1.250
WK ZN PAV MRK SHT TERM (TAB)TY Y-2
EA 16,036.000 $4.000 $1.000 $0.950 $0.500 $1.250
REFL PAV MRK TY I (W)8"(DOT)(100MIL)
LF 471.000 $1.750 $1.200 $1.000 $1.500 $15.000
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
LF 2,552.000 $1.750 $1.100 $0.930 $0.700 $0.700
REFL PAV MRK TY I (W)24"(SLD)(100MIL)
LF 2,121.000 $12.000 $7.000 $6.000 $9.650 $9.650
TY I HIGH PERF PM (W)6"(BRK)(100MIL)
LF 13,220.000 $1.500 $0.600 $0.530 $0.550 $0.550
TY I HIGH PERF PM (W)6"(SLD)(100MIL)
LF 27,891.000 $1.500 $0.600 $0.500 $0.530 $0.530
TY I HIGH PERF PM (Y)6"(BRK)(100MIL)
LF 9,550.000 $1.500 $0.600 $0.530 $0.540 $0.540
TY I HIGH PERF PM (Y)6"(SLD)(100MIL)
LF 43,205.000 $1.500 $0.600 $0.500 $0.540 $0.540
PREFAB PM TY C (W)(ARROW)
EA 12.000 $600.000 $250.000 $225.000 $215.000 $215.000
PREFAB PM TY C (W)(UTURN ARROW)
EA 2.000 $500.000 $350.000 $275.000 $425.000 $425.000
PREFAB PM TY C (W)(WORD)
EA 14.000 $600.000 $200.000 $155.000 $320.000 $320.000
PREFAB PM TY C (W)(18")(YLD TRI)
EA 5.000 $100.000 $100.000 $75.000 $40.000 $40.000
PREFAB PM TY C (MULTI)(SHIELD)
EA 1.000 $3,000.000 $1,219.000 $1,025.000 $2,225.000 $2,225.000
REFL PAV MRKR TY I-C
EA 602.000 $6.000 $5.000 $3.750 $5.500 $5.500
REFL PAV MRKR TY II-A-A
EA 643.000 $6.000 $5.000 $3.750 $5.500 $5.500
BONDING COURSE
GAL 22,438.000 $5.000 $1.000 $4.000 $4.150 $4.000
Totals: $9,476,549.150 $5,957,587.850 $6,777,497.350 $7,289,804.890 $8,080,109.580
INCLUDES FORCE ACCOUNT WORK AMOUNTS AS FOLLOWS:
Description Amount
ENVIRONMENTAL: CONTRACTOR FORCE ACCOUNT WORK (NONPART) $20,000.00
SAFETY CONTINGENCY: CONTRACTOR FORCE ACCOUNT WORK (NON-PART) $20,000.00
Total: $40,000.00