PREPARING ROW
|
STA
|
312.100
|
$2,688.000
|
$2,000.000
|
$10,320.100
|
$750.000
|
$14,702.710
|
|
|
REMOVING CONC (RIPRAP)
|
CY
|
3.200
|
$200.000
|
$500.000
|
$195.980
|
$350.000
|
$210.000
|
|
|
REMOVING CONC (DRIVEWAYS)
|
SY
|
211.000
|
$25.000
|
$20.000
|
$15.450
|
$25.000
|
$17.000
|
|
|
REMOVING CONCRETE(MOW STRIP)
|
LF
|
1,904.000
|
$10.000
|
$15.000
|
$7.470
|
$9.000
|
$13.000
|
|
|
REMOVING STB BASE AND ASPH PAV(10-14")
|
SY
|
6,224.000
|
$10.000
|
$10.000
|
$6.740
|
$4.000
|
$13.000
|
|
|
REMOVING STAB BASE AND ASPH PV (8"-22")
|
SY
|
25,552.000
|
$10.000
|
$10.000
|
$7.790
|
$4.300
|
$15.000
|
|
|
EXCAVATION (ROADWAY)
|
CY
|
16,594.000
|
$17.300
|
$17.000
|
$16.780
|
$20.000
|
$12.000
|
|
|
EMBANKMENT (FINAL)(DENS CONT)(TY B)
|
CY
|
28,191.000
|
$19.000
|
$17.000
|
$12.670
|
$25.000
|
$15.000
|
|
|
EMBANKMENT (FINAL) (DENS CONT) (TY C1)
|
CY
|
299,871.000
|
$10.000
|
$17.000
|
$17.800
|
$30.000
|
$22.000
|
|
|
FURNISHING AND PLACING TOPSOIL (4")
|
SY
|
91,122.000
|
$4.000
|
$1.000
|
$1.760
|
$0.250
|
$1.500
|
|
|
FURNISHING AND PLACING TOPSOIL (3")
|
SY
|
81,438.000
|
$2.500
|
$1.000
|
$1.320
|
$1.000
|
$1.900
|
|
|
BROADCAST SEED (PERM) (RURAL) (CLAY)
|
SY
|
91,122.000
|
$0.500
|
$0.200
|
$0.280
|
$0.350
|
$0.500
|
|
|
DRILL SEEDING (PERM) (RURAL) (CLAY)
|
SY
|
81,438.000
|
$0.300
|
$0.200
|
$0.330
|
$0.350
|
$0.500
|
|
|
BROADCAST SEED (TEMP)(WARM OR COOL)
|
SY
|
172,560.000
|
$0.350
|
$0.120
|
$0.230
|
$0.250
|
$0.500
|
|
|
VEGETATIVE WATERING
|
MG
|
2,802.200
|
$30.000
|
$20.000
|
$35.000
|
$1.000
|
$23.000
|
|
|
SOIL RETENTION BLANKETS (CL 1) (TY C)
|
SY
|
16,426.000
|
$2.250
|
$1.500
|
$0.940
|
$1.300
|
$3.500
|
|
|
FL BS (CMP IN PLACE)(TY D GR 3)(IN VEH)
|
CY
|
2,281.000
|
$75.000
|
$55.000
|
$66.320
|
$56.000
|
$100.000
|
|
|
FL BS(CMP IN PLC)(TY D GR 5)(FNAL POS)
|
CY
|
40,574.000
|
$90.000
|
$55.000
|
$68.570
|
$62.000
|
$100.000
|
|
|
REWRKING BS MATL (TY C)(10")(ORD COMP)
|
SY
|
60,389.000
|
$3.500
|
$2.500
|
$3.850
|
$2.500
|
$3.500
|
|
|
LIME(HYD,COM OR QK)(SLRY)OR QK(DRY)
|
TON
|
1,335.000
|
$320.000
|
$325.000
|
$325.880
|
$300.000
|
$351.000
|
|
|
LIME TRT (SUBGRADE)(8")
|
SY
|
48,420.000
|
$7.000
|
$5.000
|
$4.110
|
$5.000
|
$5.000
|
|
|
LIME TRT (SUBGRADE)(12")
|
SY
|
7,151.000
|
$3.900
|
$7.000
|
$4.970
|
$5.500
|
$6.000
|
|
|
CEMENT
|
TON
|
1,254.000
|
$270.000
|
$300.000
|
$273.740
|
$260.000
|
$435.000
|
|
|
CEMENT TREAT(EXIST MATL)(8")
|
SY
|
93,373.000
|
$4.700
|
$2.500
|
$3.310
|
$2.750
|
$3.000
|
|
|
CEMENT TREAT (NEW BASE)(12")
|
SY
|
7,151.000
|
$3.250
|
$5.000
|
$6.470
|
$3.000
|
$4.000
|
|
|
PRIME COAT(MC-30 OR AE-P)
|
GAL
|
8,876.000
|
$8.000
|
$5.000
|
$5.000
|
$5.500
|
$8.000
|
|
|
EMULS ASPH (BS OR SUBGR TRT)(CSS-1H)
|
GAL
|
104,711.000
|
$4.000
|
$5.000
|
$3.400
|
$2.000
|
$8.000
|
|
|
FOG SEAL (CSS-1H)
|
GAL
|
9,348.000
|
$6.000
|
$5.000
|
$4.300
|
$4.000
|
$6.000
|
|
|
ASPH (CRS-2)
|
GAL
|
62,038.000
|
$4.150
|
$3.500
|
$3.400
|
$3.750
|
$8.000
|
|
|
AGGR(TY-D GR-4 OR TY-L GR-4)
|
CY
|
1,022.000
|
$200.000
|
$130.000
|
$278.000
|
$190.000
|
$900.000
|
|
|
CEM STABIL BKFL
|
CY
|
1,628.000
|
$285.000
|
$175.000
|
$117.680
|
$250.000
|
$260.000
|
|
|
CUT & RESTORE ASPH PAVING
|
SY
|
398.000
|
$150.000
|
$125.000
|
$204.900
|
$100.000
|
$145.000
|
|
|
TRENCH EXCAVATION PROTECTION
|
LF
|
1,266.000
|
$328.000
|
$10.000
|
$0.010
|
$9.000
|
$51.000
|
|
|
TEMPORARY SPL SHORING
|
SF
|
14,820.000
|
$28.000
|
$22.000
|
$15.030
|
$26.750
|
$35.000
|
|
|
DRILL SHAFT (18 IN)
|
LF
|
738.000
|
$152.000
|
$100.000
|
$58.120
|
$125.000
|
$250.000
|
|
|
DRILL SHAFT (36 IN)
|
LF
|
2,558.000
|
$325.000
|
$300.000
|
$246.800
|
$315.000
|
$270.000
|
|
|
DRILL SHAFT (SIGN MTS) (24 IN)
|
LF
|
63.000
|
$200.000
|
$500.000
|
$300.000
|
$330.000
|
$365.000
|
|
|
CL B CONC (FLUME)
|
CY
|
18.100
|
$1,000.000
|
$650.000
|
$804.480
|
$1,000.000
|
$920.000
|
|
|
CL C CONC (ABUT)(HPC)
|
CY
|
253.800
|
$1,711.000
|
$1,200.000
|
$1,052.090
|
$950.000
|
$1,001.000
|
|
|
CL C CONC (CAP)(HPC)
|
CY
|
155.200
|
$1,650.000
|
$1,400.000
|
$1,568.100
|
$1,100.000
|
$1,500.000
|
|
|
CL C CONC (COLUMN)(HPC)
|
CY
|
94.000
|
$2,000.000
|
$1,400.000
|
$970.890
|
$1,200.000
|
$1,600.000
|
|
|
REINF CONC SLAB
|
SF
|
39,600.000
|
$29.500
|
$25.000
|
$30.000
|
$25.000
|
$22.000
|
|
|
APPROACH SLAB
|
CY
|
295.200
|
$660.000
|
$800.000
|
$657.140
|
$615.000
|
$850.000
|
|
|
PRESTR CONC GIRDER (TX34)
|
LF
|
2,382.000
|
$230.000
|
$190.000
|
$180.230
|
$235.000
|
$215.000
|
|
|
PRESTR CONC GIRDER (TX54)
|
LF
|
2,883.800
|
$184.000
|
$220.000
|
$207.380
|
$215.000
|
$245.000
|
|
|
RIPRAP (CONC)(5 IN)
|
CY
|
210.000
|
$1,236.000
|
$600.000
|
$732.060
|
$580.000
|
$800.000
|
|
|
RIPRAP (CONC)(CL B)(RR8&RR9)
|
CY
|
604.000
|
$625.000
|
$550.000
|
$497.750
|
$750.000
|
$800.000
|
|
|
RIPRAP (STONE PROTECTION)(12 IN)
|
CY
|
2,090.000
|
$280.000
|
$180.000
|
$157.300
|
$140.000
|
$220.000
|
|
|
RIPRAP (STONE PROTECTION)(18 IN)
|
CY
|
119.000
|
$180.000
|
$200.000
|
$161.760
|
$288.000
|
$300.000
|
|
|
RIPRAP (MOW STRIP)(4 IN)
|
CY
|
282.300
|
$650.000
|
$650.000
|
$628.070
|
$585.000
|
$800.000
|
|
|
RAIL (TY T223)
|
LF
|
904.000
|
$160.000
|
$150.000
|
$100.660
|
$150.000
|
$146.000
|
|
|
RAIL (TY SSTR)
|
LF
|
1,212.000
|
$130.000
|
$85.000
|
$97.530
|
$110.000
|
$120.000
|
|
|
ARMOR JOINT (SEALED)
|
LF
|
168.000
|
$165.000
|
$140.000
|
$99.770
|
$135.000
|
$120.000
|
|
|
SEALED EXPANSION JOINT (4 IN) (SEJ - M)
|
LF
|
160.000
|
$180.000
|
$240.000
|
$193.290
|
$220.000
|
$260.000
|
|
|
CONC BOX CULV (3 FT X 2 FT)
|
LF
|
204.000
|
$545.000
|
$350.000
|
$238.810
|
$513.000
|
$350.000
|
|
|
CONC BOX CULV (3 FT X 3 FT)
|
LF
|
120.000
|
$472.000
|
$400.000
|
$258.870
|
$509.000
|
$420.000
|
|
|
CONC BOX CULV (4 FT X 3 FT)
|
LF
|
539.000
|
$450.000
|
$425.000
|
$295.170
|
$415.000
|
$390.000
|
|
|
CONC BOX CULV (4 FT X 4 FT)
|
LF
|
66.000
|
$577.000
|
$450.000
|
$355.950
|
$629.000
|
$430.000
|
|
|
CONC BOX CULV (5 FT X 2 FT)
|
LF
|
135.000
|
$457.000
|
$475.000
|
$326.340
|
$480.000
|
$373.000
|
|
|
CONC BOX CULV (5 FT X 3 FT)
|
LF
|
122.000
|
$425.000
|
$550.000
|
$371.640
|
$525.000
|
$470.000
|
|
|
CONC BOX CULV (5 FT X 5 FT)
|
LF
|
56.000
|
$450.000
|
$700.000
|
$527.230
|
$555.000
|
$515.000
|
|
|
CONC BOX CULV (4 FT X 3 FT)(EXTEND)
|
LF
|
460.000
|
$850.000
|
$425.000
|
$328.850
|
$455.000
|
$770.000
|
|
|
CONC BOX CULV (6 FT X 5 FT)(EXTEND)
|
LF
|
54.000
|
$608.000
|
$1,200.000
|
$1,034.900
|
$1,020.000
|
$900.000
|
|
|
CONC BOX CULV (6 FT X 6 FT)(EXTEND)
|
LF
|
75.000
|
$950.000
|
$1,250.000
|
$867.920
|
$1,020.000
|
$1,050.000
|
|
|
CONC BOX CULV (7 FT X 7 FT)(EXTEND)
|
LF
|
111.000
|
$1,400.000
|
$1,300.000
|
$1,113.760
|
$1,050.000
|
$1,200.000
|
|
|
CONC BOX CULV (8 FT X 5 FT)(EXTEND)
|
LF
|
72.000
|
$1,000.000
|
$1,350.000
|
$1,016.390
|
$1,280.000
|
$1,300.000
|
|
|
CONC BOX CULV (8 FT X 6 FT)(EXTEND)
|
LF
|
81.000
|
$863.000
|
$1,400.000
|
$936.380
|
$1,260.000
|
$1,440.000
|
|
|
CONC BOX CULV (8 FT X 3 FT)
|
LF
|
51.000
|
$856.000
|
$800.000
|
$681.900
|
$775.000
|
$800.000
|
|
|
RC PIPE (CL III)(18 IN)
|
LF
|
1,454.000
|
$90.000
|
$85.000
|
$108.950
|
$73.000
|
$82.000
|
|
|
RC PIPE (CL III)(24 IN)
|
LF
|
238.000
|
$115.000
|
$95.000
|
$119.410
|
$150.000
|
$106.000
|
|
|
INLET (COMPL)(PSL)(FG)(4FTX4FT-3FTX3FT)
|
EA
|
2.000
|
$7,900.000
|
$7,000.000
|
$4,486.910
|
$6,900.000
|
$6,007.000
|
|
|
INLET (COMPL)(PSL)(FG)(5FTX5FT-3FTX3FT)
|
EA
|
2.000
|
$9,600.000
|
$10,000.000
|
$7,197.110
|
$10,700.000
|
$6,500.000
|
|
|
WINGWALL (PW - 1) (HW=4 FT)
|
EA
|
4.000
|
$11,000.000
|
$10,000.000
|
$16,452.880
|
$10,000.000
|
$25,000.000
|
|
|
WINGWALL (PW - 1) (HW=5 FT)
|
EA
|
2.000
|
$27,500.000
|
$15,000.000
|
$16,230.720
|
$11,000.000
|
$27,000.000
|
|
|
WINGWALL (PW - 1) (HW=7 FT)
|
EA
|
3.000
|
$15,000.000
|
$30,000.000
|
$30,045.860
|
$13,700.000
|
$40,000.000
|
|
|
WINGWALL (PW - 1) (HW=9 FT)
|
EA
|
1.000
|
$20,000.000
|
$35,000.000
|
$29,526.450
|
$43,000.000
|
$35,000.000
|
|
|
SET (TY I)(S=3 FT)(HW=2FT)(6:1)(C)
|
EA
|
4.000
|
$13,000.000
|
$7,000.000
|
$12,667.940
|
$14,000.000
|
$12,000.000
|
|
|
SET (TY I)(S=3 FT)(HW=3FT)(3:1)(C)
|
EA
|
2.000
|
$8,500.000
|
$4,000.000
|
$7,560.350
|
$11,700.000
|
$23,000.000
|
|
|
SET (TY I)(S=3 FT)(HW=3FT)(4:1)(C)
|
EA
|
2.000
|
$8,800.000
|
$5,000.000
|
$8,222.960
|
$12,000.000
|
$27,000.000
|
|
|
SET (TY I)(S= 4 FT)(HW= 4 FT)(4:1) (C)
|
EA
|
2.000
|
$11,800.000
|
$6,000.000
|
$12,474.030
|
$13,500.000
|
$32,000.000
|
|
|
SET (TY I)(S= 4 FT)(HW= 4 FT)(6:1) (C)
|
EA
|
1.000
|
$16,000.000
|
$18,000.000
|
$21,080.140
|
$21,500.000
|
$42,000.000
|
|
|
SET (TY I)(S= 5 FT)(HW= 3 FT)(6:1) (C)
|
EA
|
6.000
|
$13,510.000
|
$6,000.000
|
$11,257.160
|
$7,300.000
|
$38,000.000
|
|
|
SET (TY I)(S= 6 FT)(HW= 6 FT)(4:1) (C)
|
EA
|
2.000
|
$21,500.000
|
$11,000.000
|
$12,968.310
|
$16,000.000
|
$40,000.000
|
|
|
SET (TY I)(S= 6 FT)(HW= 7 FT)(4:1) (C)
|
EA
|
6.000
|
$23,385.000
|
$14,000.000
|
$24,565.520
|
$12,000.000
|
$42,000.000
|
|
|
SET (TY I)(S= 6 FT)(HW= 8 FT)(4:1) (C)
|
EA
|
6.000
|
$27,500.000
|
$17,000.000
|
$22,883.530
|
$14,600.000
|
$44,000.000
|
|
|
SET (TY I)(S= 7 FT)(HW= 9 FT)(3:1) (C)
|
EA
|
6.000
|
$27,000.000
|
$16,500.000
|
$23,761.200
|
$14,000.000
|
$44,000.000
|
|
|
SET (TY I)(S= 8 FT)(HW= 4 FT)(4:1) (C)
|
EA
|
2.000
|
$18,500.000
|
$11,000.000
|
$20,753.680
|
$16,600.000
|
$40,000.000
|
|
|
SET (TY I)(S= 8 FT)(HW= 8 FT)(4:1) (C)
|
EA
|
6.000
|
$44,500.000
|
$22,000.000
|
$28,053.260
|
$18,900.000
|
$51,000.000
|
|
|
SET (TY II) (18 IN) (RCP) (6: 1) (P)
|
EA
|
98.000
|
$1,400.000
|
$1,100.000
|
$1,794.340
|
$1,100.000
|
$2,600.000
|
|
|
SET (TY II) (24 IN) (RCP) (6: 1) (P)
|
EA
|
15.000
|
$2,000.000
|
$1,400.000
|
$2,141.960
|
$2,700.000
|
$2,900.000
|
|
|
CLEAN EXIST CULVERTS
|
EA
|
5.000
|
$2,450.000
|
$3,500.000
|
$4,403.190
|
$4,700.000
|
$3,000.000
|
|
|
REMOV STR (SET)
|
EA
|
34.000
|
$605.000
|
$500.000
|
$556.520
|
$625.000
|
$1,300.000
|
|
|
REMOV STR (WINGWALL)
|
EA
|
2.000
|
$2,100.000
|
$3,500.000
|
$1,586.660
|
$1,650.000
|
$5,000.000
|
|
|
REMOV STR (PIPE)
|
LF
|
2,542.000
|
$17.000
|
$14.000
|
$13.350
|
$38.000
|
$40.000
|
|
|
REMOV STR (BOX CULVERT)
|
LF
|
167.000
|
$165.000
|
$75.000
|
$39.470
|
$82.000
|
$350.000
|
|
|
REMOV STR (BRIDGE 100 - 499 FT LENGTH)
|
EA
|
2.000
|
$69,500.000
|
$73,000.000
|
$49,999.500
|
$95,000.000
|
$90,000.000
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$3,200,000.000
|
$2,900,000.000
|
$3,320,454.000
|
$3,350,000.000
|
$4,800,000.000
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
34.000
|
$9,700.000
|
$5,500.000
|
$8,484.050
|
$12,400.000
|
$24,000.000
|
|
|
ROCK FILTER DAMS (INSTALL) (TY 2)
|
LF
|
2,475.000
|
$41.000
|
$45.000
|
$38.750
|
$40.000
|
$50.000
|
|
|
ROCK FILTER DAMS (REMOVE)
|
LF
|
2,475.000
|
$12.000
|
$5.000
|
$9.600
|
$12.000
|
$40.000
|
|
|
CONSTRUCTION EXITS (INSTALL) (TY 1)
|
SY
|
666.000
|
$33.000
|
$40.000
|
$32.330
|
$17.000
|
$40.000
|
|
|
CONSTRUCTION EXITS (REMOVE)
|
SY
|
666.000
|
$12.000
|
$5.000
|
$14.000
|
$5.000
|
$30.000
|
|
|
TEMP SEDMT CONT FENCE (INSTALL)
|
LF
|
13,706.000
|
$4.000
|
$4.000
|
$4.390
|
$7.000
|
$5.000
|
|
|
TEMP SEDMT CONT FENCE (REMOVE)
|
LF
|
13,706.000
|
$1.000
|
$0.500
|
$1.000
|
$1.350
|
$2.000
|
|
|
CONSTRUCTING DETOURS
|
SY
|
1,029.000
|
$90.000
|
$150.000
|
$122.950
|
$140.000
|
$140.000
|
|
|
PORT CTB (FUR & INST)(SGL SLOPE)(TY 1)
|
LF
|
4,560.000
|
$76.000
|
$50.000
|
$79.520
|
$71.000
|
$100.000
|
|
|
PORT CTB (DES SOURCE)(F-SHAPE)(TY 1)
|
LF
|
360.000
|
$19.000
|
$20.000
|
$14.210
|
$36.000
|
$21.000
|
|
|
PORT CTB (MOVE)(SGL SLP)(TY 1)
|
LF
|
5,280.000
|
$22.000
|
$10.000
|
$8.620
|
$14.000
|
$18.000
|
|
|
PORT CTB (MOVE)(F-SHAPE)(TY 1)
|
LF
|
1,950.000
|
$10.000
|
$15.000
|
$25.570
|
$21.000
|
$17.000
|
|
|
PORT CTB (STKPL)(SGL SLP)(TY 1)
|
LF
|
60.000
|
$28.000
|
$25.000
|
$26.160
|
$25.000
|
$27.000
|
|
|
PORT CTB (STKPL)(F-SHAPE)(TY 1)
|
LF
|
360.000
|
$16.500
|
$20.000
|
$20.300
|
$22.000
|
$25.000
|
|
|
PORT CTB (REMOVE)(SGL SLP)(TY 1)
|
LF
|
4,560.000
|
$17.000
|
$10.000
|
$9.170
|
$16.000
|
$25.000
|
|
|
INTERSECTIONS (ACP)
|
SY
|
1,776.000
|
$55.200
|
$30.000
|
$85.190
|
$38.000
|
$190.000
|
|
|
DRIVEWAYS (ACP)
|
SY
|
4,464.000
|
$64.000
|
$30.000
|
$77.350
|
$47.000
|
$200.000
|
|
|
TURNOUTS (ACP)
|
SY
|
593.000
|
$85.000
|
$30.000
|
$97.530
|
$60.000
|
$210.000
|
|
|
DRIVEWAYS (CONC) (HES)
|
SY
|
201.000
|
$135.000
|
$125.000
|
$126.010
|
$250.000
|
$200.000
|
|
|
RUMBLE STRIPS (SHOULDER)
|
LF
|
54,551.000
|
$0.180
|
$0.250
|
$0.120
|
$0.280
|
$0.300
|
|
|
RUMBLE STRIPS (CENTERLINE)
|
LF
|
21,445.000
|
$0.200
|
$0.250
|
$0.210
|
$0.300
|
$0.300
|
|
|
MTL W-BEAM GD FEN (STEEL POST)
|
LF
|
3,150.000
|
$35.000
|
$40.000
|
$32.750
|
$33.000
|
$31.000
|
|
|
MTL BEAM GD FEN TRANS (THRIE-BEAM)
|
EA
|
18.000
|
$2,300.000
|
$3,000.000
|
$2,660.410
|
$2,750.000
|
$2,800.000
|
|
|
SHORT RADIUS
|
LF
|
57.000
|
$46.000
|
$50.000
|
$37.900
|
$50.000
|
$50.000
|
|
|
REMOVE METAL BEAM GUARD FENCE
|
LF
|
1,350.000
|
$3.150
|
$7.000
|
$6.000
|
$2.750
|
$4.000
|
|
|
RM MTL BM GD FENCE TRANS (THRIE-BEAM)
|
EA
|
4.000
|
$250.000
|
$350.000
|
$310.520
|
$300.000
|
$300.000
|
|
|
GUARDRAIL END TREATMENT (INSTALL)
|
EA
|
30.000
|
$3,350.000
|
$4,000.000
|
$3,507.170
|
$3,150.000
|
$3,400.000
|
|
|
GUARDRAIL END TREATMENT (REMOVE)
|
EA
|
20.000
|
$300.000
|
$500.000
|
$415.520
|
$300.000
|
$350.000
|
|
|
CRASH CUSH ATTEN (MOVE & RESET)
|
EA
|
12.000
|
$2,000.000
|
$3,500.000
|
$3,177.480
|
$3,000.000
|
$1,200.000
|
|
|
CRASH CUSH ATTEN (REMOVE)
|
EA
|
8.000
|
$1,000.000
|
$2,500.000
|
$2,073.850
|
$1,500.000
|
$1,000.000
|
|
|
CRASH CUSH ATTEN (INSTL)(L)(N)(TL3)
|
EA
|
6.000
|
$31,600.000
|
$35,000.000
|
$28,674.980
|
$29,000.000
|
$30,000.000
|
|
|
CRASH CUSH ATTEN (INSTL)(S)(N)(TL3)
|
EA
|
2.000
|
$9,320.000
|
$12,000.000
|
$10,058.100
|
$9,900.000
|
$9,000.000
|
|
|
MAILBOX INSTALL-S (TWG-POST) TY 1
|
EA
|
38.000
|
$360.000
|
$350.000
|
$300.000
|
$330.000
|
$350.000
|
|
|
MAILBOX INSTALL-D (TWG-POST) TY 1
|
EA
|
5.000
|
$335.000
|
$400.000
|
$350.000
|
$390.000
|
$400.000
|
|
|
MAILBOX INSTALL-M (TWG-POST) TY 1
|
EA
|
2.000
|
$600.000
|
$600.000
|
$500.000
|
$550.000
|
$600.000
|
|
|
ALUMINUM SIGNS (TY G)
|
SF
|
659.000
|
$31.000
|
$45.000
|
$39.000
|
$43.000
|
$40.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
|
EA
|
79.000
|
$904.780
|
$650.000
|
$575.000
|
$640.000
|
$800.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(P-BM)
|
EA
|
4.000
|
$919.730
|
$800.000
|
$750.000
|
$835.000
|
$825.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
|
EA
|
24.000
|
$971.250
|
$750.000
|
$700.000
|
$780.000
|
$950.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(U)
|
EA
|
1.000
|
$971.620
|
$900.000
|
$800.000
|
$890.000
|
$1,000.000
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(U)
|
EA
|
7.000
|
$1,362.500
|
$1,000.000
|
$900.000
|
$1,000.000
|
$1,400.000
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(U-BM)
|
EA
|
2.000
|
$1,000.000
|
$1,100.000
|
$950.000
|
$1,050.000
|
$1,500.000
|
|
|
IN BRIDGE MNT CLEARANCE SGN ASSM(TY N)
|
EA
|
2.000
|
$2,500.000
|
$3,500.000
|
$2,350.000
|
$3,500.000
|
$5,000.000
|
|
|
RELOCATE SM RD SN SUP & AM TY TEMP
|
EA
|
63.000
|
$361.250
|
$500.000
|
$325.000
|
$210.000
|
$220.000
|
|
|
INSTALL LRSS (STRUCT STEEL)
|
LB
|
3,890.000
|
$9.000
|
$10.000
|
$8.000
|
$9.000
|
$12.000
|
|
|
REMOVE LRSA
|
EA
|
4.000
|
$1,200.000
|
$1,000.000
|
$800.000
|
$900.000
|
$1,100.000
|
|
|
INSTL DEL ASSM (D-SW)SZ (BRF)CTB
|
EA
|
8.000
|
$26.000
|
$30.000
|
$20.000
|
$45.000
|
$65.000
|
|
|
INSTL DEL ASSM (D-SY)SZ (BRF)CTB
|
EA
|
8.000
|
$25.000
|
$30.000
|
$20.000
|
$45.000
|
$65.000
|
|
|
INSTL OM ASSM (OM-2X)(WC)GND
|
EA
|
40.000
|
$85.000
|
$70.000
|
$60.000
|
$66.000
|
$190.000
|
|
|
REMOVE DELIN & OBJECT MARKER ASSMS
|
EA
|
57.000
|
$25.000
|
$25.000
|
$15.000
|
$45.000
|
$35.000
|
|
|
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI)
|
EA
|
42.000
|
$54.290
|
$50.000
|
$45.000
|
$56.000
|
$50.000
|
|
|
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BR)
|
EA
|
17.000
|
$36.000
|
$50.000
|
$45.000
|
$56.000
|
$50.000
|
|
|
INSTL DEL ASSM (D-SW)SZ 1(WFLX)GND(BR)
|
EA
|
63.000
|
$58.000
|
$85.000
|
$75.000
|
$85.000
|
$50.000
|
|
|
INSTL OM ASSM (OM-2Z)(WFLX)GND(BI)
|
EA
|
6.000
|
$105.000
|
$85.000
|
$75.000
|
$85.000
|
$145.000
|
|
|
WK ZN PAV MRK NON-REMOV (W)6"(SLD)
|
LF
|
48,446.000
|
$0.480
|
$0.500
|
$0.350
|
$0.480
|
$0.500
|
|
|
WK ZN PAV MRK NON-REMOV (W)12"(SLD)
|
LF
|
96.000
|
$2.250
|
$4.000
|
$2.000
|
$5.560
|
$2.000
|
|
|
WK ZN PAV MRK NON-REMOV (Y)6"(SLD)
|
LF
|
96,892.000
|
$0.500
|
$0.500
|
$0.350
|
$0.480
|
$0.500
|
|
|
WK ZN PAV MRK REMOV (W)6"(BRK)
|
LF
|
7,662.000
|
$2.000
|
$1.200
|
$1.060
|
$1.670
|
$2.000
|
|
|
WK ZN PAV MRK REMOV (W)6"(SLD)
|
LF
|
44,344.000
|
$1.400
|
$1.000
|
$0.770
|
$1.340
|
$1.200
|
|
|
WK ZN PAV MRK REMOV (W)24"(SLD)
|
LF
|
304.000
|
$15.000
|
$15.000
|
$12.000
|
$11.110
|
$11.000
|
|
|
WK ZN PAV MRK REMOV (Y)6"(SLD)
|
LF
|
39,128.000
|
$1.900
|
$1.000
|
$0.770
|
$1.340
|
$1.300
|
|
WK ZN PAV MRK SHT TERM (TAB)TY W
|
EA
|
2,664.000
|
$1.500
|
$1.500
|
$2.140
|
$1.500
|
$1.200
|
|
WK ZN PAV MRK SHT TERM (TAB)TY Y-2
|
EA
|
5,328.000
|
$1.500
|
$1.500
|
$4.410
|
$1.500
|
$1.200
|
|
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
|
LF
|
2,826.000
|
$1.500
|
$1.200
|
$0.900
|
$1.560
|
$1.500
|
|
REFL PAV MRK TY I (W)12"(SLD)(100MIL)
|
LF
|
843.000
|
$4.000
|
$5.000
|
$3.500
|
$5.890
|
$6.000
|
|
REFL PAV MRK TY I (W)24"(SLD)(100MIL)
|
LF
|
385.000
|
$16.530
|
$10.000
|
$7.000
|
$13.890
|
$12.000
|
|
|
PAVEMENT SEALER 6"
|
LF
|
4,725.000
|
$0.810
|
$0.300
|
$0.200
|
$0.500
|
$0.240
|
|
RE PM W/RET REQ TY I (W)6"(BRK)(100MIL)
|
LF
|
2,100.000
|
$0.900
|
$0.750
|
$0.610
|
$1.280
|
$1.200
|
|
RE PM W/RET REQ TY I (W)6"(SLD)(100MIL)
|
LF
|
64,971.000
|
$0.710
|
$0.750
|
$0.550
|
$0.880
|
$1.000
|
|
RE PM W/RET REQ TY I (Y)6"(BRK)(100MIL)
|
LF
|
2,695.000
|
$0.740
|
$0.750
|
$0.570
|
$1.280
|
$1.200
|
|
RE PM W/RET REQ TY I (Y)6"(SLD)(100MIL)
|
LF
|
48,001.000
|
$0.710
|
$0.750
|
$0.570
|
$0.880
|
$1.000
|
|
PREFAB PAV MRK TY C (W) (ARROW)
|
EA
|
6.000
|
$279.000
|
$325.000
|
$275.000
|
$300.000
|
$235.000
|
|
PREFAB PAV MRK TY C (W) (WORD)
|
EA
|
6.000
|
$330.000
|
$400.000
|
$350.000
|
$375.000
|
$300.000
|
|
PREFAB PAV MRK TY C (W) (36")(YLD TRI)
|
EA
|
13.000
|
$60.000
|
$75.000
|
$50.000
|
$70.000
|
$34.000
|
|
REFL PAV MRKR TY I-C
|
EA
|
210.000
|
$6.500
|
$5.000
|
$4.750
|
$8.000
|
$6.500
|
|
REFL PAV MRKR TY II-A-A
|
EA
|
597.000
|
$12.040
|
$5.000
|
$4.750
|
$8.000
|
$6.500
|
|
REFL PAV MRKR TY II-C-R
|
EA
|
121.000
|
$11.500
|
$5.000
|
$4.750
|
$11.000
|
$6.000
|
|
|
ELIM EXT PAV MRK & MRKS (4")
|
LF
|
83,472.000
|
$1.000
|
$0.400
|
$0.290
|
$0.670
|
$0.500
|
|
|
ELIM EXT PAV MRK & MRKS (6")
|
LF
|
145,338.000
|
$0.700
|
$0.500
|
$0.360
|
$0.700
|
$0.500
|
|
|
ELIM EXT PAV MRK & MRKS (12")
|
LF
|
96.000
|
$2.000
|
$2.000
|
$0.700
|
$2.220
|
$1.400
|
|
|
ELIM EXT PAV MRK & MRKS (24")
|
LF
|
232.000
|
$9.000
|
$3.000
|
$1.600
|
$4.440
|
$2.600
|
|
|
PAV SURF PREP FOR MRK (6")
|
LF
|
4,725.000
|
$0.450
|
$0.250
|
$0.200
|
$0.440
|
$0.200
|
|
|
TEMP TRAF SIGNALS
|
EA
|
6.000
|
$30,000.000
|
$10,000.000
|
$4,000.000
|
$20,000.000
|
$145,000.000
|
|
|
D-GR HMA TY-B PG64-22
|
TON
|
12,205.000
|
$106.000
|
$90.000
|
$115.500
|
$103.000
|
$120.000
|
|
|
SP MIXES SP-C SAC-B PG70-22
|
TON
|
13,368.000
|
$140.000
|
$95.000
|
$130.500
|
$116.000
|
$180.000
|
|
|
SP MIXES SP-C SAC-A PG76-22
|
TON
|
7,136.000
|
$126.000
|
$110.000
|
$154.000
|
$128.000
|
$240.000
|
|
|
TACK COAT
|
GAL
|
5,622.000
|
$4.600
|
$4.000
|
$3.050
|
$0.010
|
$8.000
|
|
|
UNDERSEAL COURSE
|
GAL
|
23,371.000
|
$4.600
|
$2.000
|
$4.950
|
$0.010
|
$6.000
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
DAY
|
36.000
|
$100.000
|
$150.000
|
$220.530
|
$150.000
|
$150.000
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
EA
|
4.000
|
$10,800.000
|
$12,000.000
|
$16,293.760
|
$20,000.000
|
$18,500.000
|
|
|
TMA (STATIONARY)
|
DAY
|
174.000
|
$200.000
|
$400.000
|
$390.630
|
$100.000
|
$220.000
|
|
|
TMA (MOBILE OPERATION)
|
HR
|
1,248.000
|
$75.000
|
$75.000
|
$109.450
|
$5.000
|
$97.000
|
|
Totals: |
$33,843,949.950
|
$29,287,262.600
|
$34,266,346.719
|
$34,494,324.600
|
$48,645,201.391
|