Show Job Controls
Bid Cobra

MCLENNAN US 84 (0055-15-067)

Items: 36

County: MCLENNAN
Length: N/A
Highway: US 84
District: WACO
Control Number: 0055-15-067
DBE Goal: N/A
Project: F 2022(427)
Guaranty: N/A
Time: 105 WORKING DAYS
Engineer's Estimate: $1,625,086.72
Date: 03/04/2022 (4 years ago)
Contract Number: N/A
Type: CAM AND TOM OVERLAY
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice HCS Excel Tabs Print Print Notice
Documents:
Bidders (3)
E
Engineer's Estimate
$1,625,086.72
$2,174,993.18
Over/Under Est: 33.84% $549,906.46
Over/Under Est: 50.66% $823,229.28
Amt Left: 12.57% $273,322.82
Over/Under Est: 62.91% $1,022,275.90
Amt Left: 21.72% $472,369.44
Delta: -8.13% -$199,046.62

Bid Items & Bid Tabulations

36 Total 0 of 36
MCLENNAN  |  US 84  |  WACO  |  0055-15-067  |  03/04/2022  |  $1,625,086.72  |  F 2022(427)  |  CAM AND TOM OVERLAY  |  105 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
KNIFE RIVER CORPORATION - SOUTH
BIG CREEK CONSTRUCTION, LTD.
TEXAS MATERIALS GROUP, INC.
ROLL SODDING
SY 1,097.000 $5.500 $4.900 $6.000 $11.000
VEGETATIVE WATERING
MG 10.000 $60.000 $0.100 $125.000 $115.000
TOM-C (AGGREGATE) SAC-A
TON 2,622.000 $117.000 $134.400 $160.000 $220.000
TOM (ASPHALT) PG 70-22
TON 192.000 $150.000 $134.400 $160.000 $220.000
TACK COAT
GAL 10,231.000 $2.700 $3.350 $2.500 $0.010
FLEXIBLE PAVEMENT STRUCTURE REPAIR(8")
SY 200.000 $50.000 $110.000 $100.000 $85.000
PLANE ASPH CONC PAV(0" TO 2")
SY 8,583.000 $2.500 $3.950 $5.000 $3.000
PLANE CONC PAV(0" TO 2")
SY 2,003.000 $2.500 $12.400 $15.000 $8.500
PAV JT UNDERSEAL (24")
LF 4,671.000 $35.000 $10.350 $22.000 $8.500
FULL - DEPTH REPAIR CRCP (9")
SY 921.000 $225.000 $508.750 $450.000 $468.000
CONC STR REPAIR (STANDARD)
SF 1,543.000 $60.000 $140.250 $170.000 $129.000
CLEANING AND SEALING EXIST JOINTS(CL3)
LF 4,671.000 $25.000 $20.100 $17.000 $16.000
ADJUSTING MANHOLES
EA 8.000 $747.000 $2,500.000 $4,000.000 $2,600.000
ADJUSTING MANHOLES (WATER VALVE BOX)
EA 1.000 $618.000 $2,350.000 $2,000.000 $1,600.000
MOBILIZATION
LS 1.000 $135,657.000 $216,983.000 $240,000.000 $261,300.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 7.000 $6,623.000 $6,820.000 $15,000.000 $30,000.000
CURB RAMPS (TY 21)
EA 4.000 $2,200.000 $2,500.000 $5,000.000 $3,500.000
INSTL DEL ASSM (D-DY)SZ 1(YFLX)GND
EA 17.000 $60.000 $125.000 $200.000 $115.000
WK ZN PAV MRK SHT TERM (TAB)TY W
EA 3,652.000 $1.000 $1.250 $1.250 $1.360
REFL PAV MRK TY I (W)8"(DOT)(100MIL)
LF 177.000 $1.400 $1.100 $2.000 $2.250
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
LF 4,093.000 $0.750 $0.900 $1.000 $1.650
REFL PAV MRK TY I (W)24"(SLD)(100MIL)
LF 1,506.000 $4.900 $7.600 $6.000 $8.000
RE PM W/RET REQ TY I (W)4"(BRK)(100MIL)
LF 4,640.000 $0.320 $0.730 $1.000 $0.900
RE PM W/RET REQ TY I (W)4"(SLD)(100MIL)
LF 2,451.000 $0.280 $0.730 $1.000 $0.640
PREFAB PAV MRK TY C (W) (ARROW)
EA 8.000 $210.130 $272.000 $250.000 $250.000
PREFAB PAV MRK TY C (W) (WORD)
EA 8.000 $295.080 $272.000 $250.000 $330.000
PREFAB PAV MRK TY C (W) (36")(YLD TRI)
EA 20.000 $55.000 $68.500 $50.000 $50.000
REFL PAV MRKR TY I-C
EA 84.000 $3.780 $10.900 $5.000 $6.000
REFL PAV MRKR TY II-C-R
EA 372.000 $3.610 $6.500 $5.000 $7.000
CAM (ASPHALT) PG(70-22)
TON 212.000 $134.000 $135.650 $175.000 $206.000
CAM (AGGREGATE)
TON 2,602.000 $127.000 $135.650 $175.000 $206.000
BONDING COURSE
GAL 10,231.000 $3.250 $2.800 $3.500 $3.750
PORTABLE CHANGEABLE MESSAGE SIGN
EA 2.000 $5,543.310 $17,500.000 $10,000.000 $6,200.000
TMA (STATIONARY)
DAY 85.000 $80.000 $570.000 $250.000 $280.000
TMA (MOBILE OPERATION)
HR 150.000 $42.120 $89.000 $20.000 $25.000
CURB INLET SEDIMENT PROTECTION
LF 218.000 $3.000 $40.000 $25.000 $20.000
Totals: $1,625,086.720 $2,174,993.180 $2,448,316.000 $2,647,362.620