Show Job Controls
Bid Cobra

MCCULLOCH SH 71 (2561-01-011)

Items: 79

County: MCCULLOCH
Length: N/A
Highway: SH 71
District: BROWNWOOD
Control Number: 2561-01-011
DBE Goal: N/A
Project: C 2561-1-11
Guaranty: N/A
Time: 204 WORKING DAYS
Engineer's Estimate: $2,691,320.25
Date: 05/01/2018 (8 years ago)
Contract Number: N/A
Type: REHAB EXISTING ROADWAY
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice HCS Excel Tabs Print Print Notice
Pay Estimates:
Bidders (5)
E
Engineer's Estimate
$2,691,320.25
$2,449,573.59
Over/Under Est: -8.98% -$241,746.66
Over/Under Est: -3.88% -$104,302.70
Amt Left: 5.61% $137,443.96
Over/Under Est: 18.95% $510,072.41
Amt Left: 30.69% $751,819.07
Delta: -23.75% -$614,375.11
$3,235,536.73
Over/Under Est: 20.22% $544,216.48
Amt Left: 32.09% $785,963.14
Delta: -1.07% -$34,144.07
$3,974,338.50
Over/Under Est: 47.67% $1,283,018.25
Amt Left: 62.25% $1,524,764.91
Delta: -22.83% -$738,801.77

Bid Items & Bid Tabulations

79 Total 0 of 79
MCCULLOCH  |  SH 71  |  BROWNWOOD  |  2561-01-011  |  05/01/2018  |  $2,691,320.25  |  C 2561-1-11  |  REHAB EXIST ROADWAY  |  204 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
ALLEN KELLER COMPANY
BIG CREEK CONSTRUCTION, LTD.
PRATER EQUIPMENT CO., INC.
RAY FARIS, INC.
FNH CONSTRUCTION, LLC
PREPARING ROW
STA 2.000 $4,000.000 $10,000.000 $4,950.000 $12,000.000 $22,320.000 $50,000.000
EXCAVATION (ROADWAY)
CY 9,534.000 $15.000 $15.850 $15.000 $20.000 $21.240 $20.000
EXCAVATION (SPECIAL)
CY 934.000 $25.000 $39.000 $25.000 $32.000 $32.480 $20.000
EMBANKMENT (FINAL)(DENS CONT)(TY C)
CY 5,573.000 $10.000 $6.500 $15.000 $10.000 $18.920 $30.000
BROADCAST SEED (PERM) (RURAL) (CLAY)
AC 3.800 $900.000 $830.000 $500.000 $975.000 $828.000 $3,000.000
BROADCAST SEED (TEMP) (WARM)
AC 2.700 $600.000 $445.000 $500.000 $925.000 $445.000 $3,000.000
BROADCAST SEED (TEMP) (COOL)
AC 2.700 $600.000 $445.000 $500.000 $975.000 $445.000 $3,000.000
VEGETATIVE WATERING
MG 1,000.000 $11.000 $5.250 $15.000 $10.000 $23.600 $55.000
SOIL RETENTION BLANKETS (CL 1) (TY C)
SY 2,165.000 $2.250 $1.050 $1.000 $1.400 $1.050 $6.500
PROOF ROLLING
HR 28.000 $100.000 $128.000 $65.000 $60.000 $58.000 $150.000
FL BS (CMP IN PLC)(TYD GR1-2)(FNAL POS)
CY 17,643.000 $38.000 $37.600 $48.000 $51.000 $55.580 $55.000
RWRK BS MTL(TY B)(8")(DEN CNT)(ORG POS)
CY 2,934.000 $17.000 $16.000 $20.000 $20.000 $5.800 $10.000
PRIME COAT (RC-250)
GAL 12,441.000 $5.000 $4.300 $3.500 $5.500 $4.160 $8.000
ASPH (CRS-1P)
GAL 12,441.000 $4.000 $3.500 $3.500 $5.500 $3.930 $8.000
ASPH (CRS-2P)
GAL 12,441.000 $4.100 $3.700 $3.500 $5.500 $3.930 $8.000
AGGR(TY-B GR-3 SAC-B)
CY 665.000 $130.000 $60.000 $100.000 $102.000 $75.840 $200.000
AGGR(TY-B GR-5 SAC-B)
CY 453.000 $140.000 $84.500 $95.000 $136.000 $71.800 $200.000
AGGR(TY-PB GR-4 SAC-B)
CY 462.000 $135.000 $120.000 $135.000 $119.760 $95.160 $200.000
ASPH (AC-20-5TR OR AC-20XP)
GAL 18,817.000 $5.000 $3.500 $2.750 $4.500 $3.730 $8.000
CL C CONC (CULV)
CY 168.200 $1,350.000 $1,300.000 $1,100.000 $1,500.000 $1,550.000 $1,500.000
RIPRAP (CONC)(4 IN)
CY 0.800 $650.000 $1,600.000 $1,500.000 $700.000 $1,000.000 $650.000
RIPRAP (CONC)(5 IN)
CY 62.500 $650.000 $550.000 $450.000 $700.000 $650.000 $650.000
CMP AR (GAL STL DES 3)
LF 116.000 $175.000 $90.000 $60.000 $95.000 $80.000 $85.000
SET (TY II) (DES 3) (CMP) (6: 1) (P)
EA 8.000 $2,600.000 $1,400.000 $1,550.000 $1,200.000 $1,000.000 $1,500.000
REMOV STR (PIPE)
EA 4.000 $1,250.000 $800.000 $500.000 $900.000 $750.000 $500.000
MOBILIZATION
LS 1.000 $225,000.000 $200,000.000 $185,000.000 $275,000.000 $355,924.710 $390,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 12.000 $4,500.000 $8,000.000 $2,250.000 $4,000.000 $4,092.000 $8,500.000
ROCK FILTER DAMS (INSTALL) (TY 1)
LF 100.000 $30.000 $29.300 $40.000 $40.000 $45.000 $35.000
ROCK FILTER DAMS (REMOVE)
LF 100.000 $15.000 $8.200 $25.000 $30.000 $12.000 $15.000
SANDBAGS FOR EROSION CONTROL (12")
LF 30.000 $50.000 $10.000 $30.000 $50.000 $18.000 $10.000
BIODEG EROSN CONT LOGS (INSTL) (12")
LF 1,880.000 $5.000 $4.900 $5.000 $5.500 $2.350 $18.000
BIODEG EROSN CONT LOGS (REMOVE)
LF 1,880.000 $1.000 $1.500 $1.000 $3.000 $0.500 $12.000
PORT CTB (DES SOURCE)(F-SHAPE)(TY 1)
LF 1,020.000 $30.000 $14.000 $15.000 $33.000 $27.500 $25.000
PORT CTB (STKPL)(F-SHAPE)(TY 1)
LF 1,020.000 $30.000 $14.000 $15.000 $33.000 $27.500 $20.000
INTERSECTIONS (ACP)
SY 2,991.000 $45.000 $50.000 $50.000 $73.000 $71.840 $42.000
DRIVEWAYS (SURF TREAT)
SY 439.000 $45.000 $50.000 $65.000 $60.000 $20.920 $42.000
MTL W-BEAM GD FEN (TIM POST)
LF 1,100.000 $25.000 $22.000 $20.000 $30.000 $26.000 $25.000
MTL W-BEAM GD FEN (STEEL POST)
LF 250.000 $25.000 $40.000 $25.000 $50.000 $44.000 $35.000
MTL BM GD FEN (LONG SPAN SYSTEM)
LF 100.000 $25.000 $23.000 $35.000 $30.000 $26.500 $35.000
REMOVE METAL BEAM GUARD FENCE
LF 2,100.000 $2.750 $2.500 $3.000 $4.000 $3.000 $3.000
GUARDRAIL END TREATMENT (INSTALL)
EA 12.000 $2,850.000 $2,480.000 $2,400.000 $3,300.000 $2,900.000 $2,850.000
CRASH CUSH ATTEN (REMOVE)
EA 6.000 $1,000.000 $750.000 $1,000.000 $1,500.000 $1,250.000 $2,500.000
CRASH CUSH ATTEN (INSTL)(S)(N)(TL3)
EA 6.000 $12,500.000 $7,500.000 $10,000.000 $9,000.000 $8,000.000 $13,500.000
PIPE UNDERDRAINS (TY 7) (6")
LF 1,000.000 $40.000 $25.000 $25.000 $33.000 $30.000 $30.000
CONDT (PVC) (SCH 80) (2")
LF 20.000 $32.000 $25.250 $28.000 $30.000 $25.000 $15.000
ELEC CONDR (NO.8) BARE
LF 80.000 $1.500 $2.000 $2.500 $3.000 $2.000 $3.000
ELEC CONDR (NO.8) INSULATED
LF 160.000 $2.000 $1.500 $2.000 $2.000 $1.500 $3.000
GROUND BOX TY A (122311)W/APRON
EA 1.000 $1,000.000 $2,000.000 $2,200.000 $2,500.000 $2,000.000 $1,000.000
REMOVE GROUND BOX
EA 4.000 $200.000 $350.000 $400.000 $400.000 $350.000 $500.000
REMOVE ELECTRICAL SERVICES
EA 1.000 $1,100.000 $500.000 $550.000 $750.000 $500.000 $2,500.000
ELC SRV TY D 120/240 070(NS)AL(E)SP(O)
EA 1.000 $6,500.000 $7,000.000 $7,500.000 $7,800.000 $6,900.000 $5,000.000
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
EA 1.000 $850.000 $540.000 $550.000 $950.000 $810.000 $650.000
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
EA 2.000 $850.000 $655.000 $700.000 $1,100.000 $875.000 $650.000
IN SM RD SN SUP&AM TY10BWG(1)SA(U)
EA 1.000 $850.000 $790.000 $800.000 $1,200.000 $975.000 $650.000
IN SM RD SN SUP&AM TYTWT(1)WS(P)
EA 3.000 $500.000 $280.000 $300.000 $850.000 $700.000 $650.000
IN SM RD SN SUP&AM TYTWT(1)WS(T)
EA 7.000 $500.000 $365.000 $400.000 $950.000 $800.000 $650.000
REMOVE SM RD SN SUP&AM
EA 13.000 $300.000 $96.000 $100.000 $125.000 $100.000 $450.000
INSTL DEL ASSM (D-SW)SZ (BRF)CTB (BI)
EA 22.000 $30.000 $22.300 $50.000 $30.000 $20.000 $100.000
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI)
EA 38.000 $40.000 $28.350 $50.000 $50.000 $40.000 $100.000
WK ZN PAV MRK NON-REMOV (W)4"(SLD)
LF 18,056.000 $0.500 $0.180 $0.250 $0.180 $0.180 $1.000
WK ZN PAV MRK NON-REMOV (Y)4"(SLD)
LF 18,138.000 $0.500 $0.320 $0.350 $0.320 $0.320 $1.000
WK ZN PAV MRK REMOV (W)4"(SLD)
LF 27,633.000 $0.700 $0.480 $0.500 $0.480 $0.480 $1.000
WK ZN PAV MRK REMOV (Y)4"(SLD)
LF 31,870.000 $0.600 $0.480 $0.500 $0.480 $0.480 $1.000
WK ZN PAV MRK SHT TERM (TAB)TY Y-2
EA 1,142.000 $1.500 $1.500 $1.000 $2.000 $1.350 $5.000
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
LF 885.000 $1.500 $1.000 $2.000 $1.000 $1.000 $6.000
REFL PAV MRK TY I (W)24"(SLD)(100MIL)
LF 44.000 $8.500 $14.000 $15.000 $14.000 $14.000 $20.000
REF PAV MRK TY I(W)36"(YLD TRI)(100MIL)
EA 6.000 $32.000 $30.000 $33.000 $30.000 $30.000 $550.000
RE PM W/RET REQ TY I (W)4"(BRK)(100MIL)
LF 450.000 $0.600 $0.750 $1.000 $0.750 $0.750 $1.000
RE PM W/RET REQ TY I (W)4"(SLD)(100MIL)
LF 22,774.000 $0.600 $0.340 $0.500 $0.340 $0.340 $1.000
RE PM W/RET REQ TY I (Y)4"(BRK)(100MIL)
LF 838.000 $0.800 $0.600 $0.750 $0.600 $0.600 $1.000
RE PM W/RET REQ TY I (Y)4"(SLD)(100MIL)
LF 23,050.000 $0.600 $0.350 $0.500 $0.350 $0.350 $1.000
REFL PAV MRKR TY I-C
EA 24.000 $4.000 $4.300 $5.000 $4.300 $4.300 $15.000
REFL PAV MRKR TY II-A-A
EA 639.000 $3.500 $4.300 $5.000 $4.300 $4.300 $15.000
ELIM EXT PAV MRK & MRKS (4")
LF 2,313.000 $1.000 $1.400 $1.000 $2.000 $0.760 $1.000
TRF SIG CBL (TY A)(12 AWG)(4 CONDR)
LF 754.000 $1.500 $3.000 $3.500 $3.500 $3.000 $3.500
REMOVE RDSD FLASH BEACON ASSEMBLY
EA 1.000 $475.000 $2,100.000 $550.000 $750.000 $500.000 $3,500.000
INSTL RDSD FLSH BCN ASSM (SOLAR PWRD)
EA 1.000 $10,500.000 $16,000.000 $16,500.000 $17,500.000 $15,000.000 $9,000.000
TMA (STATIONARY)
DAY 428.000 $200.000 $150.000 $195.000 $300.000 $400.000 $250.000
TMA (MOBILE OPERATION)
HR 200.000 $35.000 $150.000 $50.000 $125.000 $50.000 $200.000
Totals: $2,691,320.250 $2,449,573.590 $2,587,017.550 $3,201,392.660 $3,235,536.730 $3,974,338.500