MCCULLOCH US 190 (0128-04-038)

Items: 146

County: MCCULLOCH
Length: N/A
Highway: US 190
District: BROWNWOOD
Control Number: 0128-04-038
DBE Goal: N/A
Project: NH 2019(433)
Guaranty: N/A
Time: 378 WORKING DAYS
Engineer's Estimate: $6,691,606.25
Date: 01/09/2019 (7 years ago)
Contract Number: N/A
Type: RECONSTRUCT ROADWAY
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice HCS Excel Tabs Print Print Notice
Bidders (1)
E
Engineer's Estimate
$6,691,606.25
Over/Under Est: 28.37% $1,898,197.62

Bid Items & Bid Tabulations

146 Total 0 of 146
MCCULLOCH  |  US 190  |  BROWNWOOD  |  0128-04-038  |  01/09/2019  |  $6,691,606.25  |  NH 2019(433)  |  RECON ROADWAY  |  378 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
BIG CREEK CONSTRUCTION, LTD.
REMOVING CONC (PAV)
SY 15,635.000 $20.000 $25.000
REMOVING CONC (DRIVEWAYS)
SY 56.000 $17.000 $50.000
REMOVING CONC (MISC)
SY 621.000 $25.000 $50.000
REMOVING CONC (CURB OR CURB & GUTTER)
LF 1,907.000 $12.000 $10.000
REMOVING CONC (SIDEWALK OR RAMP)
SY 2,190.000 $22.000 $25.000
REMOVING CONC (SAWCUT)
LF 1,065.000 $50.000 $10.000
REMOVING STAB BASE & ASPH PAV(14")
SY 1,032.000 $18.000 $25.000
EXCAVATION (ROADWAY)
CY 5,933.000 $30.000 $30.000
EMBANKMENT (FINAL)(DENS CONT)(TY C)
CY 394.000 $27.500 $50.000
D-GR HMA TY-B PG64-22
TON 5,327.000 $110.000 $150.000
CONC PVMT (JOINTED - CPCD) (12")
SY 14,543.000 $132.000 $150.000
CONC PVMT (JOINTED-CPCD)(HES)(12")
SY 1,432.000 $158.000 $200.000
FLOWABLE BACKFILL
CY 572.000 $190.000 $200.000
TRENCH EXCAVATION PROTECTION
LF 1,266.000 $5.500 $10.000
DRILL SHAFT (RDWY ILL POLE) (30 IN)
LF 12.000 $245.000 $300.000
DRILL SHAFT (TRF SIG POLE) (30 IN)
LF 55.000 $275.000 $400.000
DRILL SHAFT (TRF SIG POLE) (36 IN)
LF 39.000 $330.000 $500.000
DRILL SHAFT (RDWY ILL POLE) (24 IN)
LF 96.000 $127.000 $250.000
CL C CONC (COLLAR)
EA 1.000 $950.000 $2,500.000
RETAINING WALL (CAST - IN - PLACE)
SF 661.000 $60.000 $150.000
RIPRAP (CONC)(5 IN)
CY 29.000 $605.000 $750.000
RAIL (HANDRAIL)(DECORATIVE)
LF 943.000 $130.000 $250.000
CONC BOX CULV (4 FT X 3 FT)
LF 261.000 $300.000 $500.000
RC PIPE (CL III)(24 IN)
LF 414.000 $110.000 $100.000
RC PIPE (CL III)(30 IN)
LF 55.000 $154.000 $150.000
RC PIPE (CL III)(36 IN)
LF 533.000 $200.000 $200.000
MANH (COMPL)(PRM)(48IN)
EA 1.000 $4,400.000 $5,000.000
JCTBOX(COMPL)(PJB)(4FTX4FT)
EA 1.000 $4,400.000 $6,000.000
JCTBOX(COMPL)(PJB)(5FTX5FT)
EA 1.000 $5,200.000 $7,000.000
INLET (COMPL)(PCO)(3FT)(LEFT)
EA 1.000 $4,950.000 $7,500.000
INLET (COMPL)(PCO)(4FT)(RIGHT)
EA 2.000 $6,270.000 $8,000.000
INLET (COMPL)(PCO)(4FT)(BOTH)
EA 3.000 $5,500.000 $8,500.000
INLET (COMPL)(PCU)(3FT)(NONE)
EA 1.000 $5,500.000 $6,000.000
INLET (COMPL)(PCU)(3FT)(LEFT)
EA 1.000 $5,500.000 $7,500.000
INLET (COMPL)(PCU)(3FT)(BOTH)
EA 1.000 $5,500.000 $8,000.000
INLET (COMPL)(PSL)(FG)(3FTX3FT-3FTX3FT)
EA 1.000 $4,500.000 $7,500.000
INLET (COMPL)(PSL)(FG)(6FTX6FT-3FTX3FT)
EA 1.000 $8,600.000 $10,000.000
INLET (COMPL)(CURB)(TY 2)(15')
EA 1.000 $12,000.000 $10,000.000
MANHOLE (COMPL)(SPECIAL)
EA 1.000 $6,000.000 $15,000.000
CAST-IN-PLACE TRENCH DRAIN
LF 20.000 $375.000 $500.000
REMOV STR (INLET)
EA 12.000 $2,400.000 $2,500.000
REMOV STR (MANHOLE)
EA 1.000 $1,140.000 $2,500.000
REMOV STR (PIPE)
LF 715.000 $32.000 $25.000
MOBILIZATION
LS 1.000 $850,000.000 $850,000.070
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 25.000 $15,000.000 $33,000.000
CONSTRUCTION EXITS (INSTALL) (TY 1)
SY 100.000 $24.000 $15.000
CONSTRUCTION EXITS (REMOVE)
SY 100.000 $8.000 $5.000
BIODEG EROSN CONT LOGS (INSTL) (12")
LF 345.000 $6.000 $10.000
BIODEG EROSN CONT LOGS (REMOVE)
LF 345.000 $1.250 $2.000
PORT CTB (FUR & INST)(LOW PROF)(TY 1)
LF 540.000 $34.000 $100.000
PORT CTB (FUR & INST)(LOW PROF)(TY 2)
LF 80.000 $54.000 $100.000
PORT CTB (MOVE)(LOW PROF)(TY 1)
LF 2,340.000 $10.000 $20.000
PORT CTB (MOVE)(LOW PROF)(TY 2)
LF 300.000 $13.000 $20.000
PORT CTB (STKPL)(LOW PROF)(TY 1)
LF 760.000 $12.000 $20.000
PORT CTB (STKPL)(LOW PROF)(TY 2)
LF 80.000 $15.000 $20.000
PORT CTB (REMOVE)(LOW PROF)(TY 1)
LF 680.000 $11.000 $20.000
PORT CTB (REMOVE)(LOW PROF)(TY 2)
LF 100.000 $15.000 $20.000
CONC CURB (MONO) (TY II)
LF 3,096.000 $10.000 $20.000
DRIVEWAYS (CONC)
SY 67.000 $120.000 $125.000
CONC SIDEWALKS (5")
SY 3,181.000 $64.000 $125.000
CURB RAMPS (TY 1)
EA 10.000 $2,200.000 $2,000.000
CURB RAMPS (TY 2)
EA 3.000 $2,200.000 $2,000.000
CURB RAMPS (TY 5)
EA 6.000 $2,750.000 $2,000.000
CURB RAMPS (TY 7)
EA 1.000 $1,690.000 $2,000.000
CONCRETE SIDEWALK (STEPS)
SY 68.000 $500.000 $500.000
REMOVE RD IL ASM (SHOE-BASE)
EA 17.000 $605.000 $1,000.000
IN RD IL (TY SA) 50T-10 (400W EQ) LED
EA 1.000 $3,050.000 $5,000.000
CONDT (PVC) (SCH 80) (2")
LF 2,828.000 $22.000 $30.000
CONDT (PVC) (SCH 80) (2") (BORE)
LF 3,375.000 $66.000 $60.000
ELEC CONDR (NO.8) BARE
LF 3,975.000 $2.200 $1.500
ELEC CONDR (NO.8) INSULATED
LF 1,930.000 $3.000 $1.750
ELEC CONDR (NO.6) BARE
LF 1,703.000 $1.850 $1.500
ELEC CONDR (NO.6) INSULATED
LF 6,594.000 $2.000 $1.750
GROUND BOX TY A (122311)W/APRON
EA 18.000 $1,100.000 $1,200.000
GROUND BOX TY C (162911)
EA 12.000 $1,000.000 $1,300.000
REMOVE ELECTRICAL SERVICES
EA 2.000 $600.000 $500.000
ELC SRV TY D 120/240 060(NS)AL(E)PS(U)
EA 2.000 $5,000.000 $5,000.000
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
EA 11.000 $650.000 $600.000
IN SM RD SN SUP&AM TY10BWG(1)SB(P)
EA 24.000 $500.000 $700.000
IN SM RD SN SUP&AM TYS80(1)SA(P)
EA 1.000 $550.000 $800.000
IN SM RD SN SUP&AM TYS80(1)SA(U-1EXT)
EA 3.000 $990.000 $1,000.000
IN SM RD SN SUP&AM TYS80(1)SB(P)
EA 7.000 $850.000 $900.000
REMOVE SM RD SN SUP&AM
EA 20.000 $165.000 $100.000
WK ZN PAV MRK REMOV (W)4"(DOT)
LF 24.000 $2.500 $3.000
WK ZN PAV MRK REMOV (W)4"(SLD)
LF 15,749.000 $1.100 $1.500
WK ZN PAV MRK REMOV (W)24"(SLD)
LF 51.000 $16.500 $15.000
WK ZN PAV MRK REMOV (Y)4"(DOT)
LF 110.000 $2.300 $3.000
WK ZN PAV MRK REMOV (Y)4"(SLD)
LF 10,572.000 $1.100 $1.500
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
LF 245.000 $0.800 $1.500
REFL PAV MRK TY I (W)24"(SLD)(100MIL)
LF 1,257.000 $10.000 $7.000
REFL PAV MRK TY I (W)(ARROW)(100MIL)
EA 3.000 $115.000 $200.000
REFL PAV MRK TY I (W)(WORD)(100MIL)
EA 3.000 $150.000 $200.000
REFL PAV MRK TY I (W)(SYMBOL)(100MIL)
EA 4.000 $875.000 $500.000
REF PAV MRK TY I(W)18"(YLD TRI)(100MIL)
EA 12.000 $40.000 $50.000
REFL PAV MRK TY I (Y)4"(DOT)(100MIL)
LF 121.000 $1.500 $5.000
PAVEMENT SEALER 4"
LF 8,768.000 $0.500 $0.400
PAVEMENT SEALER 8"
LF 245.000 $0.300 $1.000
PAVEMENT SEALER 24"
LF 1,257.000 $1.900 $4.000
PAVEMENT SEALER (ARROW)
EA 3.000 $23.000 $75.000
PAVEMENT SEALER (WORD)
EA 3.000 $28.000 $75.000
PAVEMENT SEALER (SYMBOL)
EA 4.000 $850.000 $150.000
PAVEMENT SEALER (YLD TRI)
EA 12.000 $17.000 $25.000
RE PM W/RET REQ TY I (W)4"(SLD)(100MIL)
LF 5,479.000 $0.400 $1.000
RE PM W/RET REQ TY I (Y)4"(SLD)(100MIL)
LF 3,068.000 $0.400 $1.000
PREFAB PAV MRK TY B (W)(4")(BRK)CNTST
LF 100.000 $5.750 $30.000
REFL PAV MRKR TY I-C
EA 6.000 $3.250 $12.000
REFL PAV MRKR TY II-A-A
EA 76.000 $3.000 $12.000
ELIM EXT PAV MRK & MRKS (4")
LF 1,196.000 $0.800 $3.000
ELIM EXT PAV MRK & MRKS (12")
LF 166.000 $2.200 $4.000
ELIM EXT PAV MRK & MRKS (24")
LF 29.000 $3.500 $7.000
PAV SURF PREP FOR MRK (4")
LF 8,768.000 $0.500 $0.200
PAV SURF PREP FOR MRK (8")
LF 245.000 $0.150 $1.000
PAV SURF PREP FOR MRK (24")
LF 1,257.000 $1.000 $3.000
PAV SURF PREP FOR MRK (ARROW)
EA 3.000 $13.000 $75.000
PAV SURF PREP FOR MRK (WORD)
EA 3.000 $18.000 $75.000
PAV SURF PREP FOR MRK (SYMBOL)
EA 4.000 $22.000 $150.000
PAV SURF PREP FOR MRK (18")(YLD TRI)
EA 12.000 $14.000 $30.000
PAV SURF PREP FOR MRK (RPM)
EA 82.000 $1.500 $7.000
REMOVING TRAFFIC SIGNALS
EA 2.000 $5,500.000 $7,500.000
INS HY TRF SIG (DPT SUP CNT & CAB)(ISO)
EA 2.000 $11,000.000 $20,000.000
TEMP TRAF SIGNALS
EA 2.000 $50,000.000 $50,000.000
VEH SIG SEC (12")LED(GRN)
EA 20.000 $450.000 $250.000
VEH SIG SEC (12")LED(YEL)
EA 20.000 $450.000 $250.000
VEH SIG SEC (12")LED(RED)
EA 20.000 $450.000 $250.000
PED SIG SEC (LED)(COUNTDOWN)
EA 12.000 $610.000 $750.000
BACK PLATE (12")(3 SEC)ALUM
EA 20.000 $150.000 $150.000
TRF SIG CBL (TY A)(12 AWG)(7 CONDR)
LF 1,940.000 $2.100 $2.500
TRF SIG CBL (TY A)(12 AWG)(12 CONDR)
LF 1,530.000 $3.000 $3.500
INS TRF SIG PL AM(S)1 ARM(24')LUM
EA 2.000 $7,000.000 $9,000.000
INS TRF SIG PL AM(S)1 ARM(28')LUM
EA 2.000 $9,000.000 $10,000.000
INS TRF SIG PL AM(S)1 ARM(36')LUM
EA 1.000 $11,000.000 $11,000.000
INS TRF SIG PL AM(S)1 ARM(40')LUM
EA 1.000 $11,000.000 $12,000.000
INS TRF SIG PL AM(S)2 ARM(24-20')LUM
EA 1.000 $6,800.000 $13,000.000
INS TRF SIG PL AM(S)2 ARM(36-28')LUM
EA 1.000 $11,000.000 $14,000.000
PED POLE ASSEMBLY
EA 6.000 $2,000.000 $3,000.000
PED DETECT PUSH BUTTON (APS)
EA 12.000 $860.000 $900.000
PED DETECTOR CONTROLLER UNIT
EA 3.000 $3,500.000 $5,000.000
RMV, CLN, PALLETZ, & STORE STREET BRICK
SY 315.000 $5.000 $150.000
PORTABLE CHANGEABLE MESSAGE SIGN
DAY 750.000 $100.000 $100.000
VIVDS PROCESSOR SYSTEM
EA 2.000 $5,400.000 $12,000.000
VIVDS CAMERA ASSEMBLY
EA 10.000 $2,200.000 $3,000.000
VIVDS SET-UP SYSTEM
EA 2.000 $750.000 $1,000.000
VIVDS COMMUNICATION CABLE (COAXIAL)
LF 1,630.000 $2.700 $3.500
TMA (STATIONARY)
DAY 32.000 $200.000 $250.000
TMA (MOBILE OPERATION)
HR 30.000 $50.000 $100.000
IN RD IL(TY AL) 20T-2-2 (120W EQ) LED
EA 12.000 $5,000.000 $13,500.000
Totals: $6,691,606.250 $8,589,803.870