Show Job Controls
Bid Cobra

MCCULLOCH US 190 (0128-04-035)

Items: 256

County: MCCULLOCH
Length: N/A
Highway: US 190
District: BROWNWOOD
Control Number: 0128-04-035
DBE Goal: N/A
Project: STP 2017(458)
Guaranty: N/A
Time: 636 WORKING DAYS
Engineer's Estimate: $11,675,760.25
Date: 07/12/2017 (8 years ago)
Contract Number: N/A
Type: RECONSTRUCT URBAN ROAD
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice HCS Excel Tabs Print Print Notice
Bidders (1)
E
Engineer's Estimate
$11,675,760.25
$17,475,201.59
Over/Under Est: 49.67% $5,799,441.34

Bid Items & Bid Tabulations

256 Total 0 of 256
MCCULLOCH  |  US 190  |  BROWNWOOD  |  0128-04-035  |  07/12/2017  |  $11,675,760.25  |  STP 2017(458)  |  RECON URBAN ROAD  |  636 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
ALLEN KELLER COMPANY
PREPARING ROW
STA 0.500 $2,000.000 $4,176.640
PREPARING ROW(TREE)(12" TO 24" DIA)
EA 12.000 $881.000 $826.540
REMOVING CONC (PAV)
SY 20,444.000 $11.000 $6.670
REMOVING CONC (DRIVEWAYS)
SY 1,751.000 $17.000 $11.970
REMOVING CONC (MISC)
SY 670.000 $25.000 $21.680
REMOVING CONC (CURB OR CURB & GUTTER)
LF 7,081.000 $12.000 $3.590
REMOVING CONC (SIDEWALK OR RAMP)
SY 4,053.000 $12.000 $13.540
REMOVING STAB BASE & ASPH PAV(14")
SY 22,970.000 $18.000 $3.210
EXCAVATION (ROADWAY)
CY 22,925.000 $12.000 $10.570
EMBANKMENT (FINAL)(ORD COMP)(TY C)
CY 101.000 $40.000 $73.890
EMBANKMENT (FINAL)(DENS CONT)(TY C)
CY 362.000 $24.000 $17.070
BLOCK SODDING
SY 101.000 $3.500 $8.330
BROADCAST SEED (PERM) (RURAL) (CLAY)
SY 1,790.000 $0.300 $1.110
BROADCAST SEED (TEMP) (WARM)
SY 895.000 $0.200 $0.560
BROADCAST SEED (TEMP) (COOL)
SY 895.000 $0.200 $0.560
CELL FBR MLCH SEED(PERM)(RURAL)(CLAY)
SY 101.000 $0.500 $2.220
VEGETATIVE WATERING
MG 44.000 $13.000 $45.860
FL BS (CMP IN PLC)(TYD GR1-2)(FNAL POS)
CY 4,590.000 $45.000 $47.040
D-GR HMA TY-C PG64-22
TON 4,547.000 $95.000 $106.650
CONC PVMT (JOINTED - CPCD) (10")
SY 23,843.000 $70.000 $135.540
CONC PVMT (JOINTED - CPCD) (12")
SY 14,897.000 $75.000 $139.980
CONC PVMT (JOINTED-CPCD)(HES)(10")
SY 2,147.000 $100.000 $149.980
CONC PVMT (JOINTED-CPCD)(HES)(12")
SY 1,139.000 $119.000 $166.650
FLOWABLE BACKFILL
CY 1,163.000 $154.000 $194.420
TRENCH EXCAVATION PROTECTION
LF 5,214.000 $3.500 $13.330
DRILL SHAFT (RDWY ILL POLE) (30 IN)
LF 180.000 $245.000 $205.530
DRILL SHAFT (TRF SIG POLE) (30 IN)
LF 55.000 $244.000 $238.860
DRILL SHAFT (TRF SIG POLE) (36 IN)
LF 39.000 $255.000 $277.750
DRILL SHAFT (RDWY ILL POLE) (24 IN)
LF 78.000 $127.000 $166.650
RETAINING WALL (CAST - IN - PLACE)
SF 1,126.000 $85.000 $40.330
RIPRAP (CONC)(5 IN)
CY 21.000 $440.000 $528.250
RAIL (HANDRAIL)(DECORATIVE)
LF 812.000 $130.000 $150.920
CONC BOX CULV (4 FT X 3 FT)
LF 261.000 $205.000 $444.390
RC PIPE (CL III)(24 IN)
LF 3,422.000 $85.000 $97.770
RC PIPE (CL III)(30 IN)
LF 874.000 $90.000 $144.430
RC PIPE (CL III)(36 IN)
LF 657.000 $120.000 $205.530
MANH (COMPL)(PRM)(48IN)
EA 7.000 $3,070.000 $3,166.310
JCTBOX(COMPL)(PJB)(4FTX4FT)
EA 1.000 $4,400.000 $4,221.750
JCTBOX(COMPL)(PJB)(5FTX5FT)
EA 1.000 $5,200.000 $5,332.740
INLET (COMPL)(PCO)(3FT)(NONE)
EA 7.000 $4,000.000 $3,888.450
INLET (COMPL)(PCO)(3FT)(LEFT)
EA 9.000 $4,400.000 $4,443.950
INLET (COMPL)(PCO)(3FT)(RIGHT)
EA 11.000 $4,300.000 $4,666.140
INLET (COMPL)(PCO)(3FT)(BOTH)
EA 9.000 $4,700.000 $5,554.930
INLET (COMPL)(PCO)(4FT)(RIGHT)
EA 2.000 $4,500.000 $6,110.430
INLET (COMPL)(PCU)(3FT)(NONE)
EA 1.000 $4,380.000 $3,610.710
INLET (COMPL)(PSL)(RC)(4FTX4FT)
EA 1.000 $4,600.000 $3,888.450
INLET (COMPL)(PSL)(FG)(3FTX3FT-3FTX3FT)
EA 1.000 $4,100.000 $3,888.450
INLET (COMPL)(PSL)(FG)(6FTX6FT-3FTX3FT)
EA 1.000 $8,600.000 $6,665.920
INLET (COMPL)(CURB)(TY 2)(10')
EA 5.000 $11,000.000 $6,665.920
INLET (COMPL)(CURB)(TY 2)(15')
EA 2.000 $12,000.000 $8,332.400
HEADWALL (CH - PW - 0) (DIA= 24 IN)
EA 1.000 $2,700.000 $4,443.950
HEADWALL (CH - PW - S) (DIA= 24 IN)
EA 1.000 $2,800.000 $4,999.440
SET (TY II) (24 IN) (RCP) (4: 1) (C)
EA 1.000 $1,080.000 $1,333.180
REMOV STR (INLET)
EA 20.000 $2,400.000 $944.340
REMOV STR (MANHOLE)
EA 1.000 $1,140.000 $944.340
REMOV STR (PIPE)
LF 884.000 $32.000 $33.330
MOBILIZATION
LS 1.000 $850,000.000 $1,700,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 39.000 $3,200.000 $28,000.000
CONSTRUCTION EXITS (INSTALL) (TY 1)
SY 200.000 $24.000 $16.660
CONSTRUCTION EXITS (REMOVE)
SY 200.000 $8.000 $6.670
TEMP SEDMT CONT FENCE (INSTALL)
LF 7,994.000 $3.000 $2.220
TEMP SEDMT CONT FENCE (REMOVE)
LF 7,994.000 $1.000 $1.110
BIODEG EROSN CONT LOGS (INSTL) (12")
LF 908.000 $6.000 $8.890
BIODEG EROSN CONT LOGS (REMOVE)
LF 908.000 $1.250 $1.110
CONSTRUCTING DETOURS
SY 3,836.000 $72.000 $45.850
PORT CTB (FUR & INST)(LOW PROF)(TY 1)
LF 80.000 $34.000 $76.330
PORT CTB (FUR & INST)(LOW PROF)(TY 2)
LF 20.000 $50.000 $112.910
PORT CTB (REMOVE)(LOW PROF)(TY 1)
LF 80.000 $10.000 $18.520
PORT CTB (REMOVE)(LOW PROF)(TY 2)
LF 20.000 $12.000 $18.520
CONC CURB (MONO) (TY II)
LF 10,017.000 $3.000 $16.660
DRIVEWAYS (CONC)
SY 1,743.000 $90.000 $81.100
CONC SIDEWALKS (5")
SY 5,904.000 $55.000 $57.770
CURB RAMPS (TY 1)
EA 9.000 $1,690.000 $1,666.480
CURB RAMPS (TY 2)
EA 7.000 $1,740.000 $1,777.580
CURB RAMPS (TY 5)
EA 16.000 $1,740.000 $2,110.880
CURB RAMPS (TY 7)
EA 3.000 $1,690.000 $1,666.480
CURB RAMPS (TY 10)
EA 32.000 $3,300.000 $1,888.680
CURB RAMPS (TY 21)
EA 1.000 $2,672.000 $2,444.170
MTL W-BEAM GD FEN (TIM POST)
LF 850.000 $25.000 $25.000
MTL W-BEAM GD FEN (STEEL POST)
LF 75.000 $26.000 $77.770
MTL BEAM GD FEN TRANS (T6)
EA 20.000 $1,000.000 $1,166.540
REMOVE METAL BEAM GUARD FENCE
LF 3,025.000 $2.000 $3.330
REMOVE TERMINAL ANCHOR SECTION
EA 22.000 $233.000 $333.300
GUARDRAIL END TREATMENT (INSTALL)
EA 26.000 $2,184.000 $2,833.020
GUARDRAIL END TREATMENT (REMOVE)
EA 4.000 $260.000 $333.300
MAILBOX INSTALL-S (TWG-POST) TY 1
EA 22.000 $274.000 $222.200
REMOVE RD IL ASM (SHOE-BASE)
EA 50.000 $470.000 $499.940
IN RD IL (TY SA) 50T-10 (400W EQ) LED
EA 17.000 $3,050.000 $3,466.280
CONDT (PVC) (SCH 40) (2")
LF 4,601.000 $8.000 $14.440
CONDT (PVC) (SCH 40) (2") (BORE)
LF 1,525.000 $21.500 $44.440
CONDT (PVC) (SCH 80) (2")
LF 2,175.000 $8.000 $14.440
CONDT (PVC) (SCH 80) (2") (BORE)
LF 2,325.000 $12.000 $44.440
ELEC CONDR (NO.8) BARE
LF 3,975.000 $1.400 $1.060
ELEC CONDR (NO.8) INSULATED
LF 1,930.000 $1.750 $1.110
ELEC CONDR (NO.6) BARE
LF 6,120.000 $1.850 $1.110
ELEC CONDR (NO.6) INSULATED
LF 21,840.000 $2.000 $1.170
GROUND BOX TY A (122311)W/APRON
EA 58.000 $1,100.000 $777.690
GROUND BOX TY C (162911)
EA 12.000 $1,000.000 $888.790
REMOVE GROUND BOX
EA 1.000 $380.000 $111.100
REMOVE ELECTRICAL SERVICES
EA 2.000 $600.000 $388.850
ELC SRV TY A 120/240 060(NS)AL(E)PS(U)
EA 2.000 $2,000.000 $4,221.750
ELC SRV TY A 120/240 060(NS)SS(E)TP(O)
EA 2.000 $5,700.000 $4,555.050
ALUMINUM SIGNS (TY A)
SF 9.000 $50.000 $22.220
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
EA 40.000 $500.000 $588.820
IN SM RD SN SUP&AM TY10BWG(1)SB(P)
EA 42.000 $500.000 $561.050
IN SM RD SN SUP&AM TYS80(1)SA(T)
EA 2.000 $670.000 $816.580
IN SM RD SN SUP&AM TYS80(1)SA(U-1EXT)
EA 2.000 $950.000 $883.240
IN SM RD SN SUP&AM TYS80(1)SB(P)
EA 8.000 $850.000 $761.030
IN SM RD SN SUP&AM TYS80(1)SB(U-1EXT)
EA 4.000 $890.000 $933.230
RELOCATE SM RD SN SUP&AM TY 10BWG
EA 2.000 $440.000 $388.850
REMOVE SM RD SN SUP&AM
EA 65.000 $98.000 $49.990
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI)
EA 39.000 $28.000 $38.880
WK ZN PAV MRK NON-REMOV (W)4"(SLD)
LF 7,430.000 $0.500 $0.890
WK ZN PAV MRK NON-REMOV (W)24"(SLD)
LF 66.000 $2.500 $13.330
WK ZN PAV MRK NON-REMOV (W)(RR XING)
EA 2.000 $145.000 $666.590
WK ZN PAV MRK NON-REMOV (Y)4"(SLD)
LF 7,018.000 $0.250 $0.890
WK ZN PAV MRK REMOV (W)4"(DOT)
LF 126.000 $2.500 $2.890
WK ZN PAV MRK REMOV (W)4"(SLD)
LF 17,348.000 $0.600 $1.330
WK ZN PAV MRK REMOV (W)24"(SLD)
LF 191.000 $9.000 $13.890
WK ZN PAV MRK REMOV (W)(RR XING)
EA 2.000 $432.000 $666.590
WK ZN PAV MRK REMOV (Y)4"(DOT)
LF 102.000 $1.000 $2.890
WK ZN PAV MRK REMOV (Y)4"(SLD)
LF 20,631.000 $0.850 $1.440
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
LF 757.000 $0.800 $1.440
REFL PAV MRK TY I (W)12"(SLD)(100MIL)
LF 1,737.000 $2.500 $4.440
REFL PAV MRK TY I (W)24"(SLD)(100MIL)
LF 601.000 $10.000 $7.890
REFL PAV MRK TY I (W)(ARROW)(100MIL)
EA 14.000 $115.000 $127.760
REFL PAV MRK TY I (W)(WORD)(100MIL)
EA 10.000 $150.000 $172.200
REFL PAV MRK TY I (W)(RR XING)(100MIL)
EA 2.000 $660.000 $572.160
REFL PAV MRK TY I (W)(SYMBOL)(100MIL)
EA 4.000 $875.000 $472.170
REF PAV MRK TY I(W)18"(YLD TRI)(100MIL)
EA 15.000 $40.000 $24.440
REFL PAV MRK TY I (Y)4"(DOT)(100MIL)
LF 120.000 $1.500 $3.060
PAVEMENT SEALER 4"
LF 22,260.000 $0.500 $0.690
PAVEMENT SEALER 8"
LF 757.000 $0.300 $1.330
PAVEMENT SEALER 12"
LF 1,737.000 $1.000 $1.720
PAVEMENT SEALER 24"
LF 601.000 $1.900 $3.280
PAVEMENT SEALER (ARROW)
EA 14.000 $23.000 $66.660
PAVEMENT SEALER (WORD)
EA 10.000 $28.000 $66.660
PAVEMENT SEALER (SYMBOL)
EA 2.000 $850.000 $149.990
PAVEMENT SEALER (RR XING)
EA 4.000 $218.000 $405.510
PAVEMENT SEALER (YLD TRI)
EA 15.000 $17.000 $23.330
RE PM W/RET REQ TY I (W)4"(SLD)(100MIL)
LF 10,789.000 $0.400 $1.390
RE PM W/RET REQ TY I (Y)4"(BRK)(100MIL)
LF 717.000 $0.450 $1.110
RE PM W/RET REQ TY I (Y)4"(SLD)(100MIL)
LF 10,654.000 $0.400 $0.670
PREFAB PAV MRK TY B (W)(4")(BRK)CNTST
LF 100.000 $5.750 $27.770
REFL PAV MRKR TY I-C
EA 35.000 $3.250 $11.110
REFL PAV MRKR TY II-A-A
EA 250.000 $3.000 $8.890
ELIM EXT PAV MRK & MRKS (4")
LF 16,436.000 $1.500 $1.160
ELIM EXT PAV MRK & MRKS (6")
LF 512.000 $0.500 $1.160
ELIM EXT PAV MRK & MRKS (12")
LF 83.000 $2.250 $2.320
ELIM EXT PAV MRK & MRKS (24")
LF 231.000 $2.750 $3.480
ELIM EXT PAV MRK & MRKS (RR XING)
EA 2.000 $100.000 $580.500
PAV SURF PREP FOR MRK (4")
LF 22,260.000 $0.500 $0.670
PAV SURF PREP FOR MRK (8")
LF 757.000 $0.150 $1.330
PAV SURF PREP FOR MRK (12")
LF 1,737.000 $0.500 $1.670
PAV SURF PREP FOR MRK (24")
LF 601.000 $1.000 $3.330
PAV SURF PREP FOR MRK (ARROW)
EA 14.000 $13.000 $66.660
PAV SURF PREP FOR MRK (WORD)
EA 10.000 $18.000 $66.660
PAV SURF PREP FOR MRK (RR XING)
EA 2.000 $210.000 $244.420
PAV SURF PREP FOR MRK (SYMBOL)
EA 4.000 $22.000 $127.760
PAV SURF PREP FOR MRK (18")(YLD TRI)
EA 15.000 $14.000 $27.770
PAV SURF PREP FOR MRK (RPM)
EA 285.000 $1.500 $1.110
REMOVING TRAFFIC SIGNALS
EA 2.000 $4,000.000 $6,888.120
INS HY TRF SIG (DPT SUP CNT & CAB)(ISO)
EA 2.000 $9,000.000 $17,775.790
TEMP TRAF SIGNALS
EA 2.000 $15,000.000 $30,663.240
VEH SIG SEC (12")LED(GRN)
EA 20.000 $450.000 $233.310
VEH SIG SEC (12")LED(YEL)
EA 20.000 $250.000 $233.310
VEH SIG SEC (12")LED(RED)
EA 20.000 $300.000 $233.310
PED SIG SEC (LED)(COUNTDOWN)
EA 12.000 $450.000 $722.140
BACK PLATE (12")(3 SEC)ALUM
EA 20.000 $75.000 $83.320
TRF SIG CBL (TY A)(12 AWG)(7 CONDR)
LF 1,940.000 $2.100 $1.670
TRF SIG CBL (TY A)(12 AWG)(12 CONDR)
LF 1,530.000 $3.000 $2.440
INSTL RDSD FLSH BCN ASSM (SOLAR PWRD)
EA 1.000 $7,100.000 $7,221.410
REMOV RDSD FLSH BCN AM (SOLAR PWRD)
EA 1.000 $1,100.000 $261.080
INS TRF SIG PL AM(S)1 ARM(24')LUM
EA 2.000 $5,300.000 $5,777.130
INS TRF SIG PL AM(S)1 ARM(28')LUM
EA 2.000 $5,700.000 $6,221.530
INS TRF SIG PL AM(S)1 ARM(36')LUM
EA 1.000 $6,200.000 $7,332.510
INS TRF SIG PL AM(S)1 ARM(40')LUM
EA 1.000 $7,300.000 $8,554.600
INS TRF SIG PL AM(S)2 ARM(24-20')LUM
EA 1.000 $6,800.000 $8,665.700
INS TRF SIG PL AM(S)2 ARM(36-28')LUM
EA 1.000 $9,000.000 $10,776.570
PED POLE ASSEMBLY
EA 6.000 $2,000.000 $2,138.650
PED DETECT PUSH BUTTON (APS)
EA 12.000 $860.000 $883.230
PED DETECTOR CONTROLLER UNIT
EA 3.000 $3,500.000 $4,110.650
TREE PROTECTION
EA 2.000 $350.000 $2,221.980
VIVDS PROCESSOR SYSTEM
EA 2.000 $5,400.000 $8,332.400
VIVDS CAMERA ASSEMBLY
EA 10.000 $2,200.000 $1,777.580
VIVDS SET-UP SYSTEM
EA 2.000 $750.000 $444.400
VIVDS COMMUNICATION CABLE (COAXIAL)
LF 1,630.000 $2.700 $2.500
IN RD IL(TY AL) 20T-2-2 (120W EQ) LED
EA 13.000 $3,000.000 $7,665.810
TEMPORARY PAVEMENT
LF 774.000 $50.000 $38.880
INSTALL 1 1/4" GAS LINE
LF 366.000 $25.000 $77.770
INSTALL 2" GAS LINE
LF 1,040.000 $30.000 $99.990
INSTALL 4" GAS LINE
LF 1,263.000 $40.000 $105.540
INSTALL 6" GAS LINE
LF 202.000 $180.000 $111.100
INSTALL 4" CASING PIPE
LF 117.000 $120.000 $333.300
INSTALL 8" CASING PIPE
LF 544.000 $175.000 $388.850
INSTALL 10" CASING PIPE
LF 228.000 $240.000 $399.960
RECONNECT EXISTING SERVICE
EA 19.000 $900.000 $3,999.550
REMOVE EXISTING GAS PIPE
LF 3,460.000 $7.000 $68.880
CAST IRON FITTINGS
TON 1.990 $2,500.000 $17,775.790
CUT AND PLUG WATER MAIN FOR TEST
EA 3.000 $500.000 $999.890
TRENCH EXCAVATION SAFETY AND SUPPORT
LF 5,530.000 $2.000 $1.110
ROCK FOUNDATION
CY 239.640 $75.000 $66.660
SAND BACKFILL
CY 586.090 $35.000 $55.550
DISPOSE HEAVY CHLORINATED WATER MAIN
LS 1.000 $3,000.000 $5,554.930
ADJUST AND/OR RELOCATE WATER METER BOX
EA 13.000 $850.000 $444.390
ADJ. WATER VALVE COVRS AND VALVE STACKS
EA 2.000 $500.000 $555.500
ABNDON EXSTWTRLINE/ PRESSUREGROUT2"-12"
LF 2,488.000 $35.000 $17.780
CUT ADN PLUG EXIST WATERLINE (2"-12")
EA 10.000 $500.000 $555.490
REMOVE EXIST WATERLINE (2"-12")
LF 235.000 $50.000 $18.890
CONECT PROP 6"WTRLINE TO EXST 4"WTR LIN
EA 6.000 $2,400.000 $2,221.970
CONECT PROP 6"WTRLINE TO EXST 6"WTR LIN
EA 6.000 $2,500.000 $2,999.670
2" GATE VALVE
EA 4.000 $1,400.000 $777.690
3" GATE VALVE
EA 2.000 $1,450.000 $833.240
4" GATE VALVE
EA 2.000 $1,500.000 $999.890
6" GATE VALVE
EA 43.000 $1,500.000 $1,333.180
8" GATE VALVE
EA 4.000 $1,750.000 $1,999.780
3" DR-26 C900 PVC WATERLINE
LF 162.000 $30.000 $34.440
6"DR-26 C900 PVC WATER LINE
LF 5,195.000 $35.000 $49.990
8" DR-18 C900 PVC WATER LINE
LF 173.000 $42.000 $66.660
ENCASEMNT FR 6"WATERLINE (BORE/OPN CUT)
LF 116.000 $160.000 $199.980
ENCASEMNT FR 8"WATERLINE (BORE/OPN CUT)
LF 133.000 $210.000 $211.090
4" ENCASEMENT PIPE
LF 40.000 $40.000 $144.430
WATER SERVICE RECONNECTS
EA 15.000 $1,000.000 $1,222.090
2" WATER SERVICE RECONNECTS
EA 61.000 $3,000.000 $2,777.470
INSTALL NEW FIRE HYDRANT
EA 12.000 $6,380.000 $4,110.650
REMOVE EXIST FIRE HYDRANT
EA 4.000 $825.000 $555.490
TEMPORARY PAVEMENT REPLACEMENT
LF 5,572.000 $40.000 $10.000
CONECT PROP 3"WATRLINE TO EXST 3"WTRLNE
EA 2.000 $2,300.000 $1,666.480
REMOVE EXISTING SEWER LINE 2"-12"
LF 869.000 $26.000 $18.890
ABNDON EXST SWRLINE/PRESURE GROUT2"-12"
LF 140.000 $70.000 $28.890
REMOVE STRUCTURAL MANHOLE
EA 6.000 $600.000 $3,332.960
VACUUM TEST FOR WASTEWATER MANHOLE
EA 12.000 $100.000 $444.400
TELEVISION INSPECTION
LF 3,338.000 $5.000 $2.220
ROCK FOUNDATION
CY 197.670 $75.000 $55.550
SAND BACKFILL
CY 314.770 $35.000 $66.660
48" PRECAST CONCRETE MANHOLE
EA 12.000 $8,300.000 $7,776.910
RECONNECT EXISTING SEWER MAINS
EA 8.000 $3,600.000 $3,332.960
RECONNECT EXISTING SEWER SERVICES
EA 34.000 $950.000 $2,777.470
8" SDR-26 PVC GRAVITY SEWER LINE
LF 2,908.000 $70.000 $199.980
ENCASEMENT FR 8"SEWR LINE(BORE/OPN CUT)
LF 95.000 $240.000 $177.760
TRENCH SAFETY (DEPTHS GREATER THAN 5FT)
LF 2,726.000 $2.000 $2.220
TEMPORARY PAVEMENT REPLACEMENT
LF 2,718.000 $40.000 $11.110
18"ENCASMNT EXST FORCEMAIN BORE/OPN-CUT
LF 27.000 $3,000.000 $222.200
336 AAC PRIMARY PHASE CONDUCTOR
LF 10,049.000 $9.000 $22.220
#4/0 AAC PRIMARY NEUTRAL CONDUCTOR
LF 3,348.000 $9.000 $16.660
#2ACSR PRIMRY PHASE AND NEUTRAL CONDTOR
LF 1,196.000 $8.000 $22.220
SECONDARY CONDUCTOR #2AL TRIPLEX CABLES
LF 1,288.000 $10.000 $16.660
MULTI 3" CONDUITS AND CONDUCTORS (BORE)
LF 1,239.000 $70.000 $222.200
INSTALL POLE (HARDWARE,ANCHOR,AND MISC)
EA 45.000 $500.000 $555.490
INSTALL SERVICE (PRIMARY ONLY)
EA 24.000 $2,600.000 $2,221.970
INSTALL SERVICE(PRIMARY/SECONDARY ONLY)
EA 16.000 $800.000 $3,332.960
INSTALL SERVICE (SECONDARY ONLY)
EA 9.000 $5,600.000 $1,666.480
TRANSFORMER (INSTALL ONLY)
EA 14.000 $2,000.000 $2,221.970
REMOVE POLE
EA 41.000 $200.000 $555.490
REMOVE CABLE
EA 49.000 $500.000 $1,110.990
REMOVE TRANSFORMER
EA 18.000 $500.000 $1,110.990
Totals: $11,675,760.250 $17,475,201.621