MCCULLOCH US 87 (0071-01-060)
Items: 23
County: MCCULLOCH
Length: 31.3280 MILES
Highway: US 87
District: BROWNWOOD
Control Number: 0071-01-060
DBE Goal: 0.0%
Project: C 71-1-60
Guaranty: $65,000.00
Time: 53 WORKING DAYS
Engineer's Estimate: $3,270,391.50
Date: 11/07/2024 (1 year ago)
Contract Number: 11243218
Type: PREVENTIVE MAINTENANCE
Project ID: A00178028
Project Description: MILL AND SEAL COAT
Mail/Deliver Bids To: N/A
BLAKE STEMBRIDGE
CASEY MCGEE
MCCULLOCH US 87 (0071-01-060)
Project Name: N/A
Project: C 71-1-60
Length: 31.3280 MILES
Project Type: SEAL COAT
Limits From: .5 MI S OF SH 71
Limits To: 1 MI. N OF SAN SABA RIVER
Project Description: MILL AND SEAL COAT
BROWN US 377 (0128-01-117)
Project Name: US377 FM45 TO MCCULLOCH C/L FY25 SC
Project: C 128-1-117
Length: 16.6420 MILES
Project Type: SEAL COAT
Limits From: FM 45
Limits To: MCCULLOCH C/L
Project Description: MILL AND SEAL COAT
MCCULLOCH US 87 (0071-02-033)
Project Name: US87 1MI N SAN SABA RVR TO MASON CL FY25
Project: C 71-2-33
Length: 5.7090 MILES
Project Type: SEAL COAT
Limits From: 1 MI N OF SAN SABA RIVER
Limits To: MASON C/L
Project Description: MILL AND SEAL COAT
BROWN FM 2524 (2377-01-050)
Project Name: FM2524 AVE K FM2126 FY26 SC
Project: C 2377-1-50
Length: 2.9770 MILES
Project Type: SEAL COAT
Limits From: AVE K
Limits To: FM2126
Project Description: MILL AND SEAL
Bidders (3)
| Bidder | Total Amount | Over/Under Est | Amt Left From Low Bid | Delta Between Bidders |
|---|---|---|---|---|
|
E
Engineer's Estimate
|
$3,270,391.50 | |||
| $3,936,577.18 |
20.37%
$666,185.68
|
|||
| $4,516,277.48 |
38.1%
$1,245,885.98
|
14.73%
$579,700.30
|
||
| $4,595,982.03 |
40.53%
$1,325,590.53
|
16.75%
$659,404.85
|
-1.76%
-$79,704.55
|
E
Engineer's Estimate
$3,270,391.50
1
Awarded
$3,936,577.18
Over/Under Est:
20.37%
$666,185.68
$4,516,277.48
Over/Under Est:
38.1%
$1,245,885.98
Amt Left:
14.73%
$579,700.30
$4,595,982.03
Over/Under Est:
40.53%
$1,325,590.53
Amt Left:
16.75%
$659,404.85
Delta:
-1.76%
-$79,704.55
| Subcontractor | Percentage | Amount |
|---|---|---|
| TEXOP CONSTRUCTION | 21.47% | $845,183.12 |
| FLAT LINE, INC. | 3.11% | $122,427.55 |
| TEXAS TRAFFIC AND BARRICADE, LLC | 1.14% | $44,876.98 |
| BARRICADES PLUS, LLC | 1.10% | $43,302.35 |
| RED SIXTEEN CONSTRUCTION, INC | 0.00% | $0.00 |
| Total: | 26.82% | $1,055,790.00 |