MATAGORDA SH0060 (6308-41-001)

Items: 48

County: MATAGORDA
Length: N/A
Highway: SH0060
District: YOAKUM
Control Number: 6308-41-001
DBE Goal: N/A
Project: RMC - 630841001
Guaranty: N/A
Time: 90 W
Engineer's Estimate: $597,230.00
Date: 09/07/2017 (8 years ago)
Contract Number: N/A
Type: STRUCTURE IMPROVEMENTS
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice HCS Excel Tabs Print Print Notice
Pay Estimates:
Bidders (3)
E
Engineer's Estimate
$597,230.00
$827,505.00
Over/Under Est: 38.56% $230,275.00
Over/Under Est: 48.58% $290,112.50
Amt Left: 7.23% $59,837.50
Over/Under Est: 62.88% $375,530.00
Amt Left: 17.55% $145,255.00
Delta: -9.63% -$85,417.50

Bid Items & Bid Tabulations

48 Total 0 of 48
MATAGORDA  |  SH0060  |  YOAKUM  |  6308-41-001  |  09/07/2017  |  $597,230.00  |  RMC - 630841001  |  STRUCT IMPRVS  |  90 W
Item Code
Description
Unit
Quantity
Engineer's Estimate
CHAMPION INFRASTRUCTURE, LLC
BIG CREEK CONSTRUCTION, LTD.
DAN WILLIAMS COMPANY
EMBANKMENT (VEHICLE)(ORD COMP)(TY C)
CY 340.000 $30.000 $60.000 $50.000 $100.000
BLADING
HR 40.000 $150.000 $140.000 $100.000 $120.000
CELL FBR MLCH SEED(PERM)(RURAL)(CLAY)
AC 1.000 $2,000.000 $1,200.000 $1,000.000 $2,500.000
VEGETATIVE WATERING
MG 10.000 $50.000 $210.000 $50.000 $15.000
CEM STABIL BKFL
CY 74.000 $200.000 $190.000 $150.000 $220.000
CUT & RESTORING PAV
SY 69.000 $200.000 $240.000 $150.000 $245.000
TRENCH EXCAVATION PROTECTION
LF 150.000 $25.000 $42.000 $20.000 $20.000
RIPRAP (CONC)(5 IN)
CY 1.000 $450.000 $1,800.000 $1,500.000 $1,800.000
RIPRAP (STONE COMMON)(DRY)(18 IN)
CY 63.000 $200.000 $420.000 $425.000 $425.000
CMP (GAL STL 18 IN)
LF 8.000 $60.000 $120.000 $100.000 $150.000
CMP (GAL STL 24 IN)
LF 25.000 $65.000 $160.000 $120.000 $175.000
CONC BOX CULV (3 FT X 2 FT)
LF 14.000 $350.000 $540.000 $750.000 $1,500.000
CONC BOX CULV (3 FT X 3 FT)
LF 20.000 $400.000 $630.000 $800.000 $950.000
CONC BOX CULV (4 FT X 3 FT)
LF 8.000 $475.000 $680.000 $900.000 $1,300.000
CONC BOX CULV (5 FT X 3 FT)
LF 12.000 $500.000 $720.000 $1,050.000 $1,150.000
CONC BOX CULV (5 FT X 5 FT)
LF 53.000 $500.000 $700.000 $1,100.000 $1,050.000
CONC BOX CULV (6 FT X 3 FT)
LF 89.000 $400.000 $700.000 $1,400.000 $970.000
CONC BOX CULV (7 FT X 5 FT)
LF 20.000 $850.000 $950.000 $1,900.000 $1,200.000
CONC BOX CULV (8 FT X 3 FT)
LF 7.000 $600.000 $1,100.000 $2,500.000 $2,700.000
CONC BOX CULV (9FT X 4FT)
LF 8.000 $1,200.000 $1,300.000 $3,000.000 $2,700.000
RC PIPE (CL III)(18 IN)
LF 8.000 $65.000 $120.000 $160.000 $300.000
RC PIPE (CL III)(42 IN)
LF 86.000 $200.000 $260.000 $250.000 $385.000
WINGWALL (PW - 2) (HW=6 FT)
EA 1.000 $11,000.000 $9,000.000 $22,000.000 $28,000.000
SET (REPLACE PIPE RUNNER)
EA 8.000 $800.000 $1,500.000 $1,000.000 $1,000.000
SET (TY I)(S=3 FT)(HW=3FT)(3:1)(C)
EA 4.000 $4,500.000 $5,200.000 $5,000.000 $5,500.000
SET (TY I)(S=3 FT)(HW= 4 FT)(3:1)(C)
EA 1.000 $6,500.000 $9,000.000 $5,500.000 $8,300.000
SET (TY I)(S=3 FT)(HW= 4 FT)(6:1)(C)
EA 1.000 $5,000.000 $12,000.000 $5,800.000 $9,000.000
SET (TY I)(S= 4 FT)(HW= 4 FT)(3:1) (C)
EA 2.000 $6,500.000 $8,200.000 $6,200.000 $7,200.000
SET (TY I)(S= 5 FT)(HW= 4 FT)(3:1) (C)
EA 6.000 $6,800.000 $9,500.000 $6,500.000 $5,400.000
SET (TY I)(S= 5 FT)(HW= 6 FT)(3:1) (C)
EA 5.000 $6,800.000 $10,000.000 $7,000.000 $7,600.000
SET (TY I)(S= 6 FT)(HW= 4 FT)(3:1) (C)
EA 6.000 $6,500.000 $11,000.000 $7,500.000 $6,300.000
SET (TY I)(S= 7 FT)(HW= 6 FT)(3:1) (C)
EA 4.000 $8,000.000 $12,000.000 $8,700.000 $8,200.000
SET (TY I)(S= 8 FT)(HW= 4 FT)(3:1) (C)
EA 2.000 $6,000.000 $14,000.000 $9,100.000 $7,900.000
SET (TY I)(S= 9 FT)(HW= 5 FT)(3:1) (C)
EA 2.000 $10,000.000 $16,000.000 $10,800.000 $9,400.000
SET (TY II) (18 IN) (RCP) (3: 1) (C)
EA 2.000 $750.000 $2,100.000 $1,200.000 $1,400.000
SET (TY II) (42 IN) (RCP) (4: 1) (C)
EA 6.000 $3,000.000 $8,500.000 $5,000.000 $5,200.000
REMOV STR (PIPE)
EA 80.000 $500.000 $160.000 $20.000 $60.000
MOBILIZATION
LS 1.000 $54,000.000 $45,000.000 $87,100.000 $95,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 6.000 $4,000.000 $3,400.000 $10,000.000 $18,500.000
TEMP SEDMT CONT FENCE (INSTALL)
LF 1,030.000 $3.000 $8.000 $7.000 $6.000
TEMP SEDMT CONT FENCE (REMOVE)
LF 1,030.000 $1.000 $4.000 $0.750 $2.000
MTL W-BEAM GD FEN (TIM POST)
LF 275.000 $25.000 $23.000 $25.000 $45.000
MTL BM GD FEN (LONG SPAN SYSTEM)
LF 50.000 $25.000 $40.000 $30.000 $55.000
REMOVE METAL BEAM GUARD FENCE
LF 800.000 $2.500 $12.000 $5.000 $10.000
REMOVE TERMINAL ANCHOR SECTION
EA 4.000 $500.000 $450.000 $350.000 $600.000
GUARDRAIL END TREATMENT (INSTALL)
EA 2.000 $2,200.000 $2,900.000 $2,500.000 $4,200.000
INSTL OM ASSM (OM-2Z)(FLX)GND(BI)
EA 30.000 $50.000 $60.000 $40.000 $60.000
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI)
EA 12.000 $30.000 $60.000 $40.000 $60.000
Totals: $597,230.000 $827,505.000 $887,342.500 $972,760.000