MATAGORDA HAMMAN ST (0913-21-056)

Items: 92

County: MATAGORDA
Length: 0.1640 MILES
Highway: HAMMAN ST
District: YOAKUM
Control Number: 0913-21-056
DBE Goal: 0.0%
Project: BR 2024(087)
Guaranty: $91,000.00
Time: 268 WORKING DAYS
Engineer's Estimate: $4,523,383.75
Date: 10/08/2025 (8 months ago)
Contract Number: 10253016
Type: BRIDGE REPLACEMENT
Project ID: A00194184
Contract Type: Federal
Project Description: REPLACE BRIDGE AND APPROACHES
Mail/Deliver Bids To:
TEXAS DEPARTMENT OF TRANSPORTATION
ATTN: CONSTRUCTION DIVISION - RM M1C3.02
6230 E STASSNEY LN, AUSTIN, TX 78744
RYAN SIMPER
PAUL RODRIGUEZ
Actions:
Notice Questions HCS Excel Tabs Print Print Notice
Pay Estimates:
Bidders (5)
E
Engineer's Estimate
$4,523,383.75
$4,866,603.30
Over/Under Est: 7.59% $343,219.55
$4,876,748.00
Over/Under Est: 7.81% $353,364.25
Amt Left: 0.21% $10,144.70
$5,212,442.85
Over/Under Est: 15.23% $689,059.10
Amt Left: 7.11% $345,839.55
Delta: -6.88% -$335,694.85
Over/Under Est: 48.72% $2,203,568.40
Amt Left: 38.23% $1,860,348.85
Delta: -29.06% -$1,514,509.30
Over/Under Est: 50.08% $2,265,237.85
Amt Left: 39.49% $1,922,018.30
Delta: -0.92% -$61,669.45
Subcontractor Percentage Amount
GREGORY PILE DRIVING, INC. 8.64% $420,474.53
1 PRIORITY ENVIRONMENTAL SERVICES, LLC 2.02% $98,305.39
TRAFFIC SIGNS & LINES, LLC 1.56% $75,919.01
SYLVA CONSTRUCTION, LLC 1.28% $62,292.52
LONE STAR EROSION CONTROL 0.83% $40,392.81
FRANK JR REINFORCEMENT LLC 0.22% $10,706.53
HOUSTON SAWING & DRILLING 0.14% $6,813.24
Total: 14.69% $714,904.03

Bid Items & Bid Tabulations

92 Total 0 of 92
MATAGORDA  |  HAMMAN ST  |  YOAKUM  |  0913-21-056  |  10/08/2025  |  $4,523,383.75  |  BR 2024(087)  |  BRIDGE REPL  |  268 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
E-Z BEL CONSTRUCTION, LLC
STX CIVIL
C. E. BARKER, LTD.
RAGLE CONSTRUCTION, INC.
FORDE CONSTRUCTION COMPANY, INC.
PREPARING ROW
STA 8.700 $2,500.000 $1,800.000 $8,500.000 $55,000.000 $59,700.000 $15,000.000
REMOV CONC (PAV)
SY 1,178.000 $40.000 $38.000 $25.000 $14.030 $10.000 $56.000
EXCAV (ROADWAY)
CY 705.000 $22.000 $25.000 $20.000 $56.100 $75.000 $77.000
EXCAV (CHANNEL)
CY 1,332.000 $20.000 $25.000 $25.000 $34.780 $19.000 $69.000
EMBANK (FNL)(OC)(TY C)
CY 1,167.000 $30.000 $40.000 $50.000 $34.780 $30.000 $88.000
BLADING
HR 48.000 $120.000 $50.000 $100.000 $117.810 $177.000 $125.000
BLOCK SODDING
SY 2,373.000 $7.500 $8.000 $6.000 $11.220 $12.000 $13.000
BROADCAST SEED (PERM_RURAL_SAND)
SY 1,225.000 $1.000 $0.160 $1.000 $1.120 $1.000 $3.400
BROADCAST SEED (TEMP_WARM)
SY 902.000 $1.000 $1.000 $1.000 $1.120 $0.750 $3.000
BROADCAST SEED (TEMP_COOL)
SY 902.000 $1.000 $1.000 $1.000 $1.120 $0.750 $3.000
VEGETATIVE WATERING
TGL 46.500 $100.000 $72.000 $50.000 $117.810 $117.000 $93.000
FL BS (CMP IN PLC)(TY E GR 5)(FNAL POS)
CY 620.000 $129.000 $175.000 $130.000 $142.380 $134.000 $207.000
LIME (COM OR QK)(SLURRY)
TON 24.000 $430.000 $375.000 $470.000 $394.940 $352.000 $542.000
LIME TRT (EXIST MATL)(8")
SY 1,485.000 $8.250 $11.000 $14.000 $5.890 $7.100 $32.000
ASPH (RC-250)
GAL 465.000 $15.000 $18.000 $15.000 $11.220 $17.750 $6.000
AGGR (TY-E, GR-5)(SAC-B)
CY 19.500 $550.000 $1,000.000 $1,200.000 $841.500 $1,000.000 $1,100.000
AGGR (TY-PE, GR-4)(SAC-B)
CY 19.600 $1,300.000 $1,005.000 $1,250.000 $841.500 $1,005.000 $1,100.000
ASPH (AC 20-5TR OR AC-20XP OR CRS-2P)
GAL 790.000 $20.000 $15.000 $15.000 $11.220 $15.100 $5.000
D-GR HMA TY-B PG64-22
TON 413.000 $170.000 $181.000 $200.000 $196.350 $210.000 $262.000
D-GR HMA TY-D SAC-B PG70-22
TON 125.000 $225.000 $180.000 $200.000 $218.790 $290.000 $435.000
CONC PVMT (CPCD) (7")
SY 1,802.000 $100.000 $150.000 $110.000 $105.800 $70.500 $143.000
CEM STABIL BKFL
CY 1,137.000 $150.000 $360.000 $150.000 $98.180 $140.000 $170.000
TRENCH EXCAVATION PROTECTION
LF 244.000 $22.000 $1.000 $35.000 $46.000 $56.000 $5.000
TEMPORARY SPL SHORING
SF 2,800.000 $30.000 $4.000 $20.000 $33.660 $120.000 $55.000
TEMPORARY SPL SHORING (COFFERDAM)
SF 3,000.000 $30.000 $50.000 $50.000 $16.830 $70.000 $20.000
SHEET PILING (PZ - 40)
SF 5,381.000 $85.000 $90.000 $100.000 $76.550 $85.000 $138.000
PRESTR CONC PIL (18 IN SQ)
LF 924.000 $155.000 $250.000 $250.000 $303.650 $169.000 $350.000
DRILL SHAFT (30 IN)
LF 495.000 $360.000 $290.000 $360.000 $345.580 $299.000 $500.000
CL C CONC (ABUT)
CY 73.000 $1,200.000 $1,000.000 $1,350.000 $2,401.080 $1,052.000 $3,900.000
CL C CONC (RAIL FOUNDATION)
CY 69.500 $1,000.000 $400.000 $1,300.000 $830.280 $680.000 $1,400.000
CL C CONC (MISC)
CY 3.700 $1,500.000 $509.000 $1,000.000 $830.280 $870.000 $1,800.000
REINF CONC SLAB (BOX BEAM)
SF 4,755.000 $30.000 $20.000 $30.000 $37.610 $25.000 $34.000
BRIDGE SIDEWALK
SF 467.000 $25.000 $10.000 $35.000 $10.380 $17.000 $67.000
SHEAR KEY
CY 36.100 $700.000 $805.000 $850.000 $392.700 $554.000 $250.000
PRESTR CONC BOX BEAM (4B20)
LF 238.000 $300.000 $325.000 $340.000 $299.800 $303.000 $410.000
PRESTR CONC BOX BEAM (5B20)
LF 119.000 $325.000 $325.000 $340.000 $299.800 $369.000 $436.000
PRESTR CONC BOX BEAM (5B28)
LF 625.500 $370.000 $325.000 $340.000 $337.100 $320.000 $420.000
RIPRAP (STONE PROTECTION)(18 IN)
CY 818.000 $200.000 $350.000 $220.000 $163.810 $209.000 $330.000
STR STEEL (MISC NON-BRIDGE)
LB 140.000 $30.000 $32.000 $20.000 $28.050 $33.000 $60.000
RAIL (TY T223)
LF 152.000 $195.000 $160.000 $200.000 $180.920 $134.000 $225.000
RAIL (TY C223)
LF 411.400 $75.000 $140.000 $240.000 $309.950 $165.000 $252.000
ARMOR JOINT (SEALED)
LF 112.000 $150.000 $108.000 $160.000 $112.200 $120.000 $230.000
CONC BOX CULV (9 FT X 9 FT)
LF 558.000 $1,750.000 $1,550.000 $1,700.000 $1,613.820 $1,640.000 $2,000.000
RC PIPE (CL III)(18 IN)
LF 124.000 $150.000 $140.000 $102.000 $104.860 $121.000 $120.000
RC PIPE (CL III)(24 IN)
LF 103.000 $170.000 $205.000 $120.000 $116.270 $137.000 $150.000
RC PIPE (CL III)(42 IN)
LF 25.000 $200.000 $318.000 $280.000 $218.880 $323.000 $530.000
RC PIPE (CL III)(54 IN)
LF 90.000 $400.000 $490.000 $575.000 $369.900 $501.000 $478.000
RC PIPE (CL III)(60 IN)
LF 78.000 $450.000 $561.000 $675.000 $413.140 $576.000 $555.000
JCTBOX(COMPL)(PJB)(3FTX3FT)
EA 1.000 $6,500.000 $13,482.000 $2,800.000 $7,923.000 $5,100.000 $13,000.000
INLET (COMPL)(PSL)(RC)(3FTX3FT)
EA 1.000 $7,500.000 $13,936.000 $8,000.000 $12,320.680 $8,820.000 $15,200.000
INLET (COMPL)(PSL)(FG)(3FTX3FT-3FTX3FT)
EA 3.000 $8,500.000 $8,557.000 $4,000.000 $8,953.000 $5,800.000 $15,300.000
INLET (COMPL)(PSL)(FG)(4FTX5FT-4FTX4FT)
EA 1.000 $10,000.000 $15,020.000 $22,000.000 $13,562.740 $18,000.000 $18,000.000
SET (TY II) (18 IN) (RCP) (6: 1) (P)
EA 2.000 $2,750.000 $2,085.000 $1,300.000 $3,146.420 $2,350.000 $2,800.000
SET (TY II) (24 IN) (RCP) (6: 1) (P)
EA 1.000 $3,000.000 $2,939.000 $2,300.000 $3,700.800 $3,100.000 $6,600.000
REMOV STR (MANHOLE)
EA 2.000 $1,200.000 $3,802.000 $500.000 $701.250 $1,300.000 $12,000.000
REMOV STR (BRIDGE 0 - 99 FT LENGTH)
EA 3.000 $25,000.000 $32,000.000 $30,000.000 $41,233.500 $400,000.000 $50,000.000
REMOV STR (SMALL)
EA 11.000 $1,500.000 $1,354.000 $250.000 $1,178.100 $5,000.000 $1,200.000
MOBILIZATION
LS 1.000 $410,000.000 $300,000.000 $360,000.000 $450,000.000 $600,000.000 $660,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 18.000 $2,500.000 $1,500.000 $2,800.000 $3,646.500 $10,000.000 $2,500.000
PORTABLE CHANGEABLE MESSAGE SIGN
EA 2.000 $10,000.000 $2,500.000 $1.000 $22,440.000 $12,000.000 $14,000.000
ROCK FILTER DAMS (INSTALL) (TY 1)
CY 18.000 $320.000 $150.000 $280.000 $56.100 $150.000 $400.000
ROCK FILTER DAMS (REMOVE)
CY 18.000 $70.000 $65.000 $10.000 $22.440 $65.000 $144.000
SANDBAGS FOR EROSION CONTROL
EA 90.000 $21.500 $16.000 $1.000 $22.440 $16.000 $11.000
TEMP SEDMT CONT FENCE (INSTALL)
LF 1,471.000 $4.000 $5.000 $1.000 $5.610 $5.000 $8.000
TEMP SEDMT CONT FENCE (REMOVE)
LF 1,471.000 $1.000 $3.000 $1.000 $2.240 $2.500 $2.300
BIODEG EROSN CONT LOGS (INSTL) (6")
LF 100.000 $7.500 $10.000 $1.000 $11.220 $10.000 $14.000
BIODEG EROSN CONT LOGS (INSTL) (8")
LF 65.000 $7.500 $10.000 $1.000 $16.830 $10.000 $14.000
BIODEG EROSN CONT LOGS (REMOVE)
LF 165.000 $2.500 $5.000 $1.000 $8.980 $5.000 $3.000
CONC CURB (MONO) (TY II)
LF 486.000 $30.000 $23.000 $30.000 $8.420 $15.000 $28.000
CONC CURB & GUTTER (TY II)
LF 33.000 $90.000 $34.000 $50.000 $8.420 $45.000 $250.000
CONC CURB & GUTTER (SLOTTED)
LF 260.000 $60.000 $45.000 $60.000 $8.420 $34.000 $45.000
DRIVEWAYS (ACP)
SY 190.000 $60.000 $75.000 $110.000 $56.100 $84.000 $150.000
CONC SIDEWALKS (5")
SY 287.000 $105.000 $150.000 $95.000 $103.790 $73.000 $120.000
CURB RAMPS (TY 7)
SY 8.000 $220.000 $2,958.000 $280.000 $103.790 $241.000 $630.000
CURB RAMPS (TY 10)
SY 25.000 $220.000 $2,800.000 $280.000 $103.790 $362.000 $380.000
MTL W-BEAM GD FEN (TIM POST)
LF 50.000 $40.000 $36.000 $32.000 $39.270 $36.450 $64.000
MTL BEAM GD FEN TRANS (TL2)
EA 4.000 $1,500.000 $1,855.000 $1,800.000 $2,805.000 $1,855.000 $3,300.000
DOWNSTREAM ANCHOR TERMINAL SECTION
EA 2.000 $1,750.000 $1,290.000 $1,500.000 $2,805.000 $1,290.000 $2,300.000
GUARDRAIL END TREATMENT (INSTALL)
EA 2.000 $3,500.000 $3,650.000 $3,400.000 $3,927.000 $3,650.000 $6,400.000
IN SM RD SN SUP&AM TYTWT(1)WS(P)
EA 5.000 $525.000 $810.000 $1,000.000 $841.500 $550.000 $960.000
INSTL DEL ASSM (D-SW)SZ 1(BRF)CTB (BI)
EA 18.000 $25.000 $21.000 $35.000 $56.100 $24.500 $43.000
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI)
EA 6.000 $75.000 $28.000 $35.000 $56.100 $30.000 $52.000
REMOVE DELIN & OBJECT MARKER ASSMS
EA 8.000 $25.000 $55.000 $1.000 $22.440 $55.000 $33.000
INSTL DEL ASSM (D-SW)SZ 1(WFLX)GNDLL
EA 12.000 $60.000 $106.000 $485.000 $56.100 $70.000 $123.000
INSTL OM ASSM (OM-2Y)(WC)GNDLL
EA 2.000 $125.000 $195.000 $485.000 $56.100 $84.000 $147.000
INSTL OM ASSM (OM-3L)(TWT)GNDLL
EA 4.000 $375.000 $390.000 $485.000 $56.100 $265.000 $463.000
INSTL OM ASSM (OM-3R)(TWT)GNDLL
EA 4.000 $375.000 $390.000 $485.000 $56.100 $265.000 $463.000
RE PM TY II (W) 6" (SLD)
LF 720.000 $1.500 $2.000 $1.800 $13.460 $2.000 $2.500
RE PM TY II (Y) 6" (SLD)
LF 720.000 $1.500 $2.000 $1.800 $13.460 $2.000 $2.500
REFL PAV MRK TY I (W)6"(SLD)(090MIL)
LF 720.000 $2.500 $3.000 $3.500 $13.460 $2.500 $5.300
REFL PAV MRK TY I (Y)6"(SLD)(090MIL)
LF 720.000 $2.500 $3.000 $3.500 $13.460 $2.500 $5.300
PAV SURF PREP FOR MRK (6")
LF 280.000 $3.600 $1.000 $0.100 $5.610 $1.000 $0.100
Totals: $4,523,383.750 $4,866,603.300 $4,876,748.000 $5,212,442.841 $6,726,952.150 $6,788,621.600
INCLUDES FORCE ACCOUNT WORK AMOUNTS AS FOLLOWS:
Description Amount
EROSION CONTROL MAINTENANCE: CONTRACTOR FORCE ACCOUNT WORK (PART) $1,500.00
SAFETY CONTINGENCY: CONTRACTOR FORCE ACCOUNT WORK (PART) $1,000.00
Total: $2,500.00