Show Job Controls
Bid Cobra

MATAGORDA CR (0913-21-052)

Items: 37

County: MATAGORDA
Length: N/A
Highway: CR
District: YOAKUM
Control Number: 0913-21-052
DBE Goal: N/A
Project: BR 2021(796)
Guaranty: N/A
Time: 60 WORKING DAYS
Engineer's Estimate: $488,629.85
Date: 10/07/2022 (3 years ago)
Contract Number: N/A
Type: BRIDGE REPLACEMENT
Mail/Deliver Bids To: N/A
RYAN SIMPER
JEFFREY KALINA
Actions:
Notice HCS Excel Tabs Print Print Notice
Pay Estimates:
Bidders (2)
E
Engineer's Estimate
$488,629.85
$648,611.35
Over/Under Est: 32.74% $159,981.50
Over/Under Est: 40.12% $196,042.85
Amt Left: 5.56% $36,061.35

Bid Items & Bid Tabulations

37 Total 0 of 37
MATAGORDA  |  CR  |  YOAKUM  |  0913-21-052  |  10/07/2022  |  $488,629.85  |  BR 2021(796)  |  BRIDGE REPL  |  60 WORKING DAYS
Alt
Item Code
Description
Unit
Quantity
Engineer's Estimate
LUCANIA CONSTRUCTION LLC
A GREATER AUSTIN DEVELOPMENT COMPANY, LLC
PREPARING ROW
STA 1.500 $3,500.000 $5,000.000 $9,000.000
EXCAVATION (ROADWAY)
CY 58.000 $25.000 $100.000 $58.000
EXCAVATION (CHANNEL)
CY 213.000 $25.000 $30.000 $65.000
EMBANKMENT (FINAL)(ORD COMP)(TY C)
CY 260.000 $25.000 $40.000 $58.000
BLADING
HR 8.000 $150.000 $500.000 $150.000
BROADCAST SEED (PERM) (RURAL) (CLAY)
SY 338.000 $3.000 $6.000 $1.000
BROADCAST SEED (TEMP) (WARM)
SY 86.000 $2.000 $9.000 $1.000
BROADCAST SEED (TEMP) (COOL)
SY 86.000 $2.000 $9.000 $1.000
VEGETATIVE WATERING
MG 3.400 $75.000 $100.000 $500.000
FL BS (CMP IN PLC)(TY A GR 5)(FNAL POS)
CY 174.000 $125.000 $180.000 $293.000
CEM STABIL BKFL
CY 86.000 $150.000 $190.000 $225.000
DRILL SHAFT (24 IN)
LF 354.000 $350.000 $330.000 $300.000
CL C CONC (ABUT)
CY 23.600 $1,200.000 $2,200.000 $1,200.000
REINF CONC SLAB (SLAB BEAM)
SF 1,504.000 $25.000 $35.000 $26.000
PRESTR CONC SLAB BEAM (5SB15)
LF 296.890 $165.000 $315.000 $230.000
RIPRAP (STONE PROTECTION)(18 IN)
CY 235.000 $175.000 $220.000 $480.000
RAIL (TY T223)
LF 124.000 $125.000 $180.000 $217.000
ARMOR JOINT (SEALED)
LF 54.000 $150.000 $200.000 $215.000
SET (TY II) (30 IN) (HDPE) (6: 1) (P)
EA 2.000 $3,500.000 $0.000 $0.000
REMOV STR (BRIDGE 0 - 99 FT LENGTH)
EA 1.000 $25,000.000 $20,000.000 $13,000.000
REMOV STR (PIPE)
EA 2.000 $350.000 $2,000.000 $2,800.000
MOBILIZATION
LS 1.000 $44,000.000 $55,000.000 $70,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 4.000 $3,000.000 $2,000.000 $4,000.000
TEMP SEDMT CONT FENCE (INSTALL)
LF 230.000 $4.000 $7.000 $9.000
TEMP SEDMT CONT FENCE (REMOVE)
LF 230.000 $2.000 $5.000 $6.000
MTL BEAM GD FEN TRANS (THRIE-BEAM)
EA 1.000 $2,300.000 $3,500.000 $3,466.000
MTL BEAM GD FEN TRANS (TL2)
EA 1.000 $2,000.000 $3,000.000 $1,922.000
SHORT RADIUS
LF 50.000 $45.000 $140.000 $73.000
DRIVEWAY TERMINAL ANCHOR SECTION
EA 2.000 $900.000 $1,700.000 $1,320.000
DOWNSTREAM ANCHOR TERMINAL SECTION
EA 1.000 $1,450.000 $2,870.000 $2,204.000
MTL BEAM GD FEN TRANS (TL2) 28"
EA 2.000 $1,200.000 $1,150.000 $1,360.000
GUARDRAIL END TREATMENT (INSTALL)
EA 1.000 $3,500.000 $4,200.000 $4,033.000
INSTL DEL ASSM (D-SW)SZ (BRF)CTB (BI)
EA 4.000 $50.000 $35.000 $22.000
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI)
EA 5.000 $50.000 $35.000 $22.000
THERMO PIPE(30")(PP)(TY S)(TY II)
LF 208.000 $110.000 $0.000 $0.000
1
RC PIPE (CL III)(30 IN)
LF 208.000 $110.000 $160.000 $154.000
1
SET (TY II) (30 IN) (RCP) (6: 1) (P)
EA 2.000 $3,500.000 $6,800.000 $5,500.000
Totals: $518,509.850 $648,611.350 $684,672.700