MATAGORDA CR (0913-21-048)

Items: 47

County: MATAGORDA
Length: N/A
Highway: CR
District: YOAKUM
Control Number: 0913-21-048
DBE Goal: N/A
Project: BR 2018(625)
Guaranty: N/A
Time: 164 WORKING DAYS
Engineer's Estimate: $1,976,434.20
Date: 08/07/2019 (6 years ago)
Contract Number: N/A
Type: REPLACE BRIDGE AND APPROACHES
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice HCS Excel Tabs Print Print Notice
Bidders (1)
E
Engineer's Estimate
$1,976,434.20
$2,769,565.10
Over/Under Est: 40.13% $793,130.90

Bid Items & Bid Tabulations

47 Total 0 of 47
MATAGORDA  |  CR  |  YOAKUM  |  0913-21-048  |  08/07/2019  |  $1,976,434.20  |  BR 2018(625)  |  REPLACE BRIDGE AND APPROACHES  |  164 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
FUSED INDUSTRIES, LLC
PREPARING ROW
STA 6.000 $3,000.000 $7,000.000
EXCAVATION (ROADWAY)
CY 272.000 $20.000 $40.000
EMBANKMENT (FINAL)(DENS CONT)(TY C)
CY 321.000 $30.000 $90.000
BLADING
HR 32.000 $100.000 $575.000
BROADCAST SEED (PERM) (RURAL) (CLAY)
SY 1,756.000 $1.000 $1.000
BROADCAST SEED (TEMP) (WARM)
SY 439.000 $1.000 $3.400
BROADCAST SEED (TEMP) (COOL)
SY 439.000 $1.000 $3.400
VEGETATIVE WATERING
MG 15.700 $50.000 $800.000
FL BS (CMP IN PLC)(TY A GR 5)(FNAL POS)
CY 462.000 $110.000 $100.000
ASPH (RC-250)
GAL 251.000 $15.000 $80.000
AGGR(TY-E GR-5 SAC-B)
CY 9.000 $200.000 $110.000
AGGR(TY-PE GR-4 SAC-B)
CY 9.700 $210.000 $130.000
ASPH (AC-15P OR AC-10-2TR OR CRS-2P)
GAL 427.000 $10.000 $130.000
CEM STABIL BKFL
CY 126.000 $100.000 $95.000
SHEET PILING (NZ-38)
SF 15,088.000 $55.000 $55.000
PRESTR CONC PIL (18 IN SQ)
LF 926.000 $120.000 $135.000
DRILL SHAFT (18 IN)
LF 116.000 $75.000 $124.000
DRILL SHAFT (36 IN)
LF 431.000 $180.000 $461.000
CL C CONC (ABUT)
CY 76.400 $1,000.000 $1,812.000
CL C CONC (BENT)(HPC)(MASS)
CY 13.200 $1,000.000 $2,282.000
CL C CONC (CAP)
CY 20.900 $1,000.000 $3,376.000
CL C CONC (COLUMN)(HPC)
CY 7.100 $1,200.000 $2,347.000
REINF CONC SLAB
SF 3,360.000 $19.000 $42.000
REINF CONC SLAB (SLAB BEAM)
SF 3,900.000 $19.000 $36.000
PRESTR CONC SLAB BEAM (5SB12)
LF 742.500 $175.000 $177.000
PRESTR CONC GIRDER (TX28)
LF 415.180 $140.000 $245.000
RIPRAP (CONC)(CL B)(5 IN)
CY 26.000 $450.000 $930.000
RIPRAP (STONE PROTECTION)(12 IN)
CY 157.000 $140.000 $267.000
RAIL (TY T223)
LF 262.000 $100.000 $250.000
RAIL (TY T631)
LF 324.000 $85.000 $80.000
ARMOR JOINT (SEALED)
LF 106.000 $85.000 $90.000
REMOV STR (BRIDGE 0 - 99 FT LENGTH)
EA 1.000 $35,000.000 $46,000.000
REMOV STR (BRIDGE 100 - 499 FT LENGTH)
EA 1.000 $45,000.000 $74,000.000
REMOV STR (RET WALL)
LF 183.000 $55.000 $174.000
MOBILIZATION
LS 1.000 $120,000.000 $122,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 11.000 $2,500.000 $3,000.000
ROCK FILTER DAMS (INSTALL) (TY 1)
LF 119.000 $30.000 $60.000
ROCK FILTER DAMS (REMOVE)
LF 119.000 $11.000 $30.000
TEMP SEDMT CONT FENCE (INSTALL)
LF 1,361.000 $3.000 $7.000
TEMP SEDMT CONT FENCE (REMOVE)
LF 1,361.000 $1.000 $2.000
MTL W-BEAM GD FEN (TIM POST)
LF 212.500 $25.000 $30.000
MTL BEAM GD FEN TRANS (THRIE-BEAM)
EA 4.000 $1,800.000 $1,700.000
GUARDRAIL END TREATMENT (INSTALL)
EA 8.000 $2,800.000 $3,900.000
WIRE FENCE (TY A)
LF 456.000 $20.000 $30.000
REMOVE SM RD SN SUP&AM
EA 4.000 $75.000 $600.000
INSTL DEL ASSM (D-SW)SZ (BRF)CTB (BI)
EA 12.000 $15.000 $800.000
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI)
EA 18.000 $20.000 $600.000
Totals: $1,976,434.200 $2,769,565.100