EMBANKMENT (VEHICLE)(ORD COMP)(TY C)
|
CY
|
300.000
|
$35.000
|
$70.000
|
|
|
BLADING
|
HR
|
24.000
|
$120.000
|
$180.000
|
|
|
FURNISHING AND PLACING TOPSOIL (6")
|
SY
|
1,502.000
|
$2.500
|
$8.000
|
|
|
BROADCAST SEED (PERM) (RURAL) (SANDY)
|
SY
|
1,502.000
|
$3.000
|
$4.000
|
|
|
VEGETATIVE WATERING
|
MG
|
0.500
|
$100.000
|
$1,000.000
|
|
|
FL BS (CMP IN PLC)(TYA GR1-2) (6")
|
SY
|
846.000
|
$18.000
|
$45.000
|
|
|
TRENCH EXCAVATION PROTECTION
|
LF
|
669.000
|
$7.500
|
$100.000
|
|
|
TREATED TIMBER PILING
|
LF
|
30.000
|
$300.000
|
$500.000
|
|
|
CONC BOX CULV (7 FT X 4 FT)
|
LF
|
67.000
|
$710.000
|
$1,612.400
|
|
|
CONC BOX CULV (12 FT X 8 FT)
|
LF
|
505.000
|
$1,000.000
|
$4,567.000
|
|
|
CONC BOX CULV (7 FT X 4 FT)(EXTEND)
|
LF
|
18.000
|
$850.000
|
$2,064.300
|
|
|
CONC BOX CULV (10 FT X 8 FT)(EXTEND)
|
LF
|
27.000
|
$1,900.000
|
$2,460.200
|
|
|
RC PIPE (CL III)(24 IN)
|
LF
|
75.000
|
$95.000
|
$170.300
|
|
|
RC PIPE (CL III)(36 IN)
|
LF
|
19.000
|
$150.000
|
$251.800
|
|
|
RC PIPE (CL III)(42 IN)
|
LF
|
38.000
|
$200.000
|
$352.400
|
|
|
INLET (COMPL)(PSL)(FG)(3FTX3FT-3FTX3FT)
|
EA
|
14.000
|
$5,290.000
|
$7,582.600
|
|
|
JCT BOX (STAGE II) (PJB) (8 FT X 8 FT)
|
EA
|
1.000
|
$7,000.000
|
$71,562.000
|
|
|
SET (TY I)(S=10 FT)(HW=5FT)(6:1)(C)
|
EA
|
1.000
|
$13,000.000
|
$49,856.000
|
|
|
SET (TY I)(S= 7 FT)(HW= 4 FT)(6:1) (C)
|
EA
|
1.000
|
$10,500.000
|
$41,872.000
|
|
|
SET (TY II) (24 IN) (RCP) (6: 1) (P)
|
EA
|
2.000
|
$2,600.000
|
$3,859.600
|
|
|
SET (TY II) (36 IN) (RCP) (6: 1) (P)
|
EA
|
1.000
|
$4,150.000
|
$4,986.200
|
|
|
SET (TY II) (42 IN) (RCP) (6: 1) (P)
|
EA
|
1.000
|
$7,500.000
|
$6,894.800
|
|
|
REMOV STR (INLET)
|
EA
|
5.000
|
$550.000
|
$1,500.000
|
|
|
REMOV STR (MANHOLE)
|
EA
|
1.000
|
$875.000
|
$1,500.000
|
|
|
REMOV STR (PIPE)
|
LF
|
133.000
|
$27.000
|
$35.000
|
|
|
REMOV STR (BOX CULVERT)
|
LF
|
1,000.000
|
$160.000
|
$120.000
|
|
|
REMOV STR (TIMBER DOCK)
|
EA
|
1.000
|
$5,000.000
|
$3,500.000
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$141,000.000
|
$427,500.000
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
8.000
|
$3,000.000
|
$2,800.000
|
|
|
TEMP SEDMT CONT FENCE (INSTALL)
|
LF
|
320.000
|
$3.000
|
$6.000
|
|
|
TEMP SEDMT CONT FENCE (REMOVE)
|
LF
|
320.000
|
$1.000
|
$1.000
|
|
|
PORT CTB (FUR & INST)(LOW PROF)(TY 1)
|
LF
|
200.000
|
$44.000
|
$140.000
|
|
|
PORT CTB (FUR & INST)(LOW PROF)(TY 2)
|
LF
|
40.000
|
$44.000
|
$140.000
|
|
|
PORT CTB (MOVE)(LOW PROF)(TY 1)
|
LF
|
200.000
|
$8.000
|
$20.000
|
|
|
PORT CTB (MOVE)(LOW PROF)(TY 2)
|
LF
|
40.000
|
$9.000
|
$20.000
|
|
|
PORT CTB (REMOVE)(LOW PROF)(TY 1)
|
LF
|
200.000
|
$20.000
|
$20.000
|
|
|
PORT CTB (REMOVE)(LOW PROF)(TY 2)
|
LF
|
40.000
|
$9.000
|
$20.000
|
|
|
DRIVEWAYS (CONC)
|
SY
|
846.000
|
$80.000
|
$140.000
|
|
|
REMOVE METAL BEAM GUARD FENCE
|
LF
|
388.000
|
$5.000
|
$5.000
|
|
|
GUARDRAIL END TREATMENT (REMOVE)
|
EA
|
8.000
|
$320.000
|
$500.000
|
|
WK ZN PAV MRK SHT TERM (TAB)TY W
|
EA
|
55.000
|
$4.000
|
$5.000
|
|
WK ZN PAV MRK SHT TERM (TAB)TY Y-2
|
EA
|
50.000
|
$4.000
|
$5.000
|
|
RE PM W/RET REQ TY I (W)4"(BRK)(100MIL)
|
LF
|
270.000
|
$1.000
|
$6.000
|
|
RE PM W/RET REQ TY I (W)4"(SLD)(100MIL)
|
LF
|
1,100.000
|
$1.000
|
$2.000
|
|
RE PM W/RET REQ TY I (Y)4"(SLD)(100MIL)
|
LF
|
1,100.000
|
$1.000
|
$2.000
|
|
REFL PAV MRKR TY I-C
|
EA
|
25.000
|
$7.500
|
$15.000
|
|
REFL PAV MRKR TY II-A-A
|
EA
|
30.000
|
$7.500
|
$15.000
|
|
|
TACK COAT
|
GAL
|
4,117.000
|
$5.000
|
$0.010
|
|
|
D-GR HMA TY-D SAC-B PG70-22 (EXEMPT)
|
TON
|
1,030.000
|
$250.000
|
$200.000
|
|
|
TMA (STATIONARY)
|
DAY
|
100.000
|
$350.000
|
$100.000
|
|
|
TMA (MOBILE OPERATION)
|
DAY
|
5.000
|
$350.000
|
$300.000
|
|
|
CASING (STEEL) (SANITARY SEWER) (16 IN)
|
LF
|
16.000
|
$220.000
|
$200.000
|
|
|
MANHOLE (SAN SEWER) ( 4' DIA)
|
EA
|
1.000
|
$11,500.000
|
$8,000.000
|
|
|
TIE EXIST SANITARY SEWER TO PROP MH
|
EA
|
3.000
|
$1,000.000
|
$2,000.000
|
|
|
ADJUSTING METER BOX
|
EA
|
2.000
|
$560.000
|
$800.000
|
|
Totals: |
$1,573,925.000
|
$4,002,343.270
|