MATAGORDA SH 35 (0179-04-104)

Items: 101

County: MATAGORDA
Length: N/A
Highway: SH 35
District: YOAKUM
Control Number: 0179-04-104
DBE Goal: N/A
Project: BR 2B24(073)
Guaranty: N/A
Time: 310 WORKING DAYS
Engineer's Estimate: $18,124,488.50
Date: 05/02/2024 (2 years ago)
Contract Number: N/A
Type: BRIDGE REPLACEMENT
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice Questions HCS Excel Tabs Print Print Notice
Bidders (2)
E
Engineer's Estimate
$18,124,488.50
$33,183,610.43
Over/Under Est: 83.09% $15,059,121.93
Over/Under Est: 94.97% $17,212,605.21
Amt Left: 6.49% $2,153,483.28

Bid Items & Bid Tabulations

101 Total 0 of 101
MATAGORDA  |  SH 35  |  YOAKUM  |  0179-04-104  |  05/02/2024  |  $18,124,488.50  |  BR 2B24(073)  |  BRIDGE REPL  |  310 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
MORTMARA CONSTRUCTION, INC.
KIEWIT INFRASTRUCTURE SOUTH CO.
PREPARING ROW
STA 4.000 $5,000.000 $250,000.000 $10,000.000
REMOVING CONC (RIPRAP)
SY 36.000 $25.000 $68.000 $150.000
EXCAVATION (ROADWAY)
CY 10,088.000 $18.000 $50.000 $25.000
EMBANKMENT (FINAL)(ORD COMP)(TY C)
CY 430.000 $27.000 $100.000 $95.000
EMBANKMENT (FINAL)(DENS CONT)(TY C)
CY 662.000 $27.000 $100.000 $70.000
BLADING
HR 16.000 $75.000 $160.000 $355.000
BROADCAST SEED (PERM) (RURAL) (SANDY)
SY 3,803.000 $1.000 $0.450 $0.510
BROADCAST SEED (TEMP) (WARM)
SY 951.000 $1.000 $0.350 $0.460
BROADCAST SEED (TEMP) (COOL)
SY 951.000 $1.000 $0.350 $0.460
VEGETATIVE WATERING
MG 33.000 $65.000 $40.000 $56.840
FL BS (CMP IN PLC)(TYE GR1-2)(FNAL POS)
CY 924.000 $125.000 $142.280 $200.000
LIME TRT (EXST MATL) (6")
SY 3,160.000 $6.000 $14.000 $6.370
LIME(HYD,COM OR QK)(SLRY)OR QK(DRY)
TON 37.700 $275.000 $350.000 $400.000
CEMENT
TON 22.700 $265.000 $350.000 $400.000
CEMENT TREAT (EXIST MATL) (6")
SY 3,160.000 $6.000 $14.000 $6.370
CEM TRT(PLNT MX) (CL N)(TY E)(GR 4)(6")
SY 6,317.000 $14.000 $40.120 $50.000
ASPHALT STAB BASE (GR 4)(PG 64)
TON 347.700 $120.000 $230.000 $255.440
ASPH (RC-250)
GAL 804.000 $10.000 $9.250 $16.980
AGGR(TY-E GR-5 SAC-B)
CY 29.000 $220.000 $1,320.000 $594.130
AGGR(TY-PE GR-3 SAC-B)
CY 47.000 $220.000 $1,320.000 $521.830
ASPH (AC 20-5TR OR AC-20XP OR CRS-2P)
GAL 1,608.000 $7.500 $20.000 $15.340
FLEXIBLE PAVEMENT STRUCTURE REPAIR(12")
SY 20.000 $125.000 $326.000 $427.190
CONC PVMT (CONT REINF - CRCP) (10")
SY 5,749.000 $110.000 $166.000 $170.000
CONC PVMT (CRCP)(JCT TERMINAL)(10")
SY 374.000 $120.000 $279.000 $225.000
CEM STABIL BKFL
CY 345.000 $190.000 $500.000 $250.000
TEMPORARY SPL SHORING (COFFERDAM)
SF 22,240.000 $30.000 $9.200 $1.000
DRILL SHAFT (18 IN)
LF 192.000 $150.000 $118.450 $500.000
DRILL SHAFT (36 IN)
LF 945.000 $310.000 $338.560 $700.000
DRILL SHAFT (42 IN)
LF 2,010.000 $375.000 $441.010 $760.000
DRILL SHAFT (84 IN)
LF 1,908.000 $950.000 $1,962.110 $2,730.000
CL C CONC (ABUT)
CY 123.700 $1,435.000 $3,200.000 $2,000.000
CL C CONC (CAP)
CY 478.500 $1,700.000 $3,500.000 $2,500.000
CL C CONC (CAP)(MASS)
CY 633.100 $1,900.000 $3,125.000 $3,600.000
CL C CONC (COLUMN)
CY 249.800 $1,750.000 $3,250.000 $2,100.000
CL C CONC (COLUMN)(MASS)
CY 500.600 $1,810.000 $2,350.000 $2,300.000
REINF CONC SLAB
SF 90,174.000 $28.000 $46.500 $58.000
APPROACH SLAB
CY 189.000 $815.000 $1,550.000 $1,315.000
PRESTR CONC GIRDER (TX28)
LF 2,059.240 $200.000 $326.000 $305.000
PRESTR CONC GIRDER (TX54)
LF 6,083.900 $200.000 $336.000 $345.000
PRESTR CONC GIRDER (TX70)
LF 3,594.240 $215.000 $411.000 $425.000
RIPRAP (CONC)(5 IN)
CY 83.000 $550.000 $575.000 $700.000
RIPRAP (STONE PROTECTION)(18 IN)
CY 1,513.000 $220.000 $221.500 $325.000
RIPRAP (MOW STRIP)(4 IN)
CY 61.000 $620.000 $675.000 $950.000
RAIL (TY SSTR) (W/DRAIN SLOTS)
LF 4,418.000 $100.000 $78.000 $120.000
SEALED EXPANSION JOINT (4 IN) (SEJ - M)
LF 467.000 $180.000 $215.000 $500.000
RC PIPE (CL III)(18 IN)
LF 20.000 $97.720 $150.000 $320.000
RC PIPE (CL III)(24 IN)
LF 51.000 $140.000 $150.000 $400.000
RC PIPE (CL IV)(18 IN)
LF 393.000 $155.000 $150.000 $360.000
RC PIPE (ARCH)(CL III)(DES 2)
LF 308.000 $244.000 $150.000 $500.000
SET (TY II) (24 IN) (RCP) (4: 1) (C)
EA 1.000 $2,200.000 $3,000.000 $7,500.000
REMOV STR (PIPE)
LF 701.000 $20.000 $18.000 $100.000
REMOV STR (BRIDGE 1000 FT OR GREATER)
EA 2.000 $400,000.000 $1,500,000.000 $1,022,163.000
REMOV STR (SMALL)
EA 2.000 $1,100.000 $1,600.000 $5,884.100
MOBILIZATION
LS 1.000 $1,642,000.000 $3,084,000.000 $3,201,587.200
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 18.000 $4,000.000 $25,100.000 $25,000.000
SANDBAGS FOR EROSION CONTROL
EA 5.000 $20.000 $30.000 $27.380
TEMP SEDMT CONT FENCE (INSTALL)
LF 2,507.000 $4.000 $3.750 $4.130
TEMP SEDMT CONT FENCE (REMOVE)
LF 2,507.000 $1.000 $2.000 $2.220
BIODEG EROSN CONT LOGS (INSTL) (12")
LF 80.000 $10.000 $8.500 $10.170
BIODEG EROSN CONT LOGS (REMOVE)
LF 80.000 $2.000 $2.000 $3.050
CONSTRUCTING DETOURS
SY 3,200.000 $110.000 $300.000 $250.000
PORT CTB (FUR & INST)(LOW PROF)(TY 1)
LF 2,760.000 $60.000 $100.000 $400.000
PORT CTB (FUR & INST)(LOW PROF)(TY 2)
LF 40.000 $60.000 $105.000 $400.000
PORT CTB (MOVE)(LOW PROF)(TY 1)
LF 2,680.000 $15.000 $6.000 $15.000
PORT CTB (MOVE)(LOW PROF)(TY 2)
LF 40.000 $15.000 $50.000 $15.000
PORT CTB (REMOVE)(LOW PROF)(TY 1)
LF 2,760.000 $20.000 $6.000 $15.000
PORT CTB (REMOVE)(LOW PROF)(TY 2)
LF 40.000 $20.000 $50.000 $15.000
MTL W-BEAM GD FEN (TIM POST)
LF 925.000 $27.000 $34.060 $27.090
MTL BEAM GD FEN TRANS (THRIE-BEAM)
EA 6.000 $2,500.000 $2,103.370 $1,910.600
REMOVE METAL BEAM GUARD FENCE
LF 1,050.000 $4.000 $6.000 $2.500
RM MTL BM GD FENCE TRANS (THRIE-BEAM)
EA 6.000 $275.000 $361.290 $204.220
MTL BM GD FEN (REMOVE & REINSTALL)
LF 175.000 $50.000 $21.620 $18.150
GUARDRAIL END TREATMENT (INSTALL)
EA 5.000 $3,200.000 $3,581.190 $3,614.710
GUARDRAIL END TREATMENT (MOVE & RESET)
EA 1.000 $1,000.000 $898.790 $1,429.550
GUARDRAIL END TREATMENT (REMOVE)
EA 5.000 $250.000 $491.930 $283.640
CONDT (PVC) (SCH 40) (4")
LF 62.000 $20.000 $287.000 $93.160
CONDT (RM) (4")
LF 1,862.000 $60.000 $163.000 $139.730
CONDT (HDPE) (1 1/4")
LF 2,793.000 $10.000 $101.000 $121.480
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
EA 2.000 $660.000 $550.000 $933.740
IN SM RD SN SUP&AM TY10BWG(2)SA(P)
EA 2.000 $1,200.000 $1,200.000 $1,216.250
IN SM RD SN SUP&AM TYTWT(1)WS(P)
EA 2.000 $600.000 $350.000 $351.710
IN SM RD SN SUP&AM TYTWT(1)WS(T)
EA 1.000 $600.000 $350.000 $377.810
IN BRIDGE MNT CLEARANCE SGN ASSM(TY N)
EA 10.000 $2,000.000 $2,200.000 $2,711.600
REMOVE SM RD SN SUP&AM
EA 7.000 $110.000 $565.000 $113.460
INSTL DEL ASSM (D-SW)SZ (BRF)CTB
EA 92.000 $35.000 $16.000 $13.610
INSTL DEL ASSM (D-SY)SZ (BRF)CTB
EA 92.000 $35.000 $16.000 $13.610
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2
EA 36.000 $35.000 $25.180 $21.560
INSTL DEL ASSM (D-SY)SZ 1(BRF)GF2
EA 20.000 $40.000 $25.180 $21.560
WK ZN PAV MRK REMOV (W)6"(BRK)
LF 1,540.000 $1.000 $0.480 $2.460
WK ZN PAV MRK REMOV (W)6"(SLD)
LF 22,084.000 $1.000 $0.480 $0.930
WK ZN PAV MRK REMOV (Y)6"(SLD)
LF 21,257.000 $1.000 $0.480 $0.930
RE PV MRK TY I(BLACK)6"(SHADOW)(100MIL)
LF 910.000 $2.400 $5.000 $2.740
RE PM W/RET REQ TY I (W)6"(BRK)(100MIL)
LF 2,450.000 $1.000 $2.000 $2.190
RE PM W/RET REQ TY I (W)6"(SLD)(100MIL)
LF 11,350.000 $1.000 $2.000 $1.000
RE PM W/RET REQ TY I (Y)6"(SLD)(100MIL)
LF 9,345.000 $1.000 $2.000 $1.000
REFL PAV MRKR TY II-C-R
EA 127.000 $6.000 $20.000 $6.570
PORTABLE CHANGEABLE MESSAGE SIGN
EA 2.000 $10,000.000 $21,270.000 $25,000.000
TMSP RADAR SPEED CONTROL MONITOR
EA 2.000 $9,000.000 $10,797.000 $15,000.000
TMA (STATIONARY)
DAY 20.000 $300.000 $400.000 $750.000
TMA (MOBILE OPERATION)
DAY 20.000 $300.000 $700.000 $975.000
PAVEMENT SEALER 6"
LF 9,040.000 $1.000 $0.780 $1.100
Totals: $18,124,488.500 $33,183,610.430 $35,337,093.718