PREPARING ROW
|
STA
|
4.000
|
$5,000.000
|
$250,000.000
|
$10,000.000
|
|
|
REMOVING CONC (RIPRAP)
|
SY
|
36.000
|
$25.000
|
$68.000
|
$150.000
|
|
|
EXCAVATION (ROADWAY)
|
CY
|
10,088.000
|
$18.000
|
$50.000
|
$25.000
|
|
|
EMBANKMENT (FINAL)(ORD COMP)(TY C)
|
CY
|
430.000
|
$27.000
|
$100.000
|
$95.000
|
|
|
EMBANKMENT (FINAL)(DENS CONT)(TY C)
|
CY
|
662.000
|
$27.000
|
$100.000
|
$70.000
|
|
|
BLADING
|
HR
|
16.000
|
$75.000
|
$160.000
|
$355.000
|
|
|
BROADCAST SEED (PERM) (RURAL) (SANDY)
|
SY
|
3,803.000
|
$1.000
|
$0.450
|
$0.510
|
|
|
BROADCAST SEED (TEMP) (WARM)
|
SY
|
951.000
|
$1.000
|
$0.350
|
$0.460
|
|
|
BROADCAST SEED (TEMP) (COOL)
|
SY
|
951.000
|
$1.000
|
$0.350
|
$0.460
|
|
|
VEGETATIVE WATERING
|
MG
|
33.000
|
$65.000
|
$40.000
|
$56.840
|
|
|
FL BS (CMP IN PLC)(TYE GR1-2)(FNAL POS)
|
CY
|
924.000
|
$125.000
|
$142.280
|
$200.000
|
|
|
LIME TRT (EXST MATL) (6")
|
SY
|
3,160.000
|
$6.000
|
$14.000
|
$6.370
|
|
|
LIME(HYD,COM OR QK)(SLRY)OR QK(DRY)
|
TON
|
37.700
|
$275.000
|
$350.000
|
$400.000
|
|
|
CEMENT
|
TON
|
22.700
|
$265.000
|
$350.000
|
$400.000
|
|
|
CEMENT TREAT (EXIST MATL) (6")
|
SY
|
3,160.000
|
$6.000
|
$14.000
|
$6.370
|
|
|
CEM TRT(PLNT MX) (CL N)(TY E)(GR 4)(6")
|
SY
|
6,317.000
|
$14.000
|
$40.120
|
$50.000
|
|
|
ASPHALT STAB BASE (GR 4)(PG 64)
|
TON
|
347.700
|
$120.000
|
$230.000
|
$255.440
|
|
|
ASPH (RC-250)
|
GAL
|
804.000
|
$10.000
|
$9.250
|
$16.980
|
|
|
AGGR(TY-E GR-5 SAC-B)
|
CY
|
29.000
|
$220.000
|
$1,320.000
|
$594.130
|
|
|
AGGR(TY-PE GR-3 SAC-B)
|
CY
|
47.000
|
$220.000
|
$1,320.000
|
$521.830
|
|
|
ASPH (AC 20-5TR OR AC-20XP OR CRS-2P)
|
GAL
|
1,608.000
|
$7.500
|
$20.000
|
$15.340
|
|
|
FLEXIBLE PAVEMENT STRUCTURE REPAIR(12")
|
SY
|
20.000
|
$125.000
|
$326.000
|
$427.190
|
|
|
CONC PVMT (CONT REINF - CRCP) (10")
|
SY
|
5,749.000
|
$110.000
|
$166.000
|
$170.000
|
|
|
CONC PVMT (CRCP)(JCT TERMINAL)(10")
|
SY
|
374.000
|
$120.000
|
$279.000
|
$225.000
|
|
|
CEM STABIL BKFL
|
CY
|
345.000
|
$190.000
|
$500.000
|
$250.000
|
|
|
TEMPORARY SPL SHORING (COFFERDAM)
|
SF
|
22,240.000
|
$30.000
|
$9.200
|
$1.000
|
|
|
DRILL SHAFT (18 IN)
|
LF
|
192.000
|
$150.000
|
$118.450
|
$500.000
|
|
|
DRILL SHAFT (36 IN)
|
LF
|
945.000
|
$310.000
|
$338.560
|
$700.000
|
|
|
DRILL SHAFT (42 IN)
|
LF
|
2,010.000
|
$375.000
|
$441.010
|
$760.000
|
|
|
DRILL SHAFT (84 IN)
|
LF
|
1,908.000
|
$950.000
|
$1,962.110
|
$2,730.000
|
|
|
CL C CONC (ABUT)
|
CY
|
123.700
|
$1,435.000
|
$3,200.000
|
$2,000.000
|
|
|
CL C CONC (CAP)
|
CY
|
478.500
|
$1,700.000
|
$3,500.000
|
$2,500.000
|
|
|
CL C CONC (CAP)(MASS)
|
CY
|
633.100
|
$1,900.000
|
$3,125.000
|
$3,600.000
|
|
|
CL C CONC (COLUMN)
|
CY
|
249.800
|
$1,750.000
|
$3,250.000
|
$2,100.000
|
|
|
CL C CONC (COLUMN)(MASS)
|
CY
|
500.600
|
$1,810.000
|
$2,350.000
|
$2,300.000
|
|
|
REINF CONC SLAB
|
SF
|
90,174.000
|
$28.000
|
$46.500
|
$58.000
|
|
|
APPROACH SLAB
|
CY
|
189.000
|
$815.000
|
$1,550.000
|
$1,315.000
|
|
|
PRESTR CONC GIRDER (TX28)
|
LF
|
2,059.240
|
$200.000
|
$326.000
|
$305.000
|
|
|
PRESTR CONC GIRDER (TX54)
|
LF
|
6,083.900
|
$200.000
|
$336.000
|
$345.000
|
|
|
PRESTR CONC GIRDER (TX70)
|
LF
|
3,594.240
|
$215.000
|
$411.000
|
$425.000
|
|
|
RIPRAP (CONC)(5 IN)
|
CY
|
83.000
|
$550.000
|
$575.000
|
$700.000
|
|
|
RIPRAP (STONE PROTECTION)(18 IN)
|
CY
|
1,513.000
|
$220.000
|
$221.500
|
$325.000
|
|
|
RIPRAP (MOW STRIP)(4 IN)
|
CY
|
61.000
|
$620.000
|
$675.000
|
$950.000
|
|
|
RAIL (TY SSTR) (W/DRAIN SLOTS)
|
LF
|
4,418.000
|
$100.000
|
$78.000
|
$120.000
|
|
|
SEALED EXPANSION JOINT (4 IN) (SEJ - M)
|
LF
|
467.000
|
$180.000
|
$215.000
|
$500.000
|
|
|
RC PIPE (CL III)(18 IN)
|
LF
|
20.000
|
$97.720
|
$150.000
|
$320.000
|
|
|
RC PIPE (CL III)(24 IN)
|
LF
|
51.000
|
$140.000
|
$150.000
|
$400.000
|
|
|
RC PIPE (CL IV)(18 IN)
|
LF
|
393.000
|
$155.000
|
$150.000
|
$360.000
|
|
|
RC PIPE (ARCH)(CL III)(DES 2)
|
LF
|
308.000
|
$244.000
|
$150.000
|
$500.000
|
|
|
SET (TY II) (24 IN) (RCP) (4: 1) (C)
|
EA
|
1.000
|
$2,200.000
|
$3,000.000
|
$7,500.000
|
|
|
REMOV STR (PIPE)
|
LF
|
701.000
|
$20.000
|
$18.000
|
$100.000
|
|
|
REMOV STR (BRIDGE 1000 FT OR GREATER)
|
EA
|
2.000
|
$400,000.000
|
$1,500,000.000
|
$1,022,163.000
|
|
|
REMOV STR (SMALL)
|
EA
|
2.000
|
$1,100.000
|
$1,600.000
|
$5,884.100
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$1,642,000.000
|
$3,084,000.000
|
$3,201,587.200
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
18.000
|
$4,000.000
|
$25,100.000
|
$25,000.000
|
|
|
SANDBAGS FOR EROSION CONTROL
|
EA
|
5.000
|
$20.000
|
$30.000
|
$27.380
|
|
|
TEMP SEDMT CONT FENCE (INSTALL)
|
LF
|
2,507.000
|
$4.000
|
$3.750
|
$4.130
|
|
|
TEMP SEDMT CONT FENCE (REMOVE)
|
LF
|
2,507.000
|
$1.000
|
$2.000
|
$2.220
|
|
|
BIODEG EROSN CONT LOGS (INSTL) (12")
|
LF
|
80.000
|
$10.000
|
$8.500
|
$10.170
|
|
|
BIODEG EROSN CONT LOGS (REMOVE)
|
LF
|
80.000
|
$2.000
|
$2.000
|
$3.050
|
|
|
CONSTRUCTING DETOURS
|
SY
|
3,200.000
|
$110.000
|
$300.000
|
$250.000
|
|
|
PORT CTB (FUR & INST)(LOW PROF)(TY 1)
|
LF
|
2,760.000
|
$60.000
|
$100.000
|
$400.000
|
|
|
PORT CTB (FUR & INST)(LOW PROF)(TY 2)
|
LF
|
40.000
|
$60.000
|
$105.000
|
$400.000
|
|
|
PORT CTB (MOVE)(LOW PROF)(TY 1)
|
LF
|
2,680.000
|
$15.000
|
$6.000
|
$15.000
|
|
|
PORT CTB (MOVE)(LOW PROF)(TY 2)
|
LF
|
40.000
|
$15.000
|
$50.000
|
$15.000
|
|
|
PORT CTB (REMOVE)(LOW PROF)(TY 1)
|
LF
|
2,760.000
|
$20.000
|
$6.000
|
$15.000
|
|
|
PORT CTB (REMOVE)(LOW PROF)(TY 2)
|
LF
|
40.000
|
$20.000
|
$50.000
|
$15.000
|
|
|
MTL W-BEAM GD FEN (TIM POST)
|
LF
|
925.000
|
$27.000
|
$34.060
|
$27.090
|
|
|
MTL BEAM GD FEN TRANS (THRIE-BEAM)
|
EA
|
6.000
|
$2,500.000
|
$2,103.370
|
$1,910.600
|
|
|
REMOVE METAL BEAM GUARD FENCE
|
LF
|
1,050.000
|
$4.000
|
$6.000
|
$2.500
|
|
|
RM MTL BM GD FENCE TRANS (THRIE-BEAM)
|
EA
|
6.000
|
$275.000
|
$361.290
|
$204.220
|
|
|
MTL BM GD FEN (REMOVE & REINSTALL)
|
LF
|
175.000
|
$50.000
|
$21.620
|
$18.150
|
|
|
GUARDRAIL END TREATMENT (INSTALL)
|
EA
|
5.000
|
$3,200.000
|
$3,581.190
|
$3,614.710
|
|
|
GUARDRAIL END TREATMENT (MOVE & RESET)
|
EA
|
1.000
|
$1,000.000
|
$898.790
|
$1,429.550
|
|
|
GUARDRAIL END TREATMENT (REMOVE)
|
EA
|
5.000
|
$250.000
|
$491.930
|
$283.640
|
|
|
CONDT (PVC) (SCH 40) (4")
|
LF
|
62.000
|
$20.000
|
$287.000
|
$93.160
|
|
|
CONDT (RM) (4")
|
LF
|
1,862.000
|
$60.000
|
$163.000
|
$139.730
|
|
|
CONDT (HDPE) (1 1/4")
|
LF
|
2,793.000
|
$10.000
|
$101.000
|
$121.480
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
|
EA
|
2.000
|
$660.000
|
$550.000
|
$933.740
|
|
|
IN SM RD SN SUP&AM TY10BWG(2)SA(P)
|
EA
|
2.000
|
$1,200.000
|
$1,200.000
|
$1,216.250
|
|
|
IN SM RD SN SUP&AM TYTWT(1)WS(P)
|
EA
|
2.000
|
$600.000
|
$350.000
|
$351.710
|
|
|
IN SM RD SN SUP&AM TYTWT(1)WS(T)
|
EA
|
1.000
|
$600.000
|
$350.000
|
$377.810
|
|
|
IN BRIDGE MNT CLEARANCE SGN ASSM(TY N)
|
EA
|
10.000
|
$2,000.000
|
$2,200.000
|
$2,711.600
|
|
|
REMOVE SM RD SN SUP&AM
|
EA
|
7.000
|
$110.000
|
$565.000
|
$113.460
|
|
|
INSTL DEL ASSM (D-SW)SZ (BRF)CTB
|
EA
|
92.000
|
$35.000
|
$16.000
|
$13.610
|
|
|
INSTL DEL ASSM (D-SY)SZ (BRF)CTB
|
EA
|
92.000
|
$35.000
|
$16.000
|
$13.610
|
|
|
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2
|
EA
|
36.000
|
$35.000
|
$25.180
|
$21.560
|
|
|
INSTL DEL ASSM (D-SY)SZ 1(BRF)GF2
|
EA
|
20.000
|
$40.000
|
$25.180
|
$21.560
|
|
|
WK ZN PAV MRK REMOV (W)6"(BRK)
|
LF
|
1,540.000
|
$1.000
|
$0.480
|
$2.460
|
|
|
WK ZN PAV MRK REMOV (W)6"(SLD)
|
LF
|
22,084.000
|
$1.000
|
$0.480
|
$0.930
|
|
|
WK ZN PAV MRK REMOV (Y)6"(SLD)
|
LF
|
21,257.000
|
$1.000
|
$0.480
|
$0.930
|
|
RE PV MRK TY I(BLACK)6"(SHADOW)(100MIL)
|
LF
|
910.000
|
$2.400
|
$5.000
|
$2.740
|
|
RE PM W/RET REQ TY I (W)6"(BRK)(100MIL)
|
LF
|
2,450.000
|
$1.000
|
$2.000
|
$2.190
|
|
RE PM W/RET REQ TY I (W)6"(SLD)(100MIL)
|
LF
|
11,350.000
|
$1.000
|
$2.000
|
$1.000
|
|
RE PM W/RET REQ TY I (Y)6"(SLD)(100MIL)
|
LF
|
9,345.000
|
$1.000
|
$2.000
|
$1.000
|
|
REFL PAV MRKR TY II-C-R
|
EA
|
127.000
|
$6.000
|
$20.000
|
$6.570
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
EA
|
2.000
|
$10,000.000
|
$21,270.000
|
$25,000.000
|
|
|
TMSP RADAR SPEED CONTROL MONITOR
|
EA
|
2.000
|
$9,000.000
|
$10,797.000
|
$15,000.000
|
|
|
TMA (STATIONARY)
|
DAY
|
20.000
|
$300.000
|
$400.000
|
$750.000
|
|
|
TMA (MOBILE OPERATION)
|
DAY
|
20.000
|
$300.000
|
$700.000
|
$975.000
|
|
|
PAVEMENT SEALER 6"
|
LF
|
9,040.000
|
$1.000
|
$0.780
|
$1.100
|
|
Totals: |
$18,124,488.500
|
$33,183,610.430
|
$35,337,093.718
|