MARTIN SH 349 (0380-17-005)

Items: 69

County: MARTIN
Length: N/A
Highway: SH 349
District: ODESSA
Control Number: 0380-17-005
DBE Goal: N/A
Project: NH 2020(390)
Guaranty: N/A
Time: 100 WORKING DAYS
Engineer's Estimate: $7,551,937.27
Date: 12/04/2019 (6 years ago)
Contract Number: N/A
Type: ROADWAY REHABILITATION
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice HCS Excel Tabs Print Print Notice
Pay Estimates:
Bidders (4)
E
Engineer's Estimate
$7,551,937.27
Over/Under Est: -0.05% -$3,449.22
$7,868,053.43
Over/Under Est: 4.19% $316,116.16
Amt Left: 4.23% $319,565.38
$8,185,379.92
Over/Under Est: 8.39% $633,442.65
Amt Left: 8.44% $636,891.87
Delta: -4.03% -$317,326.49
Over/Under Est: 34.86% $2,632,945.92
Amt Left: 34.93% $2,636,395.14
Delta: -24.43% -$1,999,503.27

Bid Items & Bid Tabulations

69 Total 0 of 69
MARTIN  |  SH 349  |  ODESSA  |  0380-17-005  |  12/04/2019  |  $7,551,937.27  |  NH 2020(390)  |  ROADWAY REHAB  |  100 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
JONES BROS. DIRT & PAVING CONTRACTORS, INC.
REECE ALBERT, INC.
FNF CONSTRUCTION, INC.
JOHNSON BROS. CORPORATION, A SOUTHLAND COMPANY
SUBGRADE WIDENING (ORD COMP)
STA 19.000 $350.000 $1,200.000 $814.780 $427.000 $400.000
BACKFILL (TY B)
STA 653.000 $135.000 $100.000 $44.980 $98.000 $285.000
BLADING
HR 100.000 $220.000 $350.000 $480.650 $148.000 $250.000
PROOF ROLLING
HR 50.000 $115.000 $150.000 $107.350 $111.000 $200.000
FL BS (CMP IN PLC)(TY A GR 4)(12")
SY 1,272.000 $11.000 $30.000 $14.070 $19.000 $18.000
FOG SEAL (CSS-1H)
GAL 2,156.000 $3.500 $6.710 $5.890 $4.000 $4.000
ASPH (AC-20-5TR)
GAL 12,631.000 $3.500 $4.610 $3.910 $4.000 $7.000
AGGR(TY-PB GR-3 SAC-A)
CY 155.000 $90.000 $231.000 $210.780 $152.000 $85.000
AGGR(TY-PB GR-4 SAC-A)
CY 185.000 $70.000 $175.000 $185.380 $142.000 $85.000
D-GR HMA(SQ) TY-C SAC-B PG64-22
TON 354.000 $185.000 $400.000 $161.700 $342.000 $170.000
STONE-MTRX-ASPH SMAR-F SAC-A
TON 39,263.000 $125.000 $112.000 $133.420 $120.000 $180.000
FLEXIBLE PAVEMENT STRUCTURE REPAIR(6")
SY 18,962.000 $42.200 $57.500 $49.580 $59.000 $45.000
PLANE ASPH CONC PAV(0" TO 2")
SY 18,666.000 $2.000 $3.410 $2.820 $3.000 $3.000
DRILL SHAFT (30 IN)
LF 12.000 $300.000 $385.000 $377.130 $425.000 $250.000
DRILL SHAFT (SIGN MTS) (12 IN)
LF 16.000 $138.130 $159.500 $328.640 $176.000 $115.000
CONC STR REPAIR(DECK REP(PART DEPTH))
SF 50.000 $135.000 $793.100 $368.500 $133.000 $200.000
RIPRAP (CONC)(4 IN)
CY 1.000 $550.000 $3,091.000 $808.120 $2,330.000 $565.000
MOBILIZATION
LS 1.000 $686,539.750 $480,000.000 $346,536.530 $806,000.000 $1,000,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 5.000 $10,000.000 $7,500.000 $4,548.930 $46,000.000 $7,500.000
BIODEG EROSN CONT LOGS (INSTL) (18")
LF 1,748.000 $6.250 $10.000 $9.220 $10.000 $6.000
BIODEG EROSN CONT LOGS (REMOVE)
LF 1,748.000 $1.260 $5.000 $1.910 $1.000 $1.000
RUMBLE STRIPS (SHOULDER)
LF 128,599.000 $0.140 $0.140 $0.120 $0.160 $0.150
RUMBLE STRIPS (CENTERLINE)
LF 64,299.000 $0.140 $0.230 $0.140 $0.180 $0.150
MTL W-BEAM GD FEN (STEEL POST)
LF 4,775.000 $29.780 $30.800 $30.170 $26.000 $25.000
MTL BEAM GD FEN TRANS (THRIE-BEAM)
EA 4.000 $2,323.230 $2,420.000 $3,096.460 $2,200.000 $1,800.000
MTL BEAM GD FEN TRANS (T101)
EA 4.000 $1,423.230 $2,200.000 $2,155.000 $1,300.000 $1,000.000
REMOVE METAL BEAM GUARD FENCE
LF 4,775.000 $4.040 $4.400 $4.310 $3.000 $3.000
GUARDRAIL END TREATMENT (INSTALL)
EA 8.000 $2,977.400 $3,355.000 $3,286.370 $3,100.000 $2,700.000
GUARDRAIL END TREATMENT (REMOVE)
EA 8.000 $363.230 $330.000 $323.250 $310.000 $275.000
RELOCATE RD IL ASM (TRANS-BASE)
EA 2.000 $2,000.000 $4,400.000 $4,309.990 $4,100.000 $2,000.000
CONDT (PVC) (SCH 40) (2")
LF 280.000 $9.000 $7.700 $7.540 $8.000 $10.000
ELEC CONDR (NO.6) BARE
LF 300.000 $1.400 $1.650 $1.620 $1.600 $1.500
ELEC CONDR (NO.6) INSULATED
LF 600.000 $2.000 $1.650 $1.620 $1.600 $1.500
ALUMINUM SIGNS (TY G)
SF 60.000 $28.230 $34.100 $64.650 $32.000 $25.000
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
EA 57.000 $623.230 $880.000 $1,113.060 $820.000 $475.000
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
EA 7.000 $780.000 $1,045.000 $1,452.470 $975.000 $580.000
IN SM RD SN SUP&AM TY10BWG(1)SA(T-EXAL)
EA 2.000 $926.090 $1,210.000 $1,839.290 $1,150.000 $760.000
IN SM RD SN SUP&AM TYS80(1)SA(U-EXAL)
EA 8.000 $1,180.230 $1,292.500 $1,915.790 $1,200.000 $1,000.000
REMOVE SM RD SN SUP&AM
EA 74.000 $80.930 $100.000 $119.750 $105.000 $100.000
INSTALL LRSS (STRUCT STEEL)
LB 390.000 $6.120 $6.600 $15.080 $6.000 $7.500
REMOVE LRSA
EA 2.000 $980.320 $1,375.000 $1,939.500 $1,300.000 $925.000
INSTL OM ASSM (OM-2Z)(FLX)GND(BI)
EA 52.000 $135.230 $82.500 $118.520 $80.000 $75.000
REMOVE DELIN & OBJECT MARKER ASSMS
EA 40.000 $40.680 $50.000 $79.830 $16.000 $23.000
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2
EA 80.000 $36.320 $38.500 $37.710 $45.000 $25.000
WK ZN PAV MRK NON-REMOV (W)4"(SLD)
LF 520,592.000 $0.170 $0.150 $0.150 $0.150 $0.220
WK ZN PAV MRK NON-REMOV (Y)4"(BRK)
LF 32,538.000 $0.220 $0.200 $0.190 $0.190 $0.200
WK ZN PAV MRK NON-REMOV (Y)4"(SLD)
LF 32,538.000 $0.210 $0.240 $0.240 $0.230 $0.250
WK ZN PAV MRK SHT TERM (TAB)TY W
EA 2,782.000 $1.160 $1.500 $2.940 $2.000 $0.750
WK ZN PAV MRK SHT TERM (TAB)TY Y-2
EA 27,728.000 $0.880 $1.500 $2.990 $2.000 $0.750
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
LF 5,331.000 $1.000 $0.940 $0.920 $0.900 $0.800
REFL PAV MRK TY I (Y)24"(SLD)(100MIL)
LF 895.000 $3.440 $8.800 $8.620 $8.250 $5.000
RE PM W/RET REQ TY I (W)4"(SLD)(100MIL)
LF 136,689.000 $0.370 $0.390 $0.380 $0.400 $0.300
RE PM W/RET REQ TY I (Y)4"(BRK)(100MIL)
LF 13,646.000 $0.320 $0.500 $0.480 $0.500 $0.300
RE PM W/RET REQ TY I (Y)4"(SLD)(100MIL)
LF 43,646.000 $0.320 $0.420 $0.410 $0.400 $0.350
PREFAB PAV MRK TY C (W) (24") (SLD)
LF 619.000 $12.230 $22.000 $21.550 $21.000 $13.000
PREFAB PAV MRK TY C (W) (ARROW)
EA 23.000 $228.510 $286.000 $280.150 $264.000 $215.000
PREFAB PAV MRK TY C (W) (WORD)
EA 23.000 $268.840 $319.000 $312.470 $300.000 $250.000
PREFAB PAV MRK TY C (W) (36")(YLD TRI)
EA 4.000 $35.000 $33.000 $32.330 $31.000 $40.000
REFL PAV MRKR TY I-C
EA 92.000 $3.230 $6.600 $6.470 $6.250 $3.250
REFL PAV MRKR TY II-A-A
EA 1,873.000 $3.130 $3.300 $3.230 $3.250 $3.000
REFL PAV MRKR TY II-C-R
EA 6,040.000 $3.440 $3.030 $2.960 $3.000 $3.500
PAV SURF PREP FOR MRK (4")
LF 1,506.000 $0.150 $0.610 $0.590 $0.600 $0.100
BONDING COURSE
GAL 26,551.000 $3.530 $4.440 $2.670 $5.000 $3.150
PORTABLE CHANGEABLE MESSAGE SIGN
EA 2.000 $12,000.000 $20,350.000 $11,091.620 $20,000.000 $7,500.000
LONG CHANNEL MOUNT CURB SYS (INSTALL)
LF 80.000 $82.790 $151.170 $96.970 $140.000 $85.000
LONG CHANNEL MOUNT CURB SYS (REMOVE)
LF 80.000 $19.260 $11.000 $32.330 $11.000 $40.000
TMSP RADAR SPEED CONTROL MONITOR
EA 2.000 $9,682.590 $16,500.000 $8,066.640 $8,000.000 $7,500.000
TMA (STATIONARY)
DAY 100.000 $180.000 $489.500 $275.950 $225.000 $285.000
TMA (MOBILE OPERATION)
HR 544.000 $58.530 $110.000 $121.530 $90.000 $35.000
Totals: $7,551,937.270 $7,548,488.050 $7,868,053.430 $8,185,379.920 $10,184,883.190