EXCAVATION (ROADWAY)
|
CY
|
431.000
|
$10.000
|
$16.940
|
|
|
EMBANKMENT (FINAL)(ORD COMP)(TY B)
|
CY
|
1,557.000
|
$10.000
|
$42.900
|
|
|
BLADING
|
HR
|
20.000
|
$125.000
|
$440.000
|
|
|
PROOF ROLLING
|
HR
|
10.000
|
$125.000
|
$165.000
|
|
|
PRIME COAT (AE-P)
|
GAL
|
2,100.000
|
$4.000
|
$4.950
|
|
|
SUPERPAVE MIXTURES SP-C SAC-B PG70-22
|
TON
|
5,196.000
|
$150.000
|
$100.100
|
|
|
CEM STABIL BKFL
|
CY
|
309.000
|
$60.000
|
$206.750
|
|
|
CONC STR REPAIR (VERTICAL & OVERHEAD)
|
SF
|
60.000
|
$200.000
|
$260.000
|
|
|
RC PIPE (CL III)(18 IN)
|
LF
|
1,261.000
|
$65.000
|
$66.000
|
|
|
SET (TY II) (18 IN) (RCP) (6: 1) (P)
|
EA
|
2.000
|
$1,000.000
|
$2,593.750
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$179,589.090
|
$182,000.000
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
5.000
|
$12,000.000
|
$21,000.000
|
|
|
CONSTRUCTION EXITS (INSTALL) (TY 1)
|
SY
|
222.000
|
$20.000
|
$15.900
|
|
|
CONSTRUCTION EXITS (REMOVE)
|
SY
|
222.000
|
$10.000
|
$13.200
|
|
|
BIODEG EROSN CONT LOGS (INSTL) (18")
|
LF
|
100.000
|
$5.000
|
$11.000
|
|
|
BIODEG EROSN CONT LOGS (REMOVE)
|
LF
|
100.000
|
$1.500
|
$5.500
|
|
|
ONE-WAY TRAF CONT (PORT TRAF SIG)
|
MO
|
1.000
|
$12,000.000
|
$9,100.000
|
|
|
PORT CTB (FUR & INST)(SGL SLOPE)(TY 1)
|
LF
|
3,990.000
|
$30.000
|
$34.000
|
|
|
PORT CTB (MOVE)(SGL SLP)(TY 1)
|
LF
|
2,610.000
|
$6.000
|
$16.000
|
|
|
PORT CTB (REMOVE)(SGL SLP)(TY 1)
|
LF
|
3,990.000
|
$8.000
|
$24.000
|
|
|
PERM CTB (F-SHAPE) (TY 1)
|
LF
|
2,550.000
|
$60.000
|
$73.000
|
|
|
MTL W-BEAM GD FEN (STEEL POST)
|
LF
|
805.000
|
$25.000
|
$25.300
|
|
|
REMOVE METAL BEAM GUARD FENCE
|
LF
|
805.000
|
$3.000
|
$3.300
|
|
|
CABLE BARRIER TERMINAL SECTION (TL-4)
|
EA
|
1.000
|
$2,500.000
|
$4,400.000
|
|
|
REMOVE CABLE BARRIER
|
LF
|
1,274.000
|
$4.000
|
$2.200
|
|
|
GUARDRAIL END TREATMENT (INSTALL)
|
EA
|
3.000
|
$2,400.000
|
$2,750.000
|
|
|
GUARDRAIL END TREATMENT (REMOVE)
|
EA
|
3.000
|
$275.000
|
$330.000
|
|
|
CRASH CUSH ATTEN (INSTL)
|
EA
|
9.000
|
$11,000.000
|
$8,800.000
|
|
|
CRASH CUSH ATTEN (MOVE & RESET)
|
EA
|
5.000
|
$1,600.000
|
$2,200.000
|
|
|
CRASH CUSH ATTEN (REMOVE)
|
EA
|
5.000
|
$750.000
|
$1,100.000
|
|
|
WK ZN PAV MRK REMOV (REFL) TY I-A
|
LF
|
12,935.000
|
$3.000
|
$0.790
|
|
|
WK ZN PAV MRK REMOV (REFL) TY I-C
|
LF
|
8,986.000
|
$3.000
|
$0.790
|
|
|
WK ZN PAV MRK REMOV (TRAF BTN) TY W
|
LF
|
8,986.000
|
$1.000
|
$0.790
|
|
|
WK ZN PAV MRK REMOV (TRAF BTN) TY Y
|
LF
|
12,935.000
|
$1.000
|
$0.790
|
|
|
WK ZN PAV MRK REMOV (W)24"(SLD)
|
LF
|
48.000
|
$9.000
|
$4.750
|
|
|
WK ZN PAV MRK REMOV (Y)4"(SLD)
|
LF
|
2,238.000
|
$0.750
|
$0.870
|
|
REFL PAV MRK TY I (W)8"(SLD)(090MIL)
|
LF
|
606.000
|
$0.300
|
$0.840
|
|
RE PM W/RET REQ TY I (W)4"(BRK)(090MIL)
|
LF
|
3,200.000
|
$0.300
|
$0.420
|
|
RE PM W/RET REQ TY I (W)4"(SLD)(090MIL)
|
LF
|
10,832.000
|
$0.300
|
$0.420
|
|
RE PM W/RET REQ TY I (Y)4"(SLD)(090MIL)
|
LF
|
15,110.000
|
$0.300
|
$0.420
|
|
REFL PAV MRKR TY II-C-R
|
EA
|
159.000
|
$3.100
|
$3.580
|
|
|
ELIM EXT PAV MRK & MRKS (4")
|
LF
|
26,830.000
|
$0.500
|
$0.660
|
|
|
CNC CRACK REPAIR (DISCRETE)(INJECT)
|
LF
|
120.000
|
$70.000
|
$75.000
|
|
|
REP STL BRIDGE MEMBER (DIAPHRAGM)
|
EA
|
4.000
|
$2,500.000
|
$1,000.000
|
|
|
REP STL BRIDGE MEMBER (BEAM REPL)
|
EA
|
2.000
|
$50,000.000
|
$85,000.000
|
|
|
REP STL BRIDGE MEMBER(STRAIGHTEN MEMB)
|
EA
|
2.000
|
$10,000.000
|
$2,500.000
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
EA
|
4.000
|
$12,500.000
|
$12,500.000
|
|
Totals: |
$1,955,051.890
|
$1,987,502.230
|