Bid Cobra

MARTIN IH 20 (0005-04-072)

Items: 47

County: MARTIN
Length: N/A
Highway: IH 20
District: ODESSA
Control Number: 0005-04-072
DBE Goal: N/A
Project: NH 1702(494)
Guaranty: N/A
Time: 88 WORKING DAYS
Engineer's Estimate: $1,955,051.89
Date: 07/11/2017 (8 years ago)
Contract Number: N/A
Type: BRIDGE REPAIR
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice HCS Excel Tabs Print Print Notice
Pay Estimates:
Bidders (1)
E
Engineer's Estimate
$1,955,051.89
$1,987,502.23
Over/Under Est: 1.66% $32,450.34

Bid Items & Bid Tabulations

47 Total 0 of 47
MARTIN  |  IH 20  |  ODESSA  |  0005-04-072  |  07/11/2017  |  $1,955,051.89  |  NH 1702(494)  |  BRIDGE REPAIR  |  88 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
GIBSON & ASSOCIATES, INC.
EXCAVATION (ROADWAY)
CY 431.000 $10.000 $16.940
EMBANKMENT (FINAL)(ORD COMP)(TY B)
CY 1,557.000 $10.000 $42.900
BLADING
HR 20.000 $125.000 $440.000
PROOF ROLLING
HR 10.000 $125.000 $165.000
PRIME COAT (AE-P)
GAL 2,100.000 $4.000 $4.950
SUPERPAVE MIXTURES SP-C SAC-B PG70-22
TON 5,196.000 $150.000 $100.100
CEM STABIL BKFL
CY 309.000 $60.000 $206.750
CONC STR REPAIR (VERTICAL & OVERHEAD)
SF 60.000 $200.000 $260.000
RC PIPE (CL III)(18 IN)
LF 1,261.000 $65.000 $66.000
SET (TY II) (18 IN) (RCP) (6: 1) (P)
EA 2.000 $1,000.000 $2,593.750
MOBILIZATION
LS 1.000 $179,589.090 $182,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 5.000 $12,000.000 $21,000.000
CONSTRUCTION EXITS (INSTALL) (TY 1)
SY 222.000 $20.000 $15.900
CONSTRUCTION EXITS (REMOVE)
SY 222.000 $10.000 $13.200
BIODEG EROSN CONT LOGS (INSTL) (18")
LF 100.000 $5.000 $11.000
BIODEG EROSN CONT LOGS (REMOVE)
LF 100.000 $1.500 $5.500
ONE-WAY TRAF CONT (PORT TRAF SIG)
MO 1.000 $12,000.000 $9,100.000
PORT CTB (FUR & INST)(SGL SLOPE)(TY 1)
LF 3,990.000 $30.000 $34.000
PORT CTB (MOVE)(SGL SLP)(TY 1)
LF 2,610.000 $6.000 $16.000
PORT CTB (REMOVE)(SGL SLP)(TY 1)
LF 3,990.000 $8.000 $24.000
PERM CTB (F-SHAPE) (TY 1)
LF 2,550.000 $60.000 $73.000
MTL W-BEAM GD FEN (STEEL POST)
LF 805.000 $25.000 $25.300
REMOVE METAL BEAM GUARD FENCE
LF 805.000 $3.000 $3.300
CABLE BARRIER TERMINAL SECTION (TL-4)
EA 1.000 $2,500.000 $4,400.000
REMOVE CABLE BARRIER
LF 1,274.000 $4.000 $2.200
GUARDRAIL END TREATMENT (INSTALL)
EA 3.000 $2,400.000 $2,750.000
GUARDRAIL END TREATMENT (REMOVE)
EA 3.000 $275.000 $330.000
CRASH CUSH ATTEN (INSTL)
EA 9.000 $11,000.000 $8,800.000
CRASH CUSH ATTEN (MOVE & RESET)
EA 5.000 $1,600.000 $2,200.000
CRASH CUSH ATTEN (REMOVE)
EA 5.000 $750.000 $1,100.000
WK ZN PAV MRK REMOV (REFL) TY I-A
LF 12,935.000 $3.000 $0.790
WK ZN PAV MRK REMOV (REFL) TY I-C
LF 8,986.000 $3.000 $0.790
WK ZN PAV MRK REMOV (TRAF BTN) TY W
LF 8,986.000 $1.000 $0.790
WK ZN PAV MRK REMOV (TRAF BTN) TY Y
LF 12,935.000 $1.000 $0.790
WK ZN PAV MRK REMOV (W)24"(SLD)
LF 48.000 $9.000 $4.750
WK ZN PAV MRK REMOV (Y)4"(SLD)
LF 2,238.000 $0.750 $0.870
REFL PAV MRK TY I (W)8"(SLD)(090MIL)
LF 606.000 $0.300 $0.840
RE PM W/RET REQ TY I (W)4"(BRK)(090MIL)
LF 3,200.000 $0.300 $0.420
RE PM W/RET REQ TY I (W)4"(SLD)(090MIL)
LF 10,832.000 $0.300 $0.420
RE PM W/RET REQ TY I (Y)4"(SLD)(090MIL)
LF 15,110.000 $0.300 $0.420
REFL PAV MRKR TY II-C-R
EA 159.000 $3.100 $3.580
ELIM EXT PAV MRK & MRKS (4")
LF 26,830.000 $0.500 $0.660
CNC CRACK REPAIR (DISCRETE)(INJECT)
LF 120.000 $70.000 $75.000
REP STL BRIDGE MEMBER (DIAPHRAGM)
EA 4.000 $2,500.000 $1,000.000
REP STL BRIDGE MEMBER (BEAM REPL)
EA 2.000 $50,000.000 $85,000.000
REP STL BRIDGE MEMBER(STRAIGHTEN MEMB)
EA 2.000 $10,000.000 $2,500.000
PORTABLE CHANGEABLE MESSAGE SIGN
EA 4.000 $12,500.000 $12,500.000
Totals: $1,955,051.890 $1,987,502.230