MADISON CR (0917-31-034)

Items: 40

County: MADISON
Length: N/A
Highway: CR
District: BRYAN
Control Number: 0917-31-034
DBE Goal: N/A
Project: BR 2021(239)
Guaranty: N/A
Time: 153 WORKING DAYS
Engineer's Estimate: $657,161.96
Date: 06/02/2023 (3 years ago)
Contract Number: N/A
Type: BRIDGE REPLACEMENT
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice HCS Excel Tabs Print Print Notice
Bidders (3)
E
Engineer's Estimate
$657,161.96
$669,117.60
Over/Under Est: 1.82% $11,955.64
Over/Under Est: 7.62% $50,066.71
Amt Left: 5.7% $38,111.07
Over/Under Est: 27.78% $182,565.64
Amt Left: 25.5% $170,610.00
Delta: -18.73% -$132,498.93
Subcontractor Percentage Amount
MORRIS COUNTY CONTRACTORS, L.L.C. 3.08% $20,653.27
BUYERS BARRICADES HOUSTON, LLC 1.53% $10,259.58
PENHALL COMPANY 1.10% $7,376.17
HERMANOS STEEL, LLC 0.89% $5,967.99
HIGHWAY 1 LLC 0.69% $4,626.87
SEMARCK LANDSCAPE SERVICES, INC. 0.63% $4,224.53
Total: 7.92% $53,108.41

Bid Items & Bid Tabulations

40 Total 0 of 40
MADISON  |  CR  |  BRYAN  |  0917-31-034  |  06/02/2023  |  $657,161.96  |  BR 2021(239)  |  BRIDGE REPL  |  153 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
R CONSTRUCTION CIVIL, LLC
SEFBO PIPELINE BRIDGE, INCORPORATED
TEXAS MATERIALS GROUP, INC.
PREPARING ROW
STA 3.650 $6,000.000 $10,000.000 $10,542.610 $20,000.000
EXCAVATION (ROADWAY)
CY 149.000 $30.000 $25.000 $20.130 $100.000
EXCAVATION (CHANNEL)
CY 37.040 $55.000 $25.000 $71.270 $130.000
EMBANKMENT (FINAL)(ORD COMP)(TY C)
CY 166.000 $45.000 $25.000 $85.080 $90.000
FURNISHING AND PLACING TOPSOIL (4")
SY 732.000 $5.500 $4.000 $10.330 $6.000
BROADCAST SEED (PERM) (RURAL) (SANDY)
SY 732.000 $1.100 $1.000 $0.700 $1.500
BROADCAST SEED (TEMP) (WARM)
SY 366.000 $1.200 $0.800 $1.210 $1.500
BROADCAST SEED (TEMP) (COOL)
SY 366.000 $1.100 $0.800 $1.210 $1.500
VEGETATIVE WATERING
MG 15.000 $350.000 $41.000 $104.000 $50.000
SOIL RETENTION BLANKETS (CL 1) (TY C)
SY 131.000 $4.200 $4.000 $77.310 $2.000
FL BS (CMP IN PLC)(TY A GR 4) (6")
SY 916.000 $25.000 $35.000 $22.860 $29.000
CEM STABIL BKFL
CY 34.000 $240.000 $250.000 $229.380 $350.000
DRILL SHAFT (24 IN)
LF 393.000 $240.000 $365.000 $317.990 $418.000
CL C CONC (ABUT)
CY 21.000 $1,600.000 $2,500.000 $2,401.820 $2,200.000
CL C CONC (CAP)
CY 6.900 $1,900.000 $2,500.000 $2,638.860 $3,500.000
CL C CONC (COLUMN)
CY 2.100 $2,000.000 $2,800.000 $5,929.070 $5,000.000
REINF CONC SLAB (SLAB BEAM)
SF 2,080.000 $30.000 $30.000 $26.290 $39.000
PRESTR CONC SLAB BEAM (5SB15)
LF 394.920 $285.000 $250.000 $272.310 $260.000
RIPRAP (STONE PROTECTION)(18 IN)
CY 163.000 $240.000 $210.000 $145.630 $234.000
RAIL (TY T223)
LF 184.000 $175.000 $130.000 $173.280 $195.000
ARMOR JOINT (SEALED)
LF 46.000 $175.000 $100.000 $200.730 $160.000
REMOV STR (BRIDGE 0 - 99 FT LENGTH)
EA 1.000 $30,000.000 $25,000.000 $63,600.000 $19,000.000
MOBILIZATION
LS 1.000 $55,110.160 $65,000.000 $60,000.000 $80,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 8.000 $6,000.000 $1,800.000 $225.000 $5,000.000
ROCK FILTER DAMS (INSTALL) (TY 2)
LF 85.000 $45.000 $39.000 $41.290 $42.000
ROCK FILTER DAMS (REMOVE)
LF 85.000 $17.000 $2.000 $8.470 $12.000
TEMP SEDMT CONT FENCE (INSTALL)
LF 888.000 $5.250 $4.000 $4.250 $3.900
TEMP SEDMT CONT FENCE (REMOVE)
LF 888.000 $1.900 $1.000 $0.410 $1.250
MTL W-BEAM GD FEN (TIM POST)
LF 75.000 $30.000 $22.000 $156.260 $32.000
MTL BEAM GD FEN TRANS (TL2)
EA 4.000 $1,500.000 $1,200.000 $720.000 $1,500.000
SHORT RADIUS
LF 45.000 $140.000 $55.000 $25.200 $56.000
DRIVEWAY TERMINAL ANCHOR SECTION
EA 1.000 $1,200.000 $1,200.000 $480.000 $1,000.000
MTL BM GD FEN TRANS (31"-28")(25')
EA 1.000 $700.000 $600.000 $480.000 $750.000
GUARDRAIL END TREATMENT (INSTALL)
EA 3.000 $3,400.000 $3,241.000 $2,544.000 $3,000.000
GATE (INSTALL)(DOUBLE)(6' X 16')
EA 1.000 $3,500.000 $756.000 $5,040.000 $2,500.000
IN SM RD SN SUP&AM TYTWT(1)UA(P)
EA 4.000 $710.000 $66.000 $360.000 $550.000
REMOVE SM RD SN SUP&AM
EA 2.000 $150.000 $110.000 $120.000 $150.000
INSTL DEL ASSM (D-SW)SZ (BRF)CTB (BI)
EA 8.000 $35.000 $25.000 $61.050 $25.000
INSTL OM ASSM (OM-2X)(WC)GND
EA 6.000 $90.000 $80.000 $112.000 $65.000
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI)
EA 8.000 $45.000 $28.000 $60.000 $35.000
Totals: $657,161.960 $669,117.600 $707,228.694 $839,727.600