|
|
PREPARING ROW
|
STA
|
10.700
|
$400.000
|
$5,000.000
|
$30,000.000
|
|
|
PREPARING ROW(TREE)(5" TO 12" DIA)
|
EA
|
2.000
|
$500.000
|
$3,500.000
|
$1,500.000
|
|
|
RMV TRT BASE & ASPH PAV (0"-19")
|
SY
|
152.000
|
$6.000
|
$7.000
|
$50.000
|
|
|
EXCAVATION (ROADWAY)
|
CY
|
720.000
|
$11.000
|
$17.000
|
$34.000
|
|
|
EMBANKMENT (FINAL)(ORD COMP)(TY C)
|
CY
|
1,630.000
|
$14.000
|
$22.000
|
$34.000
|
|
|
EMBANKMENT (VEHICLE)(ORD COMP)(TY C)
|
CY
|
19.000
|
$26.000
|
$62.000
|
$160.000
|
|
|
SPEC EXCAV WORK (BACKHOE)
|
HR
|
8.000
|
$180.000
|
$167.000
|
$170.000
|
|
|
BLOCK SODDING
|
SY
|
1,190.000
|
$5.250
|
$3.500
|
$7.000
|
|
|
VEGETATIVE WATERING
|
MG
|
12.000
|
$12.500
|
$32.000
|
$70.000
|
|
|
PLANT MAINTENANCE
|
MO
|
3.000
|
$1,000.000
|
$1,627.000
|
$3,000.000
|
|
|
FL BS (CMP IN PLC)(TY E GR 4)(FNAL POS)
|
CY
|
19.000
|
$30.000
|
$161.000
|
$500.000
|
|
|
FL BS (CMP IN PLC)(TY D GR1-2)(8")
|
SY
|
1,741.000
|
$15.000
|
$25.000
|
$35.000
|
|
|
CEMENT
|
TON
|
19.000
|
$150.000
|
$245.000
|
$400.000
|
|
|
CEMENT TREAT (SUBGRADE)(9")
|
SY
|
1,741.000
|
$8.000
|
$5.000
|
$11.000
|
|
|
CEM TRT(PLNT MX)(CLN)(TY D)(GR1-2)(10")
|
SY
|
616.000
|
$40.000
|
$28.000
|
$44.000
|
|
|
PRIME COAT (MC-30 OR EC-30)
|
GAL
|
471.000
|
$3.650
|
$14.000
|
$14.000
|
|
|
SUPERPAVE MIXTURES SP-B PG64-22
|
TON
|
648.000
|
$78.000
|
$170.000
|
$135.000
|
|
|
SUPERPAVE MIXTURES SP-C SAC-A PG70-22
|
TON
|
1,187.000
|
$73.000
|
$199.000
|
$132.000
|
|
|
FLEXIBLE PAVEMENT STRUCTURE REPAIR(8")
|
SY
|
5,000.000
|
$40.000
|
$14.000
|
$50.000
|
|
|
PLAN & TEXT ASPH CONC PAV(0" TO 2")
|
SY
|
7,419.000
|
$1.500
|
$8.000
|
$7.000
|
|
|
CEM STABIL BKFL
|
CY
|
131.000
|
$87.000
|
$53.000
|
$160.000
|
|
|
CUT & RESTORING PAV
|
SY
|
19.000
|
$100.000
|
$150.000
|
$270.000
|
|
|
FLOWABLE BACKFILL
|
CY
|
6.000
|
$215.000
|
$210.000
|
$500.000
|
|
|
TRENCH EXCAVATION PROTECTION
|
LF
|
30.000
|
$20.000
|
$40.000
|
$28.000
|
|
|
DRILL SHAFT (36 IN)
|
LF
|
752.000
|
$180.000
|
$265.000
|
$400.000
|
|
|
DRILL SHAFT (HIGH MAST POLE) (60 IN)
|
LF
|
66.000
|
$600.000
|
$1,012.000
|
$1,000.000
|
|
|
DRILL SHAFT (TRF SIG POLE) (24 IN)
|
LF
|
42.000
|
$250.000
|
$152.000
|
$140.000
|
|
|
DRILL SHAFT (TRF SIG POLE) (36 IN)
|
LF
|
28.000
|
$300.000
|
$308.000
|
$300.000
|
|
|
DRILL SHAFT (TRF SIG POLE) (48 IN)
|
LF
|
44.000
|
$425.000
|
$393.000
|
$380.000
|
|
|
CL C CONC (ABUT)(EXTEND)
|
CY
|
42.200
|
$1,200.000
|
$1,500.000
|
$1,800.000
|
|
|
CL C CONC (CAP)
|
CY
|
49.200
|
$1,500.000
|
$1,250.000
|
$1,800.000
|
|
|
CL C CONC (COLUMN)
|
CY
|
56.100
|
$1,400.000
|
$1,400.000
|
$1,200.000
|
|
|
CL C CONC (COLLAR)
|
EA
|
1.000
|
$500.000
|
$840.000
|
$1,000.000
|
|
|
CL C CONC (VEH DEFL WALL)
|
CY
|
237.800
|
$1,700.000
|
$790.000
|
$1,000.000
|
|
|
CL C CONC(PILE ENCASEMENT)
|
LF
|
36.000
|
$500.000
|
$495.000
|
$700.000
|
|
|
REINF CONC SLAB (EXTEND SLAB)
|
SF
|
9,662.000
|
$21.000
|
$23.000
|
$36.000
|
|
|
APPROACH SLAB (EXTEND)
|
CY
|
64.200
|
$525.000
|
$630.000
|
$900.000
|
|
|
PRESTR CONC GIRDER (TX28)
|
LF
|
1,139.970
|
$147.000
|
$200.000
|
$200.000
|
|
|
CONC STR REPAIR (VERTICAL & OVERHEAD)
|
SF
|
20.000
|
$180.000
|
$540.000
|
$300.000
|
|
|
RIPRAP (CONC)(4 IN)
|
CY
|
168.000
|
$400.000
|
$500.000
|
$600.000
|
|
|
RIPRAP (CONC)(CL B)(RR8&RR9)
|
CY
|
15.000
|
$470.000
|
$600.000
|
$1,000.000
|
|
|
RIPRAP (CONC) (CL B) (4")
|
CY
|
4.600
|
$425.000
|
$600.000
|
$700.000
|
|
|
RIPRAP (STONE PROTECTION)(18 IN)
|
CY
|
200.000
|
$100.000
|
$180.000
|
$260.000
|
|
|
RIPRAP (MOW STRIP)(4 IN)
|
CY
|
47.000
|
$400.000
|
$700.000
|
$800.000
|
|
|
CLEANING AND SEALING EXIST JOINTS(CL7)
|
LF
|
87.000
|
$40.000
|
$135.000
|
$55.000
|
|
|
MULTI-LAYER POLYMER OVERLAY
|
SY
|
267.000
|
$45.000
|
$350.000
|
$65.000
|
|
|
STR STEEL (MISC NON - BRIDGE)
|
LB
|
276.000
|
$5.000
|
$25.000
|
$15.000
|
|
|
SPOT CLEAN & PAINT EXT STR(SPL PRT SYS)
|
LS
|
1.000
|
$7,500.000
|
$13,500.000
|
$60,000.000
|
|
|
RAIL (TY T224)
|
LF
|
516.000
|
$246.000
|
$150.000
|
$135.000
|
|
|
RAIL (TY PR22)
|
LF
|
246.000
|
$80.000
|
$120.000
|
$135.000
|
|
|
ARMOR JOINT (SEALED)
|
LF
|
166.000
|
$66.000
|
$67.000
|
$100.000
|
|
|
RC PIPE (CL IV)(24 IN)
|
LF
|
110.000
|
$76.000
|
$95.000
|
$250.000
|
|
|
JCTBOX(COMPL)(PJB)(3FTX3FT)
|
EA
|
1.000
|
$4,000.000
|
$3,200.000
|
$5,000.000
|
|
|
INLET(COMPL)(PSL)(SFG)(3FTX3FT-3FTX3FT)
|
EA
|
1.000
|
$4,000.000
|
$3,500.000
|
$4,500.000
|
|
|
SET (TY II) (24 IN) (RCP) (6: 1) (C)
|
EA
|
1.000
|
$1,200.000
|
$1,700.000
|
$1,700.000
|
|
|
SHOT BLASTING
|
SY
|
267.000
|
$5.500
|
$90.000
|
$11.000
|
|
|
REMOV STR (SET)
|
EA
|
2.000
|
$250.000
|
$350.000
|
$1,100.000
|
|
|
REMOV STR (PIPE)
|
LF
|
10.000
|
$15.000
|
$75.000
|
$85.000
|
|
|
REMOVE STR (CONC)
|
EA
|
3.000
|
$3,000.000
|
$3,200.000
|
$6,000.000
|
|
|
REMOV STR (BRIDGE SLAB)
|
LF
|
460.000
|
$30.000
|
$140.000
|
$180.000
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$300,000.000
|
$202,000.000
|
$580,000.000
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
8.000
|
$7,500.000
|
$11,300.000
|
$55,000.000
|
|
|
ROCK FILTER DAMS (INSTALL) (TY 1)
|
LF
|
45.000
|
$33.000
|
$55.000
|
$40.000
|
|
|
ROCK FILTER DAMS (REMOVE)
|
LF
|
45.000
|
$8.000
|
$28.000
|
$11.000
|
|
|
TEMP SEDMT CONT FENCE (INSTALL)
|
LF
|
439.000
|
$2.500
|
$5.000
|
$3.700
|
|
|
TEMP SEDMT CONT FENCE (REMOVE)
|
LF
|
439.000
|
$0.530
|
$3.000
|
$1.100
|
|
|
BIODEG EROSN CONT LOGS (INSTL) (8")
|
LF
|
30.000
|
$6.000
|
$10.000
|
$4.400
|
|
|
BIODEG EROSN CONT LOGS (REMOVE)
|
LF
|
30.000
|
$1.000
|
$4.000
|
$1.000
|
|
|
CONSTRUCTING DETOURS
|
SY
|
140.000
|
$70.000
|
$268.000
|
$170.000
|
|
|
PORT CTB (FUR & INST)(LOW PROF)(TY 1)
|
LF
|
520.000
|
$35.000
|
$86.000
|
$75.000
|
|
|
PORT CTB (FUR & INST)(LOW PROF)(TY 2)
|
LF
|
40.000
|
$40.000
|
$90.000
|
$75.000
|
|
|
PORT CTB (MOVE)(LOW PROF)(TY 1)
|
LF
|
500.000
|
$5.000
|
$2.000
|
$30.000
|
|
|
PORT CTB (MOVE)(LOW PROF)(TY 2)
|
LF
|
40.000
|
$8.000
|
$5.000
|
$30.000
|
|
|
PORT CTB (REMOVE)(LOW PROF)(TY 1)
|
LF
|
520.000
|
$8.000
|
$15.000
|
$20.000
|
|
|
PORT CTB (REMOVE)(LOW PROF)(TY 2)
|
LF
|
40.000
|
$9.000
|
$16.000
|
$20.000
|
|
|
PTB (FRN&INSTL)(F SHAPE)(TY 1) OR (STL)
|
LF
|
1,800.000
|
$40.000
|
$70.000
|
$60.000
|
|
|
PTB (REMOVE)(F SHAPE)(TY 1) OR (STL)
|
LF
|
1,800.000
|
$11.000
|
$15.000
|
$15.000
|
|
|
CONC SIDEWALKS (4")
|
SY
|
373.000
|
$55.000
|
$80.000
|
$140.000
|
|
|
CURB RAMPS (TY 1)
|
EA
|
2.000
|
$1,500.000
|
$4,000.000
|
$4,500.000
|
|
|
CURB RAMPS (TY 7)
|
EA
|
6.000
|
$1,500.000
|
$3,000.000
|
$4,500.000
|
|
|
MTL W-BEAM GD FEN (TIM POST)
|
LF
|
400.000
|
$20.000
|
$23.000
|
$21.000
|
|
|
MTL BEAM GD FEN TRANS (THRIE-BEAM)
|
EA
|
4.000
|
$1,950.000
|
$1,600.000
|
$2,200.000
|
|
|
DOWNSTREAM ANCHOR TERMINAL SECTION
|
EA
|
2.000
|
$1,150.000
|
$1,300.000
|
$1,400.000
|
|
|
MTL BM GD FEN TRANS (NON - SYM)
|
EA
|
2.000
|
$880.000
|
$850.000
|
$850.000
|
|
|
REMOVE METAL BEAM GUARD FENCE
|
LF
|
550.000
|
$2.150
|
$5.000
|
$3.000
|
|
|
RM MTL BM GD FENCE TRANS (THRIE-BEAM)
|
EA
|
2.000
|
$250.000
|
$250.000
|
$370.000
|
|
|
RM MTL BM GD FEN TRANS (T101)
|
EA
|
4.000
|
$165.000
|
$200.000
|
$270.000
|
|
|
GUARDRAIL END TREATMENT (INSTALL)
|
EA
|
4.000
|
$2,700.000
|
$2,480.000
|
$2,700.000
|
|
|
GUARDRAIL END TREATMENT (REMOVE)
|
EA
|
6.000
|
$300.000
|
$250.000
|
$270.000
|
|
|
CRASH CUSH ATTEN (REMOVE)
|
EA
|
6.000
|
$1,200.000
|
$2,477.000
|
$1,400.000
|
|
|
CRASH CUSH ATTEN (INSTL)(L)(N)(TL3)
|
EA
|
2.000
|
$25,000.000
|
$27,000.000
|
$30,000.000
|
|
|
CRASH CUSH ATTEN (INSTL)(S)(N)(TL3)
|
EA
|
4.000
|
$8,000.000
|
$8,587.000
|
$11,000.000
|
|
|
REMOVE RD IL ASM (TRANS-BASE)
|
EA
|
3.000
|
$600.000
|
$445.000
|
$500.000
|
|
|
HI MST IL POLE (150 FT)( 80 MPH)
|
EA
|
2.000
|
$32,500.000
|
$32,195.000
|
$34,000.000
|
|
|
HI MST IL ASM (12-400W)(SYM)
|
EA
|
2.000
|
$25,000.000
|
$26,862.000
|
$29,000.000
|
|
|
CONDT (PVC) (SCH 40) (2")
|
LF
|
895.000
|
$10.000
|
$7.500
|
$8.000
|
|
|
CONDT (PVC) (SCH 40) (2") (BORE)
|
LF
|
515.000
|
$30.000
|
$14.200
|
$16.000
|
|
|
CONDT (PVC) (SCH 40) (4")
|
LF
|
620.000
|
$20.000
|
$9.000
|
$10.000
|
|
|
CONDT (PVC) (SCH 40) (4") (BORE)
|
LF
|
400.000
|
$30.000
|
$15.500
|
$17.000
|
|
|
ELEC CONDR (NO.8) INSULATED
|
LF
|
700.000
|
$2.000
|
$1.400
|
$1.500
|
|
|
ELEC CONDR (NO.6) INSULATED
|
LF
|
3,565.000
|
$2.000
|
$1.600
|
$1.700
|
|
|
GROUND BOX TY D (162922)W/APRON
|
EA
|
10.000
|
$1,100.000
|
$1,256.000
|
$1,400.000
|
|
|
REMOVE GROUND BOX
|
EA
|
2.000
|
$200.000
|
$356.000
|
$380.000
|
|
|
REMOVE ELECTRICAL SERVICES
|
EA
|
1.000
|
$500.000
|
$356.000
|
$380.000
|
|
|
ELC SRV TY D 120/240 070(NS)SS(E)SP(O)
|
EA
|
1.000
|
$5,700.000
|
$4,514.000
|
$5,000.000
|
|
|
ALUMINUM SIGNS (TY A)
|
SF
|
60.000
|
$17.000
|
$19.000
|
$27.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
|
EA
|
2.000
|
$570.000
|
$526.000
|
$575.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
|
EA
|
3.000
|
$670.000
|
$516.000
|
$550.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(U)
|
EA
|
7.000
|
$560.000
|
$587.000
|
$625.000
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(T)
|
EA
|
1.000
|
$680.000
|
$665.000
|
$700.000
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(U)
|
EA
|
1.000
|
$870.000
|
$643.000
|
$670.000
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(U-1EXT)
|
EA
|
2.000
|
$950.000
|
$793.000
|
$850.000
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(U-2EXT)
|
EA
|
4.000
|
$1,200.000
|
$816.000
|
$900.000
|
|
|
IN SM RD SN SUP&AM TYTWT(1)WS(P)
|
EA
|
14.000
|
$360.000
|
$266.000
|
$300.000
|
|
|
IN BRIDGE MNT CLEARANCE SGN ASSM(TY N)
|
EA
|
2.000
|
$2,200.000
|
$2,150.000
|
$2,700.000
|
|
|
IN SM RD SN SUP&AM (RAIL MOUNT)
|
EA
|
1.000
|
$3,300.000
|
$338.000
|
$2,800.000
|
|
|
RELOCATE SM RD SN SUP&AM TY 10BWG
|
EA
|
1.000
|
$750.000
|
$295.000
|
$350.000
|
|
|
REMOVE SM RD SN SUP&AM
|
EA
|
16.000
|
$90.000
|
$92.000
|
$100.000
|
|
|
INSTL DEL ASSM (D-SW)SZ (BRF)CTB
|
EA
|
30.000
|
$25.000
|
$28.000
|
$14.000
|
|
|
INSTL DEL ASSM (D-SW)SZ (BRF)GF1
|
EA
|
10.000
|
$27.000
|
$28.000
|
$20.000
|
|
|
INSTL DEL ASSM (D-SY)SZ (BRF)CTB
|
EA
|
16.000
|
$28.000
|
$28.000
|
$14.000
|
|
|
INSTL OM ASSM (OM-2Z)(FLX)GND
|
EA
|
2.000
|
$60.000
|
$28.000
|
$75.000
|
|
|
WK ZN PAV MRK REMOV (REFL) TY I-C
|
EA
|
325.000
|
$4.000
|
$4.000
|
$4.500
|
|
|
WK ZN PAV MRK REMOV (REFL) TY II-A-A
|
EA
|
875.000
|
$3.200
|
$4.000
|
$4.500
|
|
|
WK ZN PAV MRK REMOV (TRAF BTN) TY W
|
EA
|
2,993.000
|
$3.250
|
$3.250
|
$3.500
|
|
|
WK ZN PAV MRK REMOV (TRAF BTN) TY Y
|
EA
|
1,829.000
|
$3.250
|
$3.250
|
$3.500
|
|
|
WK ZN PAV MRK REMOV (W)24"(SLD)
|
LF
|
321.000
|
$8.500
|
$12.000
|
$13.000
|
|
|
WK ZN PAV MRK REMOV (W)(ARROW)
|
EA
|
26.000
|
$160.000
|
$150.000
|
$170.000
|
|
|
WK ZN PAV MRK REMOV (W)(DBL ARROW)
|
EA
|
7.000
|
$225.000
|
$200.000
|
$210.000
|
|
|
WK ZN PAV MRK REMOV (W)(WORD)
|
EA
|
18.000
|
$170.000
|
$150.000
|
$160.000
|
|
WK ZN PAV MRK SHT TERM (TAB)TY W
|
EA
|
267.000
|
$0.720
|
$1.000
|
$1.000
|
|
WK ZN PAV MRK SHT TERM (TAB)TY Y-2
|
EA
|
262.000
|
$0.420
|
$1.000
|
$1.000
|
|
REFL PAV MRK TY I (W)8"(DOT)(100MIL)
|
LF
|
90.000
|
$1.850
|
$1.500
|
$1.600
|
|
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
|
LF
|
2,638.000
|
$0.700
|
$1.100
|
$1.200
|
|
REFL PAV MRK TY I (W)24"(SLD)(100MIL)
|
LF
|
759.000
|
$7.000
|
$5.100
|
$5.500
|
|
REFL PAV MRK TY I (W)(ARROW)(100MIL)
|
EA
|
20.000
|
$120.000
|
$130.000
|
$140.000
|
|
REFL PAV MRK TY I(W)(DBL ARROW)(100MIL)
|
EA
|
5.000
|
$170.000
|
$190.000
|
$200.000
|
|
REFL PAV MRK TY I (W)(WORD)(100MIL)
|
EA
|
20.000
|
$140.000
|
$130.000
|
$140.000
|
|
REF PAV MRK TY I(W)36"(YLD TRI)(100MIL)
|
EA
|
4.000
|
$80.000
|
$25.000
|
$27.000
|
|
|
PAVEMENT SEALER 4"
|
LF
|
1,140.000
|
$0.070
|
$0.200
|
$0.200
|
|
|
PAVEMENT SEALER 8"
|
LF
|
393.000
|
$0.440
|
$0.400
|
$0.380
|
|
|
PAVEMENT SEALER (ARROW)
|
EA
|
2.000
|
$35.000
|
$45.000
|
$50.000
|
|
|
PAVEMENT SEALER (WORD)
|
EA
|
3.000
|
$40.000
|
$45.000
|
$50.000
|
|
RE PM W/RET REQ TY I (W)4"(BRK)(100MIL)
|
LF
|
300.000
|
$0.320
|
$2.000
|
$2.000
|
|
RE PM W/RET REQ TY I (W)4"(SLD)(100MIL)
|
LF
|
3,135.000
|
$0.300
|
$0.450
|
$0.500
|
|
RE PM W/RET REQ TY I (Y)4"(SLD)(100MIL)
|
LF
|
5,410.000
|
$0.310
|
$0.450
|
$0.500
|
|
REFL PAV MRKR TY I-C
|
EA
|
139.000
|
$3.400
|
$5.000
|
$5.000
|
|
REFL PAV MRKR TY II-A-A
|
EA
|
243.000
|
$3.000
|
$5.000
|
$5.000
|
|
|
ELIM EXT PAV MRK & MRKS (4")
|
LF
|
10,862.000
|
$0.270
|
$0.300
|
$0.320
|
|
|
ELIM EXT PAV MRK & MRKS (8")
|
LF
|
1,307.000
|
$0.650
|
$0.600
|
$0.650
|
|
|
ELIM EXT PAV MRK & MRKS (24")
|
LF
|
197.000
|
$2.500
|
$1.250
|
$1.300
|
|
|
ELIM EXT PAV MRK & MRKS (ARROW)
|
EA
|
15.000
|
$35.000
|
$10.000
|
$11.000
|
|
|
ELIM EXT PAV MRK & MRKS (WORD)
|
EA
|
12.000
|
$24.000
|
$10.000
|
$11.000
|
|
|
ELIM EXT PV MRK & MRKS (RUMBLE STRIP)
|
LF
|
160.000
|
$1.000
|
$2.000
|
$2.000
|
|
|
PAV SURF PREP FOR MRK (4")
|
LF
|
1,540.000
|
$0.080
|
$0.100
|
$0.050
|
|
|
PAV SURF PREP FOR MRK (8")
|
LF
|
393.000
|
$0.050
|
$0.100
|
$0.100
|
|
|
PAV SURF PREP FOR MRK (ARROW)
|
EA
|
2.000
|
$13.000
|
$5.000
|
$5.000
|
|
|
PAV SURF PREP FOR MRK (WORD)
|
EA
|
3.000
|
$13.000
|
$5.000
|
$5.000
|
|
|
REMOVING TRAFFIC SIGNALS
|
EA
|
1.000
|
$4,000.000
|
$11,117.000
|
$12,000.000
|
|
|
INSTALL HWY TRF SIG (UPGRADE)
|
EA
|
1.000
|
$8,000.000
|
$20,163.000
|
$22,000.000
|
|
|
TEMP TRAF SIGNALS
|
EA
|
1.000
|
$42,500.000
|
$189,818.000
|
$200,000.000
|
|
|
VEH SIG SEC (12")LED(GRN)
|
EA
|
14.000
|
$250.000
|
$155.000
|
$170.000
|
|
|
VEH SIG SEC (12")LED(GRN ARW)
|
EA
|
4.000
|
$250.000
|
$155.000
|
$170.000
|
|
|
VEH SIG SEC (12")LED(YEL)
|
EA
|
15.000
|
$250.000
|
$155.000
|
$170.000
|
|
|
VEH SIG SEC (12")LED(YEL ARW)
|
EA
|
4.000
|
$250.000
|
$155.000
|
$170.000
|
|
|
VEH SIG SEC (12")LED(RED)
|
EA
|
16.000
|
$250.000
|
$155.000
|
$170.000
|
|
|
VEH SIG SEC (12")LED(RED ARW)
|
EA
|
2.000
|
$250.000
|
$155.000
|
$170.000
|
|
|
PED SIG SEC (LED)(COUNTDOWN)
|
EA
|
8.000
|
$600.000
|
$414.000
|
$450.000
|
|
|
BACK PLATE (12")(3 SEC)
|
EA
|
14.000
|
$100.000
|
$76.000
|
$80.000
|
|
|
BACK PLATE (12")(4 SEC)
|
EA
|
2.000
|
$100.000
|
$87.000
|
$90.000
|
|
|
BACK PLATE (12")(5 SEC)
|
EA
|
1.000
|
$100.000
|
$98.000
|
$100.000
|
|
|
TRF SIG CBL (TY A)(12 AWG)(7 CONDR)
|
LF
|
9,370.000
|
$3.000
|
$2.300
|
$2.400
|
|
|
INS TRF SIG PL AM(S)1 ARM(40')
|
EA
|
2.000
|
$10,250.000
|
$7,640.000
|
$8,000.000
|
|
|
INS TRF SIG PL AM(S)1 ARM(50')
|
EA
|
2.000
|
$23,000.000
|
$13,600.000
|
$15,000.000
|
|
|
PED POLE ASSEMBLY
|
EA
|
7.000
|
$2,100.000
|
$1,140.000
|
$1,200.000
|
|
|
PED DETECT PUSH BUTTON (APS)
|
EA
|
8.000
|
$800.000
|
$1,051.000
|
$1,200.000
|
|
|
CNC CRACK REPAIR (DISCRETE)(GRAVITY)
|
LF
|
653.000
|
$22.000
|
$40.000
|
$50.000
|
|
|
TRANSPLANT PLANT MATERIAL
|
EA
|
2.000
|
$1,500.000
|
$500.000
|
$2,400.000
|
|
|
BONDING COURSE
|
GAL
|
189.000
|
$3.500
|
$100.000
|
$4.000
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
EA
|
6.000
|
$10,000.000
|
$12,704.000
|
$10,000.000
|
|
|
VIVDS PROCESSOR SYSTEM
|
EA
|
3.000
|
$6,000.000
|
$6,121.000
|
$6,500.000
|
|
|
VIVDS CAMERA ASSEMBLY
|
EA
|
6.000
|
$1,800.000
|
$1,329.000
|
$1,500.000
|
|
|
VIVDS SET-UP SYSTEM
|
EA
|
1.000
|
$1,000.000
|
$590.000
|
$600.000
|
|
|
VIVDS COMMUNICATION CABLE (COAXIAL)
|
LF
|
3,895.000
|
$3.700
|
$2.200
|
$2.400
|
|
|
CCTV FIELD EQUIPMENT (DIGITAL)
|
EA
|
1.000
|
$8,900.000
|
$8,291.000
|
$9,000.000
|
|
|
PREFORMED IN-LANE(TRANS) RUMBLE STRIP
|
LF
|
160.000
|
$3.340
|
$27.000
|
$32.000
|
|
|
TMA (STATIONARY)
|
EA
|
2.000
|
$8,000.000
|
$36,000.000
|
$30,000.000
|
|
|
TMA (STATIONARY)
|
DAY
|
21.000
|
$300.000
|
$2,000.000
|
$350.000
|
|
|
TMA (MOBILE OPERATION)
|
DAY
|
6.000
|
$300.000
|
$650.000
|
$350.000
|
|
|
CLEANING SUBSTRUCTURE (ABUT)
|
EA
|
2.000
|
$2,000.000
|
$5,400.000
|
$1,500.000
|
|
Totals: |
$3,345,680.250
|
$4,040,320.500
|
$5,559,770.430
|