MADISON SH 21 (0117-05-054)

Items: 190

County: MADISON
Length: N/A
Highway: SH 21
District: BRYAN
Control Number: 0117-05-054
DBE Goal: N/A
Project: NH 2020(090)
Guaranty: N/A
Time: 149 WORKING DAYS
Engineer's Estimate: $3,345,680.25
Date: 10/03/2019 (6 years ago)
Contract Number: N/A
Type: BRIDGE WIDENING
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice HCS Excel Tabs Print Print Notice
Pay Estimates:
Bidders (2)
E
Engineer's Estimate
$3,345,680.25
$4,040,320.50
Over/Under Est: 20.76% $694,640.25
Over/Under Est: 66.18% $2,214,090.18
Amt Left: 37.61% $1,519,449.93

Bid Items & Bid Tabulations

190 Total 0 of 190
MADISON  |  SH 21  |  BRYAN  |  0117-05-054  |  10/03/2019  |  $3,345,680.25  |  NH 2020(090)  |  BRIDGE WIDENING  |  149 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
FUSED INDUSTRIES, LLC
ANGEL BROTHERS HOLDINGS CORP.
PREPARING ROW
STA 10.700 $400.000 $5,000.000 $30,000.000
PREPARING ROW(TREE)(5" TO 12" DIA)
EA 2.000 $500.000 $3,500.000 $1,500.000
RMV TRT BASE & ASPH PAV (0"-19")
SY 152.000 $6.000 $7.000 $50.000
EXCAVATION (ROADWAY)
CY 720.000 $11.000 $17.000 $34.000
EMBANKMENT (FINAL)(ORD COMP)(TY C)
CY 1,630.000 $14.000 $22.000 $34.000
EMBANKMENT (VEHICLE)(ORD COMP)(TY C)
CY 19.000 $26.000 $62.000 $160.000
SPEC EXCAV WORK (BACKHOE)
HR 8.000 $180.000 $167.000 $170.000
BLOCK SODDING
SY 1,190.000 $5.250 $3.500 $7.000
VEGETATIVE WATERING
MG 12.000 $12.500 $32.000 $70.000
PLANT MAINTENANCE
MO 3.000 $1,000.000 $1,627.000 $3,000.000
FL BS (CMP IN PLC)(TY E GR 4)(FNAL POS)
CY 19.000 $30.000 $161.000 $500.000
FL BS (CMP IN PLC)(TY D GR1-2)(8")
SY 1,741.000 $15.000 $25.000 $35.000
CEMENT
TON 19.000 $150.000 $245.000 $400.000
CEMENT TREAT (SUBGRADE)(9")
SY 1,741.000 $8.000 $5.000 $11.000
CEM TRT(PLNT MX)(CLN)(TY D)(GR1-2)(10")
SY 616.000 $40.000 $28.000 $44.000
PRIME COAT (MC-30 OR EC-30)
GAL 471.000 $3.650 $14.000 $14.000
SUPERPAVE MIXTURES SP-B PG64-22
TON 648.000 $78.000 $170.000 $135.000
SUPERPAVE MIXTURES SP-C SAC-A PG70-22
TON 1,187.000 $73.000 $199.000 $132.000
FLEXIBLE PAVEMENT STRUCTURE REPAIR(8")
SY 5,000.000 $40.000 $14.000 $50.000
PLAN & TEXT ASPH CONC PAV(0" TO 2")
SY 7,419.000 $1.500 $8.000 $7.000
CEM STABIL BKFL
CY 131.000 $87.000 $53.000 $160.000
CUT & RESTORING PAV
SY 19.000 $100.000 $150.000 $270.000
FLOWABLE BACKFILL
CY 6.000 $215.000 $210.000 $500.000
TRENCH EXCAVATION PROTECTION
LF 30.000 $20.000 $40.000 $28.000
DRILL SHAFT (36 IN)
LF 752.000 $180.000 $265.000 $400.000
DRILL SHAFT (HIGH MAST POLE) (60 IN)
LF 66.000 $600.000 $1,012.000 $1,000.000
DRILL SHAFT (TRF SIG POLE) (24 IN)
LF 42.000 $250.000 $152.000 $140.000
DRILL SHAFT (TRF SIG POLE) (36 IN)
LF 28.000 $300.000 $308.000 $300.000
DRILL SHAFT (TRF SIG POLE) (48 IN)
LF 44.000 $425.000 $393.000 $380.000
CL C CONC (ABUT)(EXTEND)
CY 42.200 $1,200.000 $1,500.000 $1,800.000
CL C CONC (CAP)
CY 49.200 $1,500.000 $1,250.000 $1,800.000
CL C CONC (COLUMN)
CY 56.100 $1,400.000 $1,400.000 $1,200.000
CL C CONC (COLLAR)
EA 1.000 $500.000 $840.000 $1,000.000
CL C CONC (VEH DEFL WALL)
CY 237.800 $1,700.000 $790.000 $1,000.000
CL C CONC(PILE ENCASEMENT)
LF 36.000 $500.000 $495.000 $700.000
REINF CONC SLAB (EXTEND SLAB)
SF 9,662.000 $21.000 $23.000 $36.000
APPROACH SLAB (EXTEND)
CY 64.200 $525.000 $630.000 $900.000
PRESTR CONC GIRDER (TX28)
LF 1,139.970 $147.000 $200.000 $200.000
CONC STR REPAIR (VERTICAL & OVERHEAD)
SF 20.000 $180.000 $540.000 $300.000
RIPRAP (CONC)(4 IN)
CY 168.000 $400.000 $500.000 $600.000
RIPRAP (CONC)(CL B)(RR8&RR9)
CY 15.000 $470.000 $600.000 $1,000.000
RIPRAP (CONC) (CL B) (4")
CY 4.600 $425.000 $600.000 $700.000
RIPRAP (STONE PROTECTION)(18 IN)
CY 200.000 $100.000 $180.000 $260.000
RIPRAP (MOW STRIP)(4 IN)
CY 47.000 $400.000 $700.000 $800.000
CLEANING AND SEALING EXIST JOINTS(CL7)
LF 87.000 $40.000 $135.000 $55.000
MULTI-LAYER POLYMER OVERLAY
SY 267.000 $45.000 $350.000 $65.000
STR STEEL (MISC NON - BRIDGE)
LB 276.000 $5.000 $25.000 $15.000
SPOT CLEAN & PAINT EXT STR(SPL PRT SYS)
LS 1.000 $7,500.000 $13,500.000 $60,000.000
RAIL (TY T224)
LF 516.000 $246.000 $150.000 $135.000
RAIL (TY PR22)
LF 246.000 $80.000 $120.000 $135.000
ARMOR JOINT (SEALED)
LF 166.000 $66.000 $67.000 $100.000
RC PIPE (CL IV)(24 IN)
LF 110.000 $76.000 $95.000 $250.000
JCTBOX(COMPL)(PJB)(3FTX3FT)
EA 1.000 $4,000.000 $3,200.000 $5,000.000
INLET(COMPL)(PSL)(SFG)(3FTX3FT-3FTX3FT)
EA 1.000 $4,000.000 $3,500.000 $4,500.000
SET (TY II) (24 IN) (RCP) (6: 1) (C)
EA 1.000 $1,200.000 $1,700.000 $1,700.000
SHOT BLASTING
SY 267.000 $5.500 $90.000 $11.000
REMOV STR (SET)
EA 2.000 $250.000 $350.000 $1,100.000
REMOV STR (PIPE)
LF 10.000 $15.000 $75.000 $85.000
REMOVE STR (CONC)
EA 3.000 $3,000.000 $3,200.000 $6,000.000
REMOV STR (BRIDGE SLAB)
LF 460.000 $30.000 $140.000 $180.000
MOBILIZATION
LS 1.000 $300,000.000 $202,000.000 $580,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 8.000 $7,500.000 $11,300.000 $55,000.000
ROCK FILTER DAMS (INSTALL) (TY 1)
LF 45.000 $33.000 $55.000 $40.000
ROCK FILTER DAMS (REMOVE)
LF 45.000 $8.000 $28.000 $11.000
TEMP SEDMT CONT FENCE (INSTALL)
LF 439.000 $2.500 $5.000 $3.700
TEMP SEDMT CONT FENCE (REMOVE)
LF 439.000 $0.530 $3.000 $1.100
BIODEG EROSN CONT LOGS (INSTL) (8")
LF 30.000 $6.000 $10.000 $4.400
BIODEG EROSN CONT LOGS (REMOVE)
LF 30.000 $1.000 $4.000 $1.000
CONSTRUCTING DETOURS
SY 140.000 $70.000 $268.000 $170.000
PORT CTB (FUR & INST)(LOW PROF)(TY 1)
LF 520.000 $35.000 $86.000 $75.000
PORT CTB (FUR & INST)(LOW PROF)(TY 2)
LF 40.000 $40.000 $90.000 $75.000
PORT CTB (MOVE)(LOW PROF)(TY 1)
LF 500.000 $5.000 $2.000 $30.000
PORT CTB (MOVE)(LOW PROF)(TY 2)
LF 40.000 $8.000 $5.000 $30.000
PORT CTB (REMOVE)(LOW PROF)(TY 1)
LF 520.000 $8.000 $15.000 $20.000
PORT CTB (REMOVE)(LOW PROF)(TY 2)
LF 40.000 $9.000 $16.000 $20.000
PTB (FRN&INSTL)(F SHAPE)(TY 1) OR (STL)
LF 1,800.000 $40.000 $70.000 $60.000
PTB (REMOVE)(F SHAPE)(TY 1) OR (STL)
LF 1,800.000 $11.000 $15.000 $15.000
CONC SIDEWALKS (4")
SY 373.000 $55.000 $80.000 $140.000
CURB RAMPS (TY 1)
EA 2.000 $1,500.000 $4,000.000 $4,500.000
CURB RAMPS (TY 7)
EA 6.000 $1,500.000 $3,000.000 $4,500.000
MTL W-BEAM GD FEN (TIM POST)
LF 400.000 $20.000 $23.000 $21.000
MTL BEAM GD FEN TRANS (THRIE-BEAM)
EA 4.000 $1,950.000 $1,600.000 $2,200.000
DOWNSTREAM ANCHOR TERMINAL SECTION
EA 2.000 $1,150.000 $1,300.000 $1,400.000
MTL BM GD FEN TRANS (NON - SYM)
EA 2.000 $880.000 $850.000 $850.000
REMOVE METAL BEAM GUARD FENCE
LF 550.000 $2.150 $5.000 $3.000
RM MTL BM GD FENCE TRANS (THRIE-BEAM)
EA 2.000 $250.000 $250.000 $370.000
RM MTL BM GD FEN TRANS (T101)
EA 4.000 $165.000 $200.000 $270.000
GUARDRAIL END TREATMENT (INSTALL)
EA 4.000 $2,700.000 $2,480.000 $2,700.000
GUARDRAIL END TREATMENT (REMOVE)
EA 6.000 $300.000 $250.000 $270.000
CRASH CUSH ATTEN (REMOVE)
EA 6.000 $1,200.000 $2,477.000 $1,400.000
CRASH CUSH ATTEN (INSTL)(L)(N)(TL3)
EA 2.000 $25,000.000 $27,000.000 $30,000.000
CRASH CUSH ATTEN (INSTL)(S)(N)(TL3)
EA 4.000 $8,000.000 $8,587.000 $11,000.000
REMOVE RD IL ASM (TRANS-BASE)
EA 3.000 $600.000 $445.000 $500.000
HI MST IL POLE (150 FT)( 80 MPH)
EA 2.000 $32,500.000 $32,195.000 $34,000.000
HI MST IL ASM (12-400W)(SYM)
EA 2.000 $25,000.000 $26,862.000 $29,000.000
CONDT (PVC) (SCH 40) (2")
LF 895.000 $10.000 $7.500 $8.000
CONDT (PVC) (SCH 40) (2") (BORE)
LF 515.000 $30.000 $14.200 $16.000
CONDT (PVC) (SCH 40) (4")
LF 620.000 $20.000 $9.000 $10.000
CONDT (PVC) (SCH 40) (4") (BORE)
LF 400.000 $30.000 $15.500 $17.000
ELEC CONDR (NO.8) INSULATED
LF 700.000 $2.000 $1.400 $1.500
ELEC CONDR (NO.6) INSULATED
LF 3,565.000 $2.000 $1.600 $1.700
GROUND BOX TY D (162922)W/APRON
EA 10.000 $1,100.000 $1,256.000 $1,400.000
REMOVE GROUND BOX
EA 2.000 $200.000 $356.000 $380.000
REMOVE ELECTRICAL SERVICES
EA 1.000 $500.000 $356.000 $380.000
ELC SRV TY D 120/240 070(NS)SS(E)SP(O)
EA 1.000 $5,700.000 $4,514.000 $5,000.000
ALUMINUM SIGNS (TY A)
SF 60.000 $17.000 $19.000 $27.000
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
EA 2.000 $570.000 $526.000 $575.000
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
EA 3.000 $670.000 $516.000 $550.000
IN SM RD SN SUP&AM TY10BWG(1)SA(U)
EA 7.000 $560.000 $587.000 $625.000
IN SM RD SN SUP&AM TYS80(1)SA(T)
EA 1.000 $680.000 $665.000 $700.000
IN SM RD SN SUP&AM TYS80(1)SA(U)
EA 1.000 $870.000 $643.000 $670.000
IN SM RD SN SUP&AM TYS80(1)SA(U-1EXT)
EA 2.000 $950.000 $793.000 $850.000
IN SM RD SN SUP&AM TYS80(1)SA(U-2EXT)
EA 4.000 $1,200.000 $816.000 $900.000
IN SM RD SN SUP&AM TYTWT(1)WS(P)
EA 14.000 $360.000 $266.000 $300.000
IN BRIDGE MNT CLEARANCE SGN ASSM(TY N)
EA 2.000 $2,200.000 $2,150.000 $2,700.000
IN SM RD SN SUP&AM (RAIL MOUNT)
EA 1.000 $3,300.000 $338.000 $2,800.000
RELOCATE SM RD SN SUP&AM TY 10BWG
EA 1.000 $750.000 $295.000 $350.000
REMOVE SM RD SN SUP&AM
EA 16.000 $90.000 $92.000 $100.000
INSTL DEL ASSM (D-SW)SZ (BRF)CTB
EA 30.000 $25.000 $28.000 $14.000
INSTL DEL ASSM (D-SW)SZ (BRF)GF1
EA 10.000 $27.000 $28.000 $20.000
INSTL DEL ASSM (D-SY)SZ (BRF)CTB
EA 16.000 $28.000 $28.000 $14.000
INSTL OM ASSM (OM-2Z)(FLX)GND
EA 2.000 $60.000 $28.000 $75.000
WK ZN PAV MRK REMOV (REFL) TY I-C
EA 325.000 $4.000 $4.000 $4.500
WK ZN PAV MRK REMOV (REFL) TY II-A-A
EA 875.000 $3.200 $4.000 $4.500
WK ZN PAV MRK REMOV (TRAF BTN) TY W
EA 2,993.000 $3.250 $3.250 $3.500
WK ZN PAV MRK REMOV (TRAF BTN) TY Y
EA 1,829.000 $3.250 $3.250 $3.500
WK ZN PAV MRK REMOV (W)24"(SLD)
LF 321.000 $8.500 $12.000 $13.000
WK ZN PAV MRK REMOV (W)(ARROW)
EA 26.000 $160.000 $150.000 $170.000
WK ZN PAV MRK REMOV (W)(DBL ARROW)
EA 7.000 $225.000 $200.000 $210.000
WK ZN PAV MRK REMOV (W)(WORD)
EA 18.000 $170.000 $150.000 $160.000
WK ZN PAV MRK SHT TERM (TAB)TY W
EA 267.000 $0.720 $1.000 $1.000
WK ZN PAV MRK SHT TERM (TAB)TY Y-2
EA 262.000 $0.420 $1.000 $1.000
REFL PAV MRK TY I (W)8"(DOT)(100MIL)
LF 90.000 $1.850 $1.500 $1.600
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
LF 2,638.000 $0.700 $1.100 $1.200
REFL PAV MRK TY I (W)24"(SLD)(100MIL)
LF 759.000 $7.000 $5.100 $5.500
REFL PAV MRK TY I (W)(ARROW)(100MIL)
EA 20.000 $120.000 $130.000 $140.000
REFL PAV MRK TY I(W)(DBL ARROW)(100MIL)
EA 5.000 $170.000 $190.000 $200.000
REFL PAV MRK TY I (W)(WORD)(100MIL)
EA 20.000 $140.000 $130.000 $140.000
REF PAV MRK TY I(W)36"(YLD TRI)(100MIL)
EA 4.000 $80.000 $25.000 $27.000
PAVEMENT SEALER 4"
LF 1,140.000 $0.070 $0.200 $0.200
PAVEMENT SEALER 8"
LF 393.000 $0.440 $0.400 $0.380
PAVEMENT SEALER (ARROW)
EA 2.000 $35.000 $45.000 $50.000
PAVEMENT SEALER (WORD)
EA 3.000 $40.000 $45.000 $50.000
RE PM W/RET REQ TY I (W)4"(BRK)(100MIL)
LF 300.000 $0.320 $2.000 $2.000
RE PM W/RET REQ TY I (W)4"(SLD)(100MIL)
LF 3,135.000 $0.300 $0.450 $0.500
RE PM W/RET REQ TY I (Y)4"(SLD)(100MIL)
LF 5,410.000 $0.310 $0.450 $0.500
REFL PAV MRKR TY I-C
EA 139.000 $3.400 $5.000 $5.000
REFL PAV MRKR TY II-A-A
EA 243.000 $3.000 $5.000 $5.000
ELIM EXT PAV MRK & MRKS (4")
LF 10,862.000 $0.270 $0.300 $0.320
ELIM EXT PAV MRK & MRKS (8")
LF 1,307.000 $0.650 $0.600 $0.650
ELIM EXT PAV MRK & MRKS (24")
LF 197.000 $2.500 $1.250 $1.300
ELIM EXT PAV MRK & MRKS (ARROW)
EA 15.000 $35.000 $10.000 $11.000
ELIM EXT PAV MRK & MRKS (WORD)
EA 12.000 $24.000 $10.000 $11.000
ELIM EXT PV MRK & MRKS (RUMBLE STRIP)
LF 160.000 $1.000 $2.000 $2.000
PAV SURF PREP FOR MRK (4")
LF 1,540.000 $0.080 $0.100 $0.050
PAV SURF PREP FOR MRK (8")
LF 393.000 $0.050 $0.100 $0.100
PAV SURF PREP FOR MRK (ARROW)
EA 2.000 $13.000 $5.000 $5.000
PAV SURF PREP FOR MRK (WORD)
EA 3.000 $13.000 $5.000 $5.000
REMOVING TRAFFIC SIGNALS
EA 1.000 $4,000.000 $11,117.000 $12,000.000
INSTALL HWY TRF SIG (UPGRADE)
EA 1.000 $8,000.000 $20,163.000 $22,000.000
TEMP TRAF SIGNALS
EA 1.000 $42,500.000 $189,818.000 $200,000.000
VEH SIG SEC (12")LED(GRN)
EA 14.000 $250.000 $155.000 $170.000
VEH SIG SEC (12")LED(GRN ARW)
EA 4.000 $250.000 $155.000 $170.000
VEH SIG SEC (12")LED(YEL)
EA 15.000 $250.000 $155.000 $170.000
VEH SIG SEC (12")LED(YEL ARW)
EA 4.000 $250.000 $155.000 $170.000
VEH SIG SEC (12")LED(RED)
EA 16.000 $250.000 $155.000 $170.000
VEH SIG SEC (12")LED(RED ARW)
EA 2.000 $250.000 $155.000 $170.000
PED SIG SEC (LED)(COUNTDOWN)
EA 8.000 $600.000 $414.000 $450.000
BACK PLATE (12")(3 SEC)
EA 14.000 $100.000 $76.000 $80.000
BACK PLATE (12")(4 SEC)
EA 2.000 $100.000 $87.000 $90.000
BACK PLATE (12")(5 SEC)
EA 1.000 $100.000 $98.000 $100.000
TRF SIG CBL (TY A)(12 AWG)(7 CONDR)
LF 9,370.000 $3.000 $2.300 $2.400
INS TRF SIG PL AM(S)1 ARM(40')
EA 2.000 $10,250.000 $7,640.000 $8,000.000
INS TRF SIG PL AM(S)1 ARM(50')
EA 2.000 $23,000.000 $13,600.000 $15,000.000
PED POLE ASSEMBLY
EA 7.000 $2,100.000 $1,140.000 $1,200.000
PED DETECT PUSH BUTTON (APS)
EA 8.000 $800.000 $1,051.000 $1,200.000
CNC CRACK REPAIR (DISCRETE)(GRAVITY)
LF 653.000 $22.000 $40.000 $50.000
TRANSPLANT PLANT MATERIAL
EA 2.000 $1,500.000 $500.000 $2,400.000
BONDING COURSE
GAL 189.000 $3.500 $100.000 $4.000
PORTABLE CHANGEABLE MESSAGE SIGN
EA 6.000 $10,000.000 $12,704.000 $10,000.000
VIVDS PROCESSOR SYSTEM
EA 3.000 $6,000.000 $6,121.000 $6,500.000
VIVDS CAMERA ASSEMBLY
EA 6.000 $1,800.000 $1,329.000 $1,500.000
VIVDS SET-UP SYSTEM
EA 1.000 $1,000.000 $590.000 $600.000
VIVDS COMMUNICATION CABLE (COAXIAL)
LF 3,895.000 $3.700 $2.200 $2.400
CCTV FIELD EQUIPMENT (DIGITAL)
EA 1.000 $8,900.000 $8,291.000 $9,000.000
PREFORMED IN-LANE(TRANS) RUMBLE STRIP
LF 160.000 $3.340 $27.000 $32.000
TMA (STATIONARY)
EA 2.000 $8,000.000 $36,000.000 $30,000.000
TMA (STATIONARY)
DAY 21.000 $300.000 $2,000.000 $350.000
TMA (MOBILE OPERATION)
DAY 6.000 $300.000 $650.000 $350.000
CLEANING SUBSTRUCTURE (ABUT)
EA 2.000 $2,000.000 $5,400.000 $1,500.000
Totals: $3,345,680.250 $4,040,320.500 $5,559,770.430