LUBBOCK FM 835 (0933-01-044)

Items: 86

County: LUBBOCK
Length: 0.0000 MILES
Highway: FM 835
District: LUBBOCK
Control Number: 0933-01-044
DBE Goal: 0.0%
Project: BR 2026(481)
Guaranty: $90,000.00
Time: 198 WORKING DAYS
Engineer's Estimate: $4,462,426.10
Date: 04/07/2026 (2 months ago)
Contract Number: 4263014
Type: BRIDGE REPLACEMENT
Project ID: A00207258
Contract Type: Federal
Project Description: BRIDGE REPLACEMENT ON FM 835
Mail/Deliver Bids To:
TEXAS DEPARTMENT OF TRANSPORTATION
ATTN: CONSTRUCTION DIVISION - RM M1C3.02
6230 E STASSNEY LN, AUSTIN, TX 78744
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice Questions HCS Excel Tabs Print Print Notice
Bidders (2)
E
Engineer's Estimate
$4,462,426.10
1
$5,991,100.00
Over/Under Est: 34.26% $1,528,673.90
$8,396,936.50
Over/Under Est: 88.17% $3,934,510.40
Amt Left: 40.16% $2,405,836.50

Bid Items & Bid Tabulations

86 Total 0 of 86
LUBBOCK  |  FM 835  |  LUBBOCK  |  0933-01-044  |  04/07/2026  |  $4,462,426.10  |  BR 2026(481)  |  BRIDGE REPL  |  198 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
WEBBER, LLC
FNF CONSTRUCTION, INC.
PREPARING ROW
STA 7.000 $9,000.000 $82,800.000 $4,000.000
PREP ROW (TREE REMOVE) (12"-24" DIA)
EA 7.000 $2,500.000 $1,550.000 $1,400.000
PREP ROW (TREE REMOVE) (24"-36" DIA)
EA 2.000 $3,000.000 $2,900.000 $2,500.000
PREP ROW (TREE REMOVE) (36"-48" DIA)
EA 3.000 $5,000.000 $3,875.000 $3,000.000
REMOV CONC (RIPRAP)
SY 1,658.000 $35.000 $16.000 $20.000
RMV (12") TRT/UNTRT BASE & ASPH PAV
SY 2,818.000 $14.000 $20.700 $22.000
EXCAV (ROADWAY)
CY 1,302.000 $32.000 $18.700 $6.000
EMBANK (FNL)(DC)(TY C)
CY 922.000 $40.000 $15.000 $11.000
DRILL SEED (PERM_RURAL_SAND)
SY 3,200.000 $0.250 $2.000 $1.250
PROOF ROLLING
HR 10.000 $250.000 $85.500 $115.000
PRIME COAT (AE-P)
GAL 609.000 $5.250 $14.000 $5.500
EMULS ASPH (EROSN CONT)(CSS-1H)
GAL 832.000 $3.400 $5.500 $3.250
D-GR HMA TY-D SAC-A PG70-28
TON 237.000 $280.000 $255.000 $500.000
TACK COAT
GAL 961.000 $4.250 $6.000 $8.000
D-GR HMA TY-B SAC-B PG70-28
TON 1,313.000 $240.000 $200.000 $275.000
FLOWABLE BACKFILL
CY 205.000 $400.000 $255.000 $400.000
TEMPORARY SPL SHORING (COFFERDAM)
SF 625.000 $20.000 $46.000 $579.000
DRILL SHAFT (24 IN)
LF 120.000 $340.000 $195.000 $600.000
DRILL SHAFT (36 IN)
LF 548.000 $375.000 $240.000 $500.000
CL C CONC (ABUT)(HPC)
CY 56.800 $2,000.000 $3,600.000 $5,000.000
CL C CONC (CAP)
CY 19.200 $1,800.000 $2,400.000 $7,000.000
CL C CONC (CAP)(HPC)
CY 27.600 $2,500.000 $2,900.000 $4,000.000
CL C CONC (COLUMN)(HPC)
CY 12.500 $2,800.000 $2,550.000 $3,000.000
APPROACH SLAB (HPC)
CY 107.000 $1,000.000 $1,500.000 $1,000.000
SLAB SPAN
CY 32.600 $950.000 $2,200.000 $2,500.000
REINF CONC SLAB (PRECAST SUPER ASSEM)
SF 6,790.000 $65.000 $95.500 $140.000
EPOXY WATERPROOF FINISH (TY X)
SF 1,622.000 $15.000 $17.000 $25.000
RIPRAP (CONC)(5 IN)
CY 232.000 $700.000 $750.000 $1,400.000
RIPRAP (MOW STRIP)(5 IN)
CY 49.000 $600.000 $700.000 $600.000
RIPRAP (STONE COMMON)(DRY)(18 IN)
CY 15.000 $350.000 $1,200.000 $260.000
MULTI-LAYER POLYMER OVERLAY
SY 1,078.000 $55.000 $40.000 $90.000
RAIL (TY T223)
LF 390.000 $220.000 $140.000 $350.000
SEALED EXPANSION JOINT (4 IN) (SEJ - M)
LF 106.000 $250.000 $256.000 $350.000
CONC BOX CULV (8 FT X 3 FT)
LF 64.000 $850.000 $825.000 $1,200.000
WINGWALL (SW - 0) (HW=4 FT)
EA 1.000 $15,000.000 $15,002.000 $27,000.000
SET (TY I)(S= 8 FT)(HW= 4 FT)(6:1)(P)
EA 1.000 $30,000.000 $25,000.000 $35,000.000
DIAMOND GRINDING SLAB (ABC)
SY 1,078.000 $12.000 $14.000 $31.000
REMOV STR (BRIDGE 100 - 499 FT LENGTH)
EA 1.000 $250,000.000 $650,000.000 $325,000.000
MOBILIZATION
LS 1.000 $402,300.000 $590,000.000 $833,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 9.000 $13,500.000 $7,000.000 $30,000.000
PORTABLE CHANGEABLE MESSAGE SIGN
DAY 177.000 $85.000 $72.000 $50.000
TMA (STATIONARY)
DAY 25.000 $250.000 $350.000 $200.000
TMA (MOBILE OPERATION)
DAY 3.000 $200.000 $600.000 $1,000.000
ROCK FILTER DAMS (INSTALL) (TY 1)
LF 280.000 $45.000 $40.000 $50.000
ROCK FILTER DAMS (REMOVE)
LF 280.000 $15.000 $15.000 $23.000
CONSTRUCTION EXITS (INSTALL) (TY 1)
SY 444.000 $40.000 $25.000 $50.000
CONSTRUCTION EXITS (REMOVE)
SY 444.000 $15.000 $10.000 $30.000
TEMP SEDMT CONT FENCE (INSTALL)
LF 3,592.000 $8.000 $5.000 $6.000
TEMP SEDMT CONT FENCE (REMOVE)
LF 3,592.000 $4.000 $0.500 $0.500
BIODEG EROSN CONT LOGS (INSTL) (18")
LF 120.000 $9.000 $16.000 $23.000
BIODEG EROSN CONT LOGS (REMOVE)
LF 120.000 $2.500 $3.500 $5.000
PORT CTB (FUR & INST)(SGL SLOPE)(TY 1)
LF 90.000 $60.000 $50.000 $65.000
PORT CTB (MOVE)(SGL SLP)(TY 1)
LF 60.000 $25.000 $20.000 $9.000
PORT CTB (REMOVE)(SGL SLP)(TY 1)
LF 90.000 $30.000 $25.000 $65.000
MTL W-BEAM GD FEN (STEEL POST)
LF 150.000 $30.000 $36.000 $64.000
MTL BEAM GD FEN TRANS (THRIE-BEAM)
EA 3.000 $2,100.000 $2,400.000 $5,300.000
MTL BEAM GD FEN TRANS (TL2)
EA 1.000 $990.000 $1,500.000 $4,000.000
MTL BM GD FEN (LONG SPAN SYSTEM)
EA 1.000 $1,500.000 $1,630.000 $4,000.000
REMOVE METAL BEAM GUARD FENCE
LF 413.000 $4.000 $4.000 $14.000
GUARDRAIL END TREATMENT (INSTALL)
EA 6.000 $3,500.000 $3,600.000 $5,500.000
GUARDRAIL END TREATMENT (REMOVE)
EA 4.000 $180.000 $350.000 $2,150.000
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
EA 1.000 $780.000 $1,350.000 $1,800.000
IN SM RD SN SUP&AM TY10BWG(1)SA(P-BM)
EA 1.000 $960.000 $1,500.000 $2,100.000
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
EA 1.000 $880.000 $1,450.000 $1,800.000
IN SM RD SN SUP&AM TYS80(1)SA(U-BM)
EA 1.000 $1,350.000 $2,000.000 $2,450.000
REMOVE SM RD SN SUP&AM
EA 4.000 $120.000 $100.000 $180.000
INSTL DEL ASSM (D-SW)SZ 1(BRF)CTB (BI)
EA 5.000 $65.000 $200.000 $260.000
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2
EA 9.000 $25.000 $200.000 $260.000
INSTL OM SM RD SIGN (1-OM-PW)Y
EA 3.000 $15.000 $100.000 $120.000
INSTL OM SM RD SIGN (1-OM-PW)R
EA 1.000 $15.000 $100.000 $120.000
RE PM TY II (W) 6" (SLD)
LF 2,740.000 $0.250 $1.500 $2.000
RE PM TY II (W) 12" (SLD)
LF 318.000 $2.300 $7.500 $10.000
RE PM TY II (Y) 6" (SLD)
LF 3,092.000 $0.250 $1.500 $2.000
PREFAB PM TY C (W)(24")(SLD)
LF 18.000 $16.000 $20.000 $28.000
REFL PAV MRKR TY II-A-A
EA 20.000 $4.250 $10.000 $14.000
PAV SURF PREP FOR MRK (6")
LF 2,916.000 $2.000 $2.500 $3.500
PAV SURF PREP FOR MRK (12")
LF 159.000 $4.200 $4.000 $5.500
PAV SURF PREP FOR MRK (24")
LF 18.000 $5.000 $6.000 $8.500
LITTER PICKUP
CYC 1.000 $1,500.000 $500.000 $1,000.000
MOWING, TRIMMING, AND EDGING
CYC 1.000 $1,200.000 $1,000.000 $13,500.000
REINFORCED FAB FOR ASPH PVMNT OVERLAYS
SY 1,364.000 $7.000 $7.000 $14.000
ASPH FOR REINF FAB (PG76-28)
GAL 205.000 $4.000 $325.000 $8.500
TEMP CONSTRUCTION ACCESS
LS 1.000 $250,000.000 $755,000.000 $800,000.000
RAPID SETTING FIBER REINF CONC (RSFRC)
CY 18.400 $7,500.000 $5,000.000 $6,500.000
STR STEEL (PRESS BRAKE)
LB 187,386.000 $4.100 $3.000 $9.500
DEWATERING REPORTS
EA 20.000 $60.000 $60.000 $60.000
Totals: $4,462,426.100 $5,991,100.000 $8,396,936.500
INCLUDES FORCE ACCOUNT WORK AMOUNTS AS FOLLOWS:
Description Amount
ENVIRONMENTAL: CONTRACTOR FORCE ACCOUNT WORK (PART) $10,000.00
EROSION CONTROL MAINTENANCE: CONTRACTOR FORCE ACCOUNT WORK (PART) $9,000.00
SAFETY CONTINGENCY: CONTRACTOR FORCE ACCOUNT WORK (PART) $22,500.00
Total: $41,500.00