PREPARING ROW
|
STA
|
51.000
|
$2,000.000
|
$1,248.000
|
$3,870.200
|
$37,046.190
|
|
|
PREPARING ROW(TREE)(5" TO 12" DIA)
|
EA
|
11.000
|
$400.000
|
$1,258.000
|
$1,400.000
|
$617.440
|
|
|
PREPARING ROW(TREE)(12" TO 24" DIA)
|
EA
|
3.000
|
$1,200.000
|
$1,583.000
|
$3,900.000
|
$1,852.310
|
|
|
DISPOSAL OF WATER WELLS
|
EA
|
2.000
|
$5,000.000
|
$5,838.000
|
$6,000.000
|
$24,697.460
|
|
|
REMOVING CONC (PAV)
|
SY
|
12,525.000
|
$20.000
|
$17.000
|
$24.500
|
$18.520
|
|
|
REMOVING CONC (DRIVEWAYS)
|
SY
|
818.000
|
$20.000
|
$30.000
|
$28.500
|
$18.520
|
|
|
REMOVING CONC (CURB AND GUTTER)
|
LF
|
3,025.000
|
$15.000
|
$14.500
|
$18.500
|
$9.880
|
|
|
REMOVING CONC (SIDEWALK OR RAMP)
|
SY
|
3,349.000
|
$20.000
|
$17.000
|
$14.500
|
$18.520
|
|
|
REMOVING STB BASE AND ASPH PAV(10-14")
|
SY
|
20,284.000
|
$9.000
|
$13.250
|
$16.000
|
$8.750
|
|
|
EXCAVATION (ROADWAY)
|
CY
|
9,589.000
|
$10.000
|
$13.750
|
$6.900
|
$29.090
|
|
|
EXCAVATION (CHANNEL)
|
CY
|
16,400.000
|
$20.000
|
$16.000
|
$23.000
|
$35.330
|
|
|
EMBANKMENT (FINAL)(DENS CONT)(TY C)
|
CY
|
10,750.000
|
$20.000
|
$13.000
|
$51.000
|
$43.220
|
|
|
FURNISHING AND PLACING TOPSOIL (4")
|
SY
|
14,669.000
|
$4.500
|
$3.250
|
$6.700
|
$2.470
|
|
|
BLOCK SODDING
|
SY
|
933.000
|
$4.250
|
$11.750
|
$11.000
|
$11.110
|
|
|
CELL FBR MLCH SEED(PERM)(URBAN)(SANDY)
|
SY
|
13,736.000
|
$0.750
|
$1.000
|
$0.790
|
$0.820
|
|
|
DRILL SEED (TEMP)(WARM OR COOL)
|
SY
|
17,140.000
|
$0.130
|
$0.300
|
$0.300
|
$0.310
|
|
|
BROADCAST SEED (PERM)(SPECIAL MIX)
|
SY
|
20.000
|
$0.250
|
$778.000
|
$6.000
|
$6.170
|
|
|
VEGETATIVE WATERING
|
MG
|
493.000
|
$30.000
|
$51.500
|
$40.000
|
$35.810
|
|
|
PLANT MATERIAL (1-GAL)
|
EA
|
133.000
|
$10.000
|
$1,427.000
|
$72.000
|
$1,728.820
|
|
|
PLANT MATERIAL (5-GAL)
|
EA
|
43.000
|
$25.000
|
$695.000
|
$240.000
|
$3,704.620
|
|
|
PROOF ROLLING
|
HR
|
40.000
|
$150.000
|
$166.000
|
$185.000
|
$246.970
|
|
|
CEMENT
|
TON
|
342.000
|
$175.000
|
$255.000
|
$265.000
|
$228.450
|
|
|
CEMENT TREAT (SUBGRADE)(6")
|
SY
|
40,079.000
|
$3.000
|
$5.750
|
$4.800
|
$6.170
|
|
|
PRIME COAT (MC-30)
|
GAL
|
7,838.000
|
$4.500
|
$7.000
|
$6.850
|
$9.880
|
|
|
FLEXIBLE PAVEMENT STRUCTURE REPAIR(6")
|
SY
|
1,015.000
|
$50.000
|
$72.000
|
$99.000
|
$154.360
|
|
|
CONC PVMT (CONT REINF - CRCP) (9")
|
SY
|
36,064.000
|
$110.000
|
$106.000
|
$120.000
|
$153.770
|
|
|
CEM STABIL BKFL
|
CY
|
40.000
|
$100.000
|
$131.000
|
$240.000
|
$76.040
|
|
|
TRENCH EXCAVATION PROTECTION
|
LF
|
107.000
|
$3.000
|
$142.000
|
$18.000
|
$12.350
|
|
|
TEMPORARY SPL SHORING (COFFERDAM)
|
SF
|
1,168.000
|
$45.000
|
$12.750
|
$120.000
|
$61.740
|
|
|
DRILL SHAFT (24 IN)
|
LF
|
24.000
|
$190.000
|
$195.000
|
$180.000
|
$185.230
|
|
|
DRILL SHAFT (36 IN)
|
LF
|
48.000
|
$200.000
|
$519.000
|
$480.000
|
$493.950
|
|
|
DRILL SHAFT (48 IN)
|
LF
|
21.000
|
$250.000
|
$649.000
|
$600.000
|
$617.440
|
|
|
DRILL SHAFT (RDWY ILL POLE) (30 IN)
|
LF
|
408.000
|
$250.000
|
$221.000
|
$205.000
|
$209.930
|
|
|
CL C CONC (MISC)
|
CY
|
20.000
|
$900.000
|
$651.000
|
$1,800.000
|
$1,234.870
|
|
|
RETAINING WALL (CONC BLOCK)
|
SF
|
880.000
|
$55.000
|
$157.000
|
$150.000
|
$61.740
|
|
|
RETAINING WALL (CAST - IN - PLACE)
|
SF
|
1,608.000
|
$80.000
|
$121.000
|
$98.500
|
$111.140
|
|
|
RIPRAP (CONC)(5 IN)
|
CY
|
129.500
|
$500.000
|
$814.000
|
$650.000
|
$442.450
|
|
|
RIPRAP (STONE PROTECTION)(12 IN)
|
CY
|
267.000
|
$145.000
|
$325.000
|
$300.000
|
$167.650
|
|
|
RAIL (HANDRAIL)(TY F)
|
LF
|
924.000
|
$150.000
|
$275.000
|
$200.000
|
$143.330
|
|
|
CONC BOX CULV (6 FT X 3 FT)
|
LF
|
360.000
|
$600.000
|
$1,018.000
|
$750.000
|
$1,299.940
|
|
|
SET (TY I)(S= 6 FT)(HW= 4 FT)(4:1) (C)
|
EA
|
6.000
|
$10,000.000
|
$16,652.000
|
$12,000.000
|
$24,697.460
|
|
|
ADJUSTING MANHOLES
|
EA
|
5.000
|
$6,000.000
|
$1,575.000
|
$1,800.000
|
$1,234.870
|
|
|
CLEAN EXIST CULVERTS
|
EA
|
1.000
|
$2,000.000
|
$5,241.000
|
$6,000.000
|
$6,174.370
|
|
|
REMOV STR (PIPE)
|
EA
|
4.000
|
$2,500.000
|
$9,981.000
|
$1,800.000
|
$664.890
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$965,000.000
|
$1,284,375.580
|
$1,350,000.000
|
$1,759,694.140
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
16.000
|
$5,000.000
|
$21,564.000
|
$21,500.000
|
$30,871.830
|
|
|
ROCK FILTER DAMS (INSTALL) (TY 4)
|
LF
|
275.000
|
$40.000
|
$64.000
|
$57.500
|
$54.580
|
|
|
ROCK FILTER DAMS (REMOVE)
|
LF
|
275.000
|
$9.000
|
$11.500
|
$18.000
|
$14.150
|
|
|
CONSTRUCTION EXITS (INSTALL) (TY 1)
|
SY
|
264.000
|
$45.000
|
$67.500
|
$42.000
|
$43.220
|
|
|
CONSTRUCTION EXITS (REMOVE)
|
SY
|
264.000
|
$25.000
|
$12.750
|
$18.000
|
$18.520
|
|
|
SANDBAGS FOR EROSION CONTROL (12")
|
LF
|
321.000
|
$10.000
|
$26.500
|
$24.000
|
$24.700
|
|
|
BIODEG EROSN CONT LOGS (INSTL) (18")
|
LF
|
5,235.000
|
$8.000
|
$9.500
|
$9.000
|
$9.260
|
|
|
BIODEG EROSN CONT LOGS (REMOVE)
|
LF
|
2,618.000
|
$4.000
|
$4.750
|
$1.800
|
$1.850
|
|
|
CONSTRUCTING DETOURS
|
SY
|
552.000
|
$90.000
|
$119.000
|
$105.000
|
$98.730
|
|
|
CONC CURB (SLOTTED)
|
LF
|
144.000
|
$40.000
|
$97.000
|
$66.000
|
$24.700
|
|
|
CONC CURB & GUTTER TY II (MOD)
|
LF
|
9,239.000
|
$35.000
|
$32.000
|
$37.500
|
$26.450
|
|
|
INTERSECTIONS (CONC)
|
SY
|
1,311.000
|
$110.000
|
$179.000
|
$125.000
|
$87.280
|
|
|
DRIVEWAYS (CONC)
|
SY
|
1,571.000
|
$110.000
|
$122.000
|
$115.000
|
$89.720
|
|
|
CONC SIDEWALKS (5")
|
SY
|
8,694.000
|
$70.000
|
$83.000
|
$79.500
|
$74.480
|
|
|
CURB RAMPS (TY 1)
|
SY
|
130.000
|
$150.000
|
$247.000
|
$300.000
|
$99.220
|
|
|
CURB RAMPS (TY 2)
|
SY
|
93.000
|
$150.000
|
$166.000
|
$300.000
|
$211.190
|
|
|
CURB RAMPS (TY 10)
|
SY
|
35.000
|
$150.000
|
$231.000
|
$330.000
|
$319.190
|
|
|
CONC MEDIAN
|
SY
|
504.000
|
$85.000
|
$136.000
|
$110.000
|
$72.530
|
|
|
PIPE UNDERDRAINS (TY 8) (6")
|
LF
|
795.000
|
$30.000
|
$44.000
|
$60.000
|
$43.220
|
|
|
IN RD IL (TY SA) 20T-8 (250W EQ) LED
|
EA
|
29.000
|
$4,000.000
|
$4,151.000
|
$3,800.000
|
$3,951.590
|
|
|
IN RD IL (TY SA) 30T-8 (250W EQ) LED
|
EA
|
22.000
|
$3,000.000
|
$4,346.000
|
$4,000.000
|
$4,136.820
|
|
|
CONDT (PVC) (SCH 80) (2")
|
LF
|
10,597.000
|
$10.000
|
$14.000
|
$13.000
|
$13.270
|
|
|
CONDT (PVC) (SCH 80) (4")
|
LF
|
1,088.000
|
$25.000
|
$29.000
|
$26.500
|
$27.480
|
|
|
ELEC CONDR (NO.8) INSULATED
|
LF
|
10,995.000
|
$1.700
|
$1.500
|
$1.400
|
$1.420
|
|
|
ELEC CONDR (NO.6) BARE
|
LF
|
21,205.000
|
$1.500
|
$1.500
|
$1.500
|
$1.540
|
|
|
GROUND BOX TY A (122311)W/APRON
|
EA
|
2.000
|
$1,000.000
|
$1,005.000
|
$930.000
|
$957.030
|
|
|
GROUND BOX TY C (162911)W/APRON
|
EA
|
9.000
|
$1,200.000
|
$1,168.000
|
$1,100.000
|
$1,111.390
|
|
|
ELC SRV TY A 240/480 060(NS)SS(E)OT(O)
|
EA
|
1.000
|
$6,000.000
|
$8,108.000
|
$7,500.000
|
$7,717.960
|
|
|
ELC SRV TY A 240/480 060(NS)SS(E)PS(U)
|
EA
|
1.000
|
$6,000.000
|
$8,108.000
|
$7,500.000
|
$7,717.960
|
|
|
ELC SRV TY T 120/240 000(NS)GS(N)EX(O)
|
EA
|
1.000
|
$5,000.000
|
$8,458.000
|
$7,500.000
|
$7,717.960
|
|
|
ALUMINUM SIGNS (TY A)
|
SF
|
68.000
|
$30.000
|
$45.500
|
$42.000
|
$43.220
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
|
EA
|
10.000
|
$600.000
|
$843.000
|
$780.000
|
$802.670
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
|
EA
|
3.000
|
$800.000
|
$973.000
|
$900.000
|
$926.150
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SB(P)
|
EA
|
5.000
|
$700.000
|
$1,038.000
|
$960.000
|
$987.900
|
|
|
REMOVE SM RD SN SUP&AM
|
EA
|
8.000
|
$200.000
|
$195.000
|
$180.000
|
$185.230
|
|
|
INSTL OM ASSM (OM-2Y)(WC)GND
|
EA
|
3.000
|
$70.000
|
$195.000
|
$120.000
|
$123.490
|
|
|
WK ZN PAV MRK REMOV (REFL) TY I-C
|
EA
|
3,424.000
|
$5.000
|
$6.500
|
$6.000
|
$6.170
|
|
|
WK ZN PAV MRK REMOV (REFL) TY II-A-A
|
EA
|
3,786.000
|
$5.000
|
$6.500
|
$6.000
|
$6.170
|
|
|
WK ZN PAV MRK REMOV (TRAF BTN) TY W
|
EA
|
9,056.000
|
$4.000
|
$4.000
|
$3.600
|
$3.700
|
|
|
WK ZN PAV MRK REMOV (TRAF BTN) TY Y
|
EA
|
8,546.000
|
$4.000
|
$4.000
|
$3.600
|
$3.700
|
|
|
WK ZN PAV MRK REMOV (W)24"(SLD)
|
LF
|
1,350.000
|
$2.000
|
$19.500
|
$18.000
|
$18.520
|
|
REFL PAV MRK TY I (W)8"(DOT)(100MIL)
|
LF
|
1,980.000
|
$1.000
|
$1.750
|
$1.550
|
$1.610
|
|
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
|
LF
|
3,220.000
|
$1.000
|
$1.750
|
$1.550
|
$1.610
|
|
REFL PAV MRK TY I (Y)12"(SLD)(100MIL)
|
LF
|
225.000
|
$4.000
|
$5.250
|
$4.800
|
$4.940
|
|
REFL PAV MRK TY I(Y)(MED NOSE)(100MIL)
|
EA
|
4.000
|
$300.000
|
$649.000
|
$600.000
|
$617.440
|
|
|
PAVEMENT SEALER 4"
|
LF
|
19,842.000
|
$0.200
|
$0.300
|
$0.300
|
$0.310
|
|
|
PAVEMENT SEALER 8"
|
LF
|
5,200.000
|
$0.500
|
$0.750
|
$0.600
|
$0.620
|
|
|
PAVEMENT SEALER 12"
|
LF
|
225.000
|
$1.500
|
$1.250
|
$1.200
|
$1.230
|
|
|
PAVEMENT SEALER (ARROW)
|
EA
|
22.000
|
$50.000
|
$32.500
|
$30.000
|
$30.870
|
|
|
PAVEMENT SEALER (WORD)
|
EA
|
11.000
|
$45.000
|
$45.500
|
$42.000
|
$43.220
|
|
|
PAVEMENT SEALER (MED NOSE)
|
EA
|
4.000
|
$140.000
|
$195.000
|
$180.000
|
$185.230
|
|
RE PM W/RET REQ TY I (W)4"(BRK)(100MIL)
|
LF
|
9,510.000
|
$1.000
|
$1.000
|
$0.960
|
$0.990
|
|
RE PM W/RET REQ TY I (Y)4"(BRK)(100MIL)
|
LF
|
2,300.000
|
$1.000
|
$1.000
|
$0.960
|
$0.990
|
|
RE PM W/RET REQ TY I (Y)4"(SLD)(100MIL)
|
LF
|
8,032.000
|
$1.000
|
$1.000
|
$0.960
|
$0.990
|
|
PREFAB PAV MRK TY B (W)(24")(SLD)
|
LF
|
1,223.000
|
$50.000
|
$52.000
|
$48.000
|
$49.390
|
|
PREFAB PAV MRK TY B (W)(ARROW)
|
EA
|
22.000
|
$990.000
|
$973.000
|
$900.000
|
$926.150
|
|
PREFAB PAV MRK TY B (W)(WORD)
|
EA
|
11.000
|
$600.000
|
$1,557.000
|
$1,400.000
|
$1,481.850
|
|
REFL PAV MRKR TY I-C
|
EA
|
256.000
|
$3.000
|
$5.250
|
$4.800
|
$4.940
|
|
REFL PAV MRKR TY II-A-A
|
EA
|
237.000
|
$3.000
|
$5.250
|
$4.800
|
$4.940
|
|
|
ELIM EXT PAV MRK & MRKS (4")
|
LF
|
1,420.000
|
$1.000
|
$2.000
|
$1.800
|
$1.850
|
|
|
ELIM EXT PAV MRK & MRKS (8")
|
LF
|
755.000
|
$2.000
|
$4.000
|
$3.600
|
$3.700
|
|
|
ELIM EXT PAV MRK & MRKS (ARROW)
|
EA
|
2.000
|
$100.000
|
$130.000
|
$120.000
|
$123.490
|
|
|
PAV SURF PREP FOR MRK (4")
|
LF
|
19,842.000
|
$0.140
|
$0.300
|
$0.300
|
$0.310
|
|
|
PAV SURF PREP FOR MRK (8")
|
LF
|
5,200.000
|
$0.280
|
$0.750
|
$0.600
|
$0.620
|
|
|
PAV SURF PREP FOR MRK (12")
|
LF
|
225.000
|
$0.450
|
$1.250
|
$1.200
|
$1.230
|
|
|
PAV SURF PREP FOR MRK (24")
|
LF
|
1,223.000
|
$1.000
|
$2.500
|
$2.400
|
$2.470
|
|
|
PAV SURF PREP FOR MRK (ARROW)
|
EA
|
22.000
|
$22.000
|
$32.500
|
$30.000
|
$30.870
|
|
|
PAV SURF PREP FOR MRK (WORD)
|
EA
|
11.000
|
$25.000
|
$45.500
|
$42.000
|
$43.220
|
|
|
PAV SURF PREP FOR MRK (MED NOSE)
|
EA
|
4.000
|
$50.000
|
$130.000
|
$120.000
|
$123.490
|
|
|
INSTALL HWY TRF SIG (ISOLATED)
|
EA
|
1.000
|
$25,000.000
|
$19,459.000
|
$18,000.000
|
$18,523.100
|
|
|
VEH SIG SEC (12")LED(GRN)
|
EA
|
10.000
|
$250.000
|
$292.000
|
$270.000
|
$277.850
|
|
|
VEH SIG SEC (12")LED(GRN ARW)
|
EA
|
4.000
|
$250.000
|
$292.000
|
$270.000
|
$277.850
|
|
|
VEH SIG SEC (12")LED(YEL)
|
EA
|
10.000
|
$250.000
|
$292.000
|
$270.000
|
$277.850
|
|
|
VEH SIG SEC (12")LED(YEL ARW)
|
EA
|
8.000
|
$250.000
|
$292.000
|
$270.000
|
$277.850
|
|
|
VEH SIG SEC (12")LED(RED)
|
EA
|
10.000
|
$250.000
|
$292.000
|
$270.000
|
$277.850
|
|
|
VEH SIG SEC (12")LED(RED ARW)
|
EA
|
4.000
|
$250.000
|
$292.000
|
$270.000
|
$277.280
|
|
|
PED SIG SEC (LED)(COUNTDOWN)
|
EA
|
9.000
|
$600.000
|
$973.000
|
$900.000
|
$926.150
|
|
|
BACKPLATE W/REF BRDR(3 SEC)(VENT)ALUM
|
EA
|
10.000
|
$120.000
|
$227.000
|
$210.000
|
$216.100
|
|
|
BACKPLATE W/REF BRDR(4 SEC)(VENT)ALUM
|
EA
|
4.000
|
$140.000
|
$259.000
|
$240.000
|
$246.970
|
|
|
TRF SIG CBL (TY A)(14 AWG)(5 CONDR)
|
LF
|
131.000
|
$2.000
|
$5.750
|
$5.400
|
$5.560
|
|
|
TRF SIG CBL (TY A)(14 AWG)(7 CONDR)
|
LF
|
645.000
|
$2.250
|
$6.500
|
$6.000
|
$6.170
|
|
|
TRF SIG CBL (TY A)(14 AWG)(20 CONDR)
|
LF
|
451.000
|
$5.000
|
$9.750
|
$9.000
|
$9.260
|
|
|
TRF SIG CBL (TY C)(14 AWG)(2 CONDR)
|
LF
|
962.000
|
$1.500
|
$4.000
|
$3.600
|
$3.700
|
|
|
INS TRF SIG PL AM(S)1 ARM(40')
|
EA
|
2.000
|
$10,000.000
|
$19,459.000
|
$18,000.000
|
$18,523.100
|
|
|
INS TRF SIG PL AM(S)1 ARM(44')
|
EA
|
1.000
|
$10,000.000
|
$20,108.000
|
$18,500.000
|
$19,140.530
|
|
|
INS TRF SIG PL AM(S)1 ARM(50')
|
EA
|
1.000
|
$22,500.000
|
$43,460.000
|
$40,000.000
|
$41,368.250
|
|
|
PED POLE ASSEMBLY
|
EA
|
4.000
|
$2,000.000
|
$2,141.000
|
$2,000.000
|
$2,037.540
|
|
|
FULL - WIDTH MOWING
|
CYC
|
2.000
|
$5,000.000
|
$519.000
|
$2,400.000
|
$6,470.730
|
|
|
LITTER REMOVAL
|
CYC
|
2.000
|
$4,000.000
|
$519.000
|
$1,800.000
|
$3,993.310
|
|
|
LOOSE AGGR FOR GROUNDCOVER (TYPE I)
|
CY
|
353.000
|
$160.000
|
$259.000
|
$905.000
|
$109.950
|
|
|
LOOSE AGGR FOR GROUNDCOVER (TYPE II)
|
CY
|
25.000
|
$100.000
|
$196.000
|
$405.000
|
$139.410
|
|
|
FILTER FABRIC (TY 2)
|
SY
|
2,760.000
|
$10.000
|
$4.000
|
$5.400
|
$9.880
|
|
|
D-GR HMA TY-D SAC-A PG70-22
|
TON
|
2,254.000
|
$120.000
|
$226.000
|
$255.000
|
$245.620
|
|
|
TACK COAT
|
GAL
|
129.000
|
$4.000
|
$7.000
|
$6.000
|
$24.700
|
|
|
INSTALL BRIDGE IDENTIFICATION NUMBERS
|
EA
|
1.000
|
$220.000
|
$910.000
|
$480.000
|
$18,523.100
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
DAY
|
960.000
|
$75.000
|
$55.500
|
$120.000
|
$37.050
|
|
|
TMA (STATIONARY)
|
DAY
|
512.000
|
$175.000
|
$153.000
|
$300.000
|
$172.880
|
|
|
TMA (MOBILE OPERATION)
|
DAY
|
30.000
|
$200.000
|
$1,531.000
|
$960.000
|
$216.100
|
|
|
TEMP SPEED MONITOR SYS
|
EA
|
1.000
|
$13,000.000
|
$23,171.000
|
$18,000.000
|
$24,429.500
|
|
|
WATER LINE LOWERING
|
LS
|
1.000
|
$35,000.000
|
$194,397.000
|
$160,000.000
|
$246,974.620
|
|
|
HYDRANT RELOCATION
|
EA
|
1.000
|
$6,000.000
|
$11,623.000
|
$9,000.000
|
$24,697.460
|
|
|
VALVE ADJUSTMENTS
|
EA
|
13.000
|
$800.000
|
$843.000
|
$780.000
|
$6,174.370
|
|
|
CATHODIC PROTECTION MH ADJ
|
LS
|
1.000
|
$8,000.000
|
$8,538.000
|
$1,800.000
|
$185,230.960
|
|
|
INST TEMP LINE STOP 16"
|
EA
|
2.000
|
$35,000.000
|
$5,443.000
|
$1,800.000
|
$111,530.030
|
|
Totals: |
$10,587,826.230
|
$12,797,068.280
|
$13,999,999.860
|
$17,891,696.835
|