LUBBOCK CR (0905-06-116)

Items: 183

County: LUBBOCK
Length: N/A
Highway: CR
District: LUBBOCK
Control Number: 0905-06-116
DBE Goal: N/A
Project: STP 2020(122)MM
Guaranty: N/A
Time: 726 WORKING DAYS
Engineer's Estimate: $33,442,897.05
Date: 06/27/2023 (2 years ago)
Contract Number: N/A
Type: WIDEN NON-FREEWAY
Mail/Deliver Bids To: N/A
MICHAEL WITTIE
Actions:
Notice HCS Excel Tabs Print Print Notice
Bidders (2)
E
Engineer's Estimate
$33,442,897.05
1
$37,998,646.40
Over/Under Est: 13.62% $4,555,749.35
$42,541,762.06
Over/Under Est: 27.21% $9,098,865.01
Amt Left: 11.96% $4,543,115.66
Subcontractor Percentage Amount
LONE STAR DIRT & PAVING, LTD. 11.28% $4,253,137.63
USA WESTERN LOGISTICS 7.55% $2,846,736.62
TEXAS ENVIRONMENTAL MANAGEMENT - SAN ANTONIO, INC. 1.67% $629,675.52
KING GEORGE TRAFFIC SOLUTIONS LLC 1.36% $512,789.64
TRP INFRASTRUCTURE SERVICES, LLC 1.35% $509,019.13
ARTEX ELECTRIC, INC. 1.11% $418,526.84
A BROTHERS MILLING, LLC 0.24% $90,492.29
TORO BRAVO CONSTRUCTION, LLC 0.21% $79,180.75
FC TRAFFIC CONTROL, INC. 0.19% $71,639.73
DK CONTRACTING, LLC 0.16% $60,328.19
LMSE TRUCKING, LLC 0.13% $49,016.66
ACT SAW CUTTING & REMOVAL 0.09% $33,934.61
ARTEX ELECTRIC CO. 0.00% $0.00
Total: 25.34% $9,554,477.61

Bid Items & Bid Tabulations

183 Total 0 of 183
LUBBOCK  |  CR  |  LUBBOCK  |  0905-06-116  |  06/27/2023  |  $33,442,897.05  |  STP 2020(122)MM  |  WIDEN NON-FREEWAY  |  726 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
WEBBER, LLC
GILVIN-TERRILL, LTD.
PREPARING ROW
STA 187.000 $3,000.000 $20,500.000 $1,000.000
PREP ROW (TREE)(LESS THAN 24" DIA)
EA 39.000 $1,000.000 $1,500.000 $1,500.000
PREP ROW (TREE)(GREATER THAN 24" DIA)
EA 6.000 $2,000.000 $3,000.000 $2,000.000
REMOVING CONC (RIPRAP)
SY 1,071.000 $36.000 $50.000 $15.000
REMOVING CONC (DRIVEWAYS)
SY 3,636.000 $30.000 $50.000 $15.000
OBLITERATING ABANDONED ROAD
SY 982.000 $35.000 $100.000 $15.000
EXCAVATION (ROADWAY)
CY 70,984.000 $12.000 $24.000 $15.000
EXCAVATION (CHANNEL)
CY 24,311.000 $15.000 $24.000 $20.000
EXCAVATION (SPECIAL)
CY 135,962.000 $18.000 $24.000 $20.000
EMBANKMENT (FINAL)(DENS CONT)(TY C)
CY 62,786.000 $15.000 $11.000 $15.000
FURNISHING AND PLACING TOPSOIL (4")
SY 144,622.000 $1.000 $1.000 $3.000
CELL FBR MLCH SEED(PERM)(RURAL)(SANDY)
SY 144,622.000 $0.500 $0.750 $1.000
DRILL SEEDING (PERM) (RURAL) (SANDY)
AC 17.400 $950.000 $1,020.000 $1,200.000
DRILL SEED (TEMP)(WARM OR COOL)
SY 144,622.000 $0.500 $0.200 $0.500
VEGETATIVE WATERING
MG 2,434.900 $50.000 $120.000 $10.000
SOIL RETENTION BLANKETS (CL 1) (TY B)
SY 7,202.000 $4.000 $1.750 $2.000
PROOF ROLLING
HR 85.000 $150.000 $153.000 $250.000
FL BS (CMP IN PLC)(TY A GR 4) (8")
SY 110,761.000 $15.000 $15.000 $25.000
CEMENT
TON 154.000 $280.000 $300.000 $350.000
CEMENT TREAT (EXIST MATL) (6")
SY 18,118.000 $10.000 $7.000 $4.000
PRIME COAT (MC-30)
GAL 19,914.000 $7.000 $8.500 $7.000
FOG SEAL (CSS-1H)
GAL 14,935.000 $8.000 $5.000 $8.000
ASPH (AC-20-5TR)
GAL 956.000 $6.000 $10.100 $12.000
AGGR(TY-PB GR-4 SAC-B)
CY 133.000 $10.000 $364.000 $125.000
FLEXIBLE PAVEMENT STRUCTURE REPAIR(4")
SY 1,300.000 $75.000 $70.000 $100.000
PLAN & TEXT ASPH CONC PAV(2" TO 4")
SY 54,986.000 $4.500 $1.150 $4.000
CONC PVMT (CONT REINF - CRCP) (8")
SY 15,821.000 $116.000 $101.000 $150.010
CONC PVMT(CRCP)(TRANSITION SLAB)
SY 945.000 $150.000 $140.000 $150.000
CEM STABIL BKFL
CY 1,761.000 $200.000 $119.000 $275.000
TRENCH EXCAVATION PROTECTION
LF 3,873.000 $10.000 $1.000 $25.000
TEMPORARY SPL SHORING (COFFERDAM)
SF 2,800.000 $15.000 $2.120 $40.000
DRILL SHAFT (RDWY ILL POLE) (30 IN)
LF 60.000 $250.000 $186.000 $200.000
DRILL SHAFT (TRF SIG POLE) (36 IN)
LF 90.000 $450.000 $410.000 $450.000
RIPRAP (CONC)(4 IN)
CY 2,083.100 $500.000 $825.000 $1,800.000
RIPRAP (CONC)(5 IN)
CY 73.000 $900.000 $853.000 $850.000
RIPRAP (STONE TY F)(DRY)(18")
CY 29.000 $350.000 $150.000 $300.800
CONC BOX CULV (5 FT X 2 FT)
LF 696.000 $500.000 $350.000 $445.000
CONC BOX CULV (5 FT X 3 FT)
LF 128.000 $520.000 $425.000 $475.000
CONC BOX CULV (6 FT X 3 FT)
LF 416.000 $650.000 $550.000 $555.000
CONC BOX CULV (6 FT X 4 FT)
LF 540.000 $675.000 $575.000 $575.000
CONC BOX CULV (7 FT X 4 FT)
LF 836.000 $825.000 $650.000 $730.000
CONC BOX CULV (8 FT X 3 FT)
LF 52.000 $1,000.000 $750.000 $740.000
CONC BOX CULV (6 FT X 2 FT)
LF 952.000 $625.000 $500.000 $525.000
RC PIPE (CL IV)(18 IN)
LF 827.000 $100.000 $125.000 $95.000
RC PIPE (CL IV)(24 IN)
LF 90.000 $180.000 $150.000 $140.000
RC PIPE (CL IV)(30 IN)
LF 68.000 $250.000 $185.000 $170.000
RC PIPE (CL IV)(42 IN)
LF 2,572.000 $260.000 $275.000 $335.000
JCTBOX(COMPL)(PJB)(5FTX5FT)
EA 3.000 $8,750.000 $12,500.000 $12,245.000
JCTBOX(COMPL)(PJB)(6FTX6FT)
EA 3.000 $12,000.000 $15,000.000 $9,600.000
INLET(COMPL)(PAZD)(FG)(3FTX3FT-3FTX3FT)
EA 2.000 $6,000.000 $6,500.000 $5,335.000
INLET(COMPL)(PAZD)(FG)(4FTX4FT-4FTX4FT)
EA 2.000 $9,000.000 $7,500.000 $7,335.000
INLET(COMPL)(PAZD)(FG)(5FTX5FT-4FTX4FT)
EA 2.000 $9,500.000 $9,500.000 $8,830.000
WINGWALL (FW - S) (HW=4 FT)
EA 2.000 $9,500.000 $35,000.000 $50,000.000
WINGWALL (FW - S) (HW=5 FT)
EA 3.000 $17,000.000 $50,000.000 $45,000.000
SET (TY I)(S= 6 FT)(HW= 3 FT)(6:1) (P)
EA 16.000 $15,000.000 $13,500.000 $15,000.000
SET (TY I)(S= 6 FT)(HW= 4 FT)(6:1) (P)
EA 4.000 $22,000.000 $17,000.000 $20,000.000
SET (TY I)(S= 6 FT)(HW= 5 FT)(6:1) (P)
EA 8.000 $23,500.000 $25,500.000 $25,000.000
SET (TY I)(S= 7 FT)(HW= 5 FT)(6:1) (C)
EA 2.000 $25,000.000 $40,000.000 $25,000.000
SET (TY I)(S= 8 FT)(HW= 4 FT)(6:1) (P)
EA 2.000 $26,500.000 $35,000.000 $22,500.000
SET (TY II) (18 IN) (RCP) (6: 1) (P)
EA 26.000 $1,000.000 $3,500.000 $2,500.000
SET (TY II) (24 IN) (RCP) (6: 1) (P)
EA 4.000 $3,000.000 $4,500.000 $3,000.000
SET (TY II) (30 IN) (RCP) (4: 1) (C)
EA 2.000 $3,000.000 $4,000.000 $4,000.000
ADJUSTING MANHOLES
EA 6.000 $3,000.000 $5,000.000 $5,000.000
CLEAN EXIST CULVERTS
EA 44.000 $1,500.000 $2,500.000 $1,505.550
REMOV STR (BOX CULVERT)
EA 6.000 $12,500.000 $15,000.000 $5,000.000
REMOV STR (PIPE)
EA 8.000 $750.000 $10,000.000 $1,000.000
MOBILIZATION
LS 1.000 $3,193,000.000 $3,800,000.000 $4,100,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 35.000 $15,000.000 $32,550.000 $125,000.000
ROCK FILTER DAMS (REMOVE)
LF 286.000 $80.000 $50.000 $50.000
CONSTRUCTION EXITS (INSTALL) (TY 1)
SY 500.000 $40.000 $53.000 $55.000
CONSTRUCTION EXITS (REMOVE)
SY 500.000 $20.000 $13.600 $20.000
TEMP SEDMT CONT FENCE (INSTALL)
LF 4,548.000 $5.250 $4.750 $6.000
TEMP SEDMT CONT FENCE (REMOVE)
LF 1,516.000 $1.750 $1.600 $2.000
BIODEG EROSN CONT LOGS (INSTL) (18")
LF 3,510.000 $12.500 $8.700 $10.000
BIODEG EROSN CONT LOGS (REMOVE)
LF 1,170.000 $10.000 $1.600 $2.000
ROCK FILTER DAMS (INSTALL) (TY 2) (6:1)
LF 286.000 $100.000 $236.000 $250.000
CONSTRUCTING DETOURS
SY 35,111.000 $80.000 $46.500 $15.000
PORT CTB (FUR & INST)(LOW PROF)(TY 1)
LF 2,860.000 $50.000 $35.000 $125.000
PORT CTB (FUR & INST)(LOW PROF)(TY 2)
LF 120.000 $60.000 $35.000 $125.000
PORT CTB (MOVE)(LOW PROF)(TY 1)
LF 2,680.000 $9.500 $10.000 $10.000
PORT CTB (MOVE)(LOW PROF)(TY 2)
LF 240.000 $15.000 $10.000 $10.000
PORT CTB (STKPL)(LOW PROF)(TY 1)
LF 720.000 $20.000 $15.000 $10.000
PORT CTB (REMOVE)(LOW PROF)(TY 1)
LF 2,860.000 $16.500 $17.000 $10.000
PORT CTB (REMOVE)(LOW PROF)(TY 2)
LF 120.000 $20.000 $17.000 $10.000
CONC CURB & GUTTER (TY I)
LF 688.000 $55.000 $22.900 $45.000
CONC CURB & GUTTER (TY II)
LF 24,025.000 $35.000 $28.900 $35.000
CONC CURB & GUTTER (SLOTTED)
LF 595.000 $70.000 $42.750 $50.000
CONC CURB & GUTTER (VALLEY GUTTER)
LF 441.000 $100.000 $62.750 $135.000
INTERSECTIONS (CONC)
SY 1,186.000 $145.000 $59.750 $130.000
DRIVEWAYS (CONC)
SY 8,389.000 $130.000 $69.750 $110.000
DRIVEWAYS (ACP)
SY 319.000 $100.000 $59.750 $100.000
TURNOUTS (CONC)
SY 699.000 $130.000 $63.750 $130.000
CONC SIDEWALKS (4")
SY 10,803.000 $60.000 $59.750 $65.000
CURB RAMPS (TY 1)
SY 323.000 $150.000 $99.750 $150.000
CURB RAMPS (TY 5)
SY 26.000 $150.000 $116.000 $180.000
CURB RAMPS (TY 10)
SY 160.000 $150.000 $146.000 $150.000
CONC MEDIAN
SY 1,227.000 $200.000 $59.750 $125.000
MAILBOX INSTALL-S (TWG-POST) TY 4
EA 2.000 $1,500.000 $305.000 $300.000
MAILBOX INSTALL-D (TWG-POST) TY 4
EA 4.000 $325.000 $347.000 $350.000
MAILBOX INSTALL-M (TWG-POST) TY 4
EA 22.000 $700.000 $589.000 $550.000
IN RD IL (TY SA) 50T-12 (400W EQ) LED
EA 6.000 $6,500.000 $4,490.000 $4,500.000
CONDT (PVC) (SCH 80) (2")
LF 315.000 $20.000 $11.200 $15.000
CONDT (PVC) (SCH 80) (3")
LF 285.000 $30.000 $14.900 $15.000
CONDT (PVC) (SCH 80) (4")
LF 70.000 $35.000 $19.200 $20.000
CONDT (PVC) (SCH 80) (4") (BORE)
LF 1,470.000 $50.000 $38.250 $40.000
ELEC CONDR (NO.12) INSULATED
LF 720.000 $2.000 $1.050 $1.000
ELEC CONDR (NO.8) INSULATED
LF 1,570.000 $2.500 $1.600 $1.500
ELEC CONDR (NO.6) BARE
LF 1,945.000 $2.500 $1.600 $1.500
ELEC CONDR (NO.6) INSULATED
LF 1,720.000 $3.000 $1.850 $2.000
GROUND BOX TY C (162911)W/APRON
EA 8.000 $1,500.000 $984.000 $1,000.000
GROUND BOX TY D (162922)W/APRON
EA 9.000 $1,425.000 $1,010.000 $1,000.000
REMOVE GROUND BOX
EA 3.000 $575.000 $372.000 $350.000
ELC SRV TY D 120/240 100(NS)SS(E)SP(U)
EA 4.000 $6,160.000 $6,650.000 $6,250.000
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
EA 33.000 $650.000 $903.000 $850.000
IN SM RD SN SUP&AM TY10BWG(1)SA(P-BM)
EA 8.000 $1,100.000 $1,080.000 $1,000.000
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
EA 5.000 $1,100.000 $1,090.000 $1,000.000
REMOVE SM RD SN SUP&AM
EA 49.000 $135.000 $100.000 $200.000
WK ZN PAV MRK NON-REMOV (W)4"(SLD)
LF 1,446.000 $0.300 $0.650 $0.900
WK ZN PAV MRK NON-REMOV (Y)4"(SLD)
LF 7,280.000 $0.300 $0.650 $0.900
WK ZN PAV MRK REMOV (REFL) TY I-C
EA 12,596.000 $4.250 $2.950 $4.000
WK ZN PAV MRK REMOV (REFL) TY II-A-A
EA 17,618.000 $4.500 $2.950 $4.000
WK ZN PAV MRK REMOV (TRAF BTN) TY W
EA 37,788.000 $5.500 $2.750 $3.000
WK ZN PAV MRK REMOV (TRAF BTN) TY Y
EA 52,854.000 $5.000 $2.750 $3.000
WK ZN PAV MRK REMOV (W)24"(SLD)
LF 998.000 $15.000 $10.000 $20.000
WK ZN PAV MRK SHT TERM (TAB)TY W
EA 1,649.000 $1.000 $2.250 $1.500
WK ZN PAV MRK SHT TERM (TAB)TY Y
EA 417.000 $1.000 $1.900 $1.500
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
LF 7,364.000 $1.250 $1.200 $1.250
REFL PAV MRK TY I (Y)8"(SLD)(100MIL)
LF 2,080.000 $1.650 $1.200 $1.250
RE PM W/RET REQ TY I (W)4"(BRK)(100MIL)
LF 6,800.000 $0.750 $0.950 $0.760
RE PM W/RET REQ TY I (W)4"(SLD)(100MIL)
LF 6,890.000 $0.900 $0.950 $0.760
RE PM W/RET REQ TY I (Y)4"(BRK)(100MIL)
LF 5,080.000 $0.750 $0.950 $0.760
RE PM W/RET REQ TY I (Y)4"(SLD)(100MIL)
LF 23,810.000 $0.900 $0.950 $0.760
PREFAB PAV MRK TY B (W)(12")(SLD)
LF 73.000 $25.000 $21.500 $20.000
PREFAB PAV MRK TY B (W)(24")(SLD)
LF 1,683.000 $35.000 $31.500 $40.000
PREFAB PAV MRK TY B (W)(ARROW)
EA 35.000 $300.000 $825.000 $650.000
PREFAB PAV MRK TY B (Y)(12")(SLD)
LF 49.000 $25.000 $21.500 $20.000
PREFAB PAV MRK TY C (W) (12") (SLD)
LF 1,057.000 $25.000 $6.750 $10.000
PREFAB PAV MRK TY C (Y) (12") (SLD)
LF 291.000 $25.000 $6.750 $12.000
REFL PAV MRKR TY I-C
EA 676.000 $5.000 $4.000 $5.000
REFL PAV MRKR TY II-A-A
EA 1,016.000 $6.500 $4.000 $5.000
PAV SURF PREP FOR MRK (4")
LF 4,471.000 $1.250 $0.150 $0.750
PAV SURF PREP FOR MRK (8")
LF 2,106.000 $1.500 $0.350 $1.500
PAV SURF PREP FOR MRK (12")
LF 860.000 $1.750 $0.450 $2.000
PAV SURF PREP FOR MRK (24")
LF 316.000 $2.500 $0.650 $4.000
PAV SURF PREP FOR MRK (ARROW)
EA 26.000 $60.000 $37.000 $100.000
INSTALL HWY TRF SIG (SYSTEM)
EA 1.000 $35,000.000 $12,760.000 $12,000.000
REMOVING TRAFFIC SIGNALS
EA 1.000 $6,250.000 $7,980.000 $7,500.000
INSTALL HWY TRF SIG (UPGRADE)
EA 1.000 $15,000.000 $8,510.000 $8,000.000
VEH SIG SEC (12")LED(GRN)
EA 17.000 $295.000 $293.000 $275.000
VEH SIG SEC (12")LED(GRN ARW)
EA 9.000 $300.000 $293.000 $275.000
VEH SIG SEC (12")LED(YEL)
EA 17.000 $295.000 $293.000 $275.000
VEH SIG SEC (12")LED(YEL ARW)
EA 14.000 $300.000 $293.000 $275.000
VEH SIG SEC (12")LED(RED)
EA 17.000 $295.000 $293.000 $275.000
VEH SIG SEC (12")LED(RED ARW)
EA 6.000 $305.000 $293.000 $275.000
PED SIG SEC (LED)(COUNTDOWN)
EA 9.000 $750.000 $798.000 $750.000
BACKPLATE W/REFL BRDR(3 SEC)ALUM
EA 14.000 $175.000 $160.000 $150.000
BACKPLATE W/REFL BRDR(4 SEC)ALUM
EA 7.000 $160.000 $186.000 $175.000
BACKPLATE W/REFL BRDR(5 SEC)ALUM
EA 2.000 $250.000 $239.000 $225.000
TRF SIG CBL (TY A)(14 AWG)(5 CONDR)
LF 655.000 $2.000 $4.800 $4.500
TRF SIG CBL (TY A)(14 AWG)(7 CONDR)
LF 440.000 $4.000 $5.300 $5.000
TRF SIG CBL (TY A)(14 AWG)(10 CONDR)
LF 945.000 $7.000 $6.400 $6.000
TRF SIG CBL (TY A)(14 AWG)(20 CONDR)
LF 1,000.000 $9.000 $10.600 $10.000
TRF SIG CBL (TY C)(12 AWG)(2 CONDR)
LF 1,630.000 $2.750 $2.150 $2.000
INS TRF SIG PL AM(S)1 ARM(36')LUM
EA 1.000 $15,000.000 $15,800.000 $14,850.000
INS TRF SIG PL AM(S)1 ARM(40')LUM
EA 2.000 $16,000.000 $17,550.000 $16,500.000
INS TRF SIG PL AM(S)1 ARM(44')LUM
EA 3.000 $17,800.000 $18,080.000 $17,000.000
PED POLE ASSEMBLY
EA 6.000 $3,500.000 $1,700.000 $1,600.000
PED DETECT PUSH BUTTON (APS)
EA 9.000 $1,500.000 $798.000 $750.000
PED DETECTOR CONTROLLER UNIT
EA 1.000 $6,500.000 $4,250.000 $4,000.000
FULL - WIDTH MOWING
CYC 7.000 $6,500.000 $4,050.000 $2,250.000
LITTER REMOVAL
CYC 7.000 $5,000.000 $2,210.000 $845.000
STORM SEWER CLEANING (ALL SIZES)
LF 3,542.000 $20.000 $16.000 $40.000
D-GR HMA TY-B PG76-28
TON 22,908.000 $130.000 $175.000 $180.000
D-GR HMA TY-D SAC-A PG76-28
TON 910.000 $220.000 $200.000 $220.000
STONE-MTRX-ASPH SMA-D SAC-A PG76-28
TON 11,758.000 $160.000 $165.000 $225.000
TACK COAT
GAL 13,940.000 $3.750 $6.500 $6.000
PORTABLE CHANGEABLE MESSAGE SIGN
DAY 2,100.000 $175.000 $46.750 $45.000
RADAR COMMUNICATION CABLE
LF 1,470.000 $2.750 $2.150 $2.000
TMA (STATIONARY)
DAY 363.000 $200.000 $217.000 $950.000
TMA (MOBILE OPERATION)
DAY 30.000 $275.000 $505.000 $950.000
RVDS(PRESENCE DET ONLY)(INSTALL ONLY)
EA 7.000 $1,500.000 $479.000 $450.000
TEMP SPEED MONITOR SYS
EA 1.000 $16,500.000 $16,420.000 $12,000.000
4G CELLULAR ROUTER (INSTALL ONLY)
EA 1.000 $2,500.000 $319.000 $300.000
Totals: $33,442,897.050 $37,998,646.400 $42,541,762.060