LUBBOCK VARIOUS (0905-00-142)

Items: 63

County: LUBBOCK
Length: 0.0000 MILES
Highway: VARIOUS
District: LUBBOCK
Control Number: 0905-00-142
DBE Goal: 7.0%
Project: F 2025(866)
Guaranty: $70,000.00
Time: 316 WORKING DAYS
Engineer's Estimate: $3,454,533.29
Date: 07/02/2025 (11 months ago)
Contract Number: 7253224
Type: CONSTRUCT RAMPS
Project ID: A00195963
Contract Type: Federal
Project Description: FY 2025 ADA RAMPS
Mail/Deliver Bids To:
TEXAS DEPARTMENT OF TRANSPORTATION
ATTN: CONSTRUCTION DIVISION - RM M1C3.02
6230 E STASSNEY LN, AUSTIN, TX 78744
HEATH BOZEMAN
Actions:
Notice Questions HCS Excel Tabs Print Print Notice
Bidders (3)
E
Engineer's Estimate
$3,454,533.29
1
Awarded
$2,978,480.50
Over/Under Est: -13.78% -$476,052.79
$3,063,718.43
Over/Under Est: -11.31% -$390,814.86
Amt Left: 2.86% $85,237.93
$4,276,263.00
Over/Under Est: 23.79% $821,729.71
Amt Left: 43.57% $1,297,782.50
Delta: -39.58% -$1,212,544.57
Subcontractor Percentage Amount
ONE WAY CONCRETE CONSTRUCTION, LLC 44.57% $1,550,358.76
FC TRAFFIC CONTROL, INC. 0.58% $20,175.19
Total: 45.15% $1,570,533.95

Bid Items & Bid Tabulations

63 Total 0 of 63
LUBBOCK  |  VARIOUS  |  LUBBOCK  |  0905-00-142  |  07/02/2025  |  $3,454,533.29  |  F 2025(866)  |  CONSTRUCT RAMPS  |  316 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
STX CIVIL
TI-ZACK CONCRETE, LLC
GILVIN-TERRILL, LTD.
PREPARING ROW
STA 2.000 $2,100.000 $2,900.000 $1,100.000 $5,000.000
REMOV CONC (PAV)
SY 74.000 $16.520 $45.000 $32.350 $60.000
REMOV CONC (DRIVEWAYS)
SY 3,724.000 $27.150 $10.000 $32.140 $60.000
REMOV CONC (SIDEWALK, RAMP OR SUP)
SY 240.000 $39.670 $20.000 $33.250 $60.000
REMOV CONC (CURB & GUTTER)
LF 46.000 $27.560 $1.000 $34.700 $60.000
RMV (6"-10") TRT/UNTRT BASE & ASPH PAV
SY 1,245.000 $20.000 $10.000 $32.050 $60.000
BACKFILL (TY A)(VEH)
CY 250.000 $32.000 $50.000 $31.920 $100.000
BLOCK SODDING
SY 5,200.000 $11.320 $6.500 $6.600 $20.000
FERTILIZER
AC 1.200 $1,082.670 $2,200.000 $27.500 $3,000.000
VEGETATIVE WATERING
TGL 128.500 $163.270 $10.000 $27.500 $60.000
RDSIDE AMENITY (ADA PARKING SIGN)
EA 2.000 $250.000 $500.000 $495.000 $900.000
D-GR HMA TY-B PG70-28
TON 25.000 $227.500 $350.000 $330.000 $700.000
STRUCT EXCAV
CY 59.000 $35.000 $50.000 $88.000 $100.000
CUT & RESTORE CONC PAVING
SY 494.000 $285.000 $160.000 $119.470 $250.000
CUT & RESTORE ASPH PAVING
SY 359.000 $177.810 $230.000 $99.000 $250.000
RIPRAP (CONC)(5 IN)
CY 143.000 $487.500 $600.000 $818.240 $1,000.000
RAIL (HANDRAIL)(TY A)
LF 24.000 $101.140 $220.000 $220.000 $175.000
RAIL (HANDRAIL)(TY E)
LF 202.000 $144.000 $200.000 $220.000 $175.000
CMP (GAL STL 36 IN)
LF 42.000 $300.000 $550.000 $267.630 $150.000
CONC BOX CULV (5 FT X 4 FT)(EXTEND)
LF 10.000 $1,175.000 $800.000 $3,824.320 $3,000.000
INLET (COMPL)(PCO)(5FT)(NONE)
EA 1.000 $10,000.000 $8,500.000 $16,782.700 $10,000.000
WINGWALL (PW - 1) (HW=7 FT)
EA 1.000 $23,500.000 $28,000.000 $63,496.400 $37,000.000
SET (TY II) (36 IN) (CMP) (6: 1) (P)
EA 1.000 $9,850.000 $5,500.000 $13,226.400 $10,000.000
ADJUSTING MANHOLES
EA 2.000 $2,675.840 $1,500.000 $798.000 $1,500.000
ADJUSTING MANHOLES & INLETS
EA 6.000 $1,083.000 $4,500.000 $1,330.000 $1,500.000
ADJUSTING MANHOLES (WATER VALVE BOX)
EA 3.000 $1,536.300 $500.000 $1,330.000 $1,500.000
ADJUSTING MANHOLES (WATER METER)
EA 5.000 $997.010 $500.000 $798.000 $1,500.000
CLEAN EXIST CULVERTS
EA 2.000 $4,000.000 $2,800.000 $2,750.000 $2,500.000
REMOV STR (INLET)
EA 1.000 $1,500.000 $2,000.000 $893.200 $2,000.000
REMOV STR (SET)
EA 1.000 $950.000 $500.000 $9,221.300 $2,000.000
REMOV STR (WINGWALL)
EA 1.000 $2,500.000 $2,400.000 $30,439.200 $2,000.000
REMOVE STR (RAIL)
LF 13.000 $17.500 $1.000 $275.000 $200.000
MOBILIZATION
LS 1.000 $314,000.000 $252,500.000 $220,197.940 $425,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 15.000 $7,500.000 $2,800.000 $3,850.000 $17,500.000
PORTABLE CHANGEABLE MESSAGE SIGN
DAY 632.000 $100.000 $70.000 $0.010 $60.000
TMA (STATIONARY)
DAY 632.000 $200.000 $260.000 $0.010 $350.000
CONSTRUCTION EXITS (INSTALL) (TY 1)
SY 444.000 $39.100 $40.000 $0.010 $50.000
CONSTRUCTION EXITS (REMOVE)
SY 222.000 $14.410 $10.000 $0.010 $20.000
SANDBAGS FOR EROSION CONTROL
EA 40.000 $14.000 $5.000 $0.010 $20.000
TEMP SEDMT CONT FENCE (INSTALL)
LF 3,675.000 $5.260 $4.000 $0.010 $4.500
TEMP SEDMT CONT FENCE (REMOVE)
LF 1,838.000 $1.600 $2.000 $0.010 $1.000
BIODEG EROSN CONT LOGS (INSTL) (18")
LF 60.000 $12.500 $8.000 $0.010 $10.000
BIODEG EROSN CONT LOGS (REMOVE)
LF 60.000 $3.070 $1.000 $0.010 $4.000
CONC CURB (TY II)
LF 409.000 $43.860 $10.000 $50.880 $50.000
CONC CURB (MONO) (TY II)
LF 52.000 $40.860 $8.000 $50.880 $70.000
CONC CURB & GUTTER (TY II)
LF 742.000 $71.258 $55.000 $50.880 $50.000
DRIVEWAYS (CONC)
SY 6,801.000 $145.000 $107.000 $119.470 $135.000
CONC SIDEWALKS (5")
SY 8,734.000 $95.000 $105.000 $117.900 $125.000
CONC SIDEWALK (STEPS)
SY 1.000 $250.000 $1,000.000 $166.990 $450.000
CURB RAMPS (TY 1)
EA 5.000 $2,870.250 $2,000.000 $2,408.670 $1,700.000
CURB RAMPS (TY 6)
EA 1.000 $3,533.370 $2,000.000 $2,408.670 $2,000.000
CURB RAMPS (TY 7)
EA 15.000 $2,954.190 $2,000.000 $2,408.670 $2,000.000
CURB RAMPS (TY 10)
EA 14.000 $3,567.120 $2,000.000 $2,408.670 $2,000.000
CONC SIDEWALKS (SPECIAL)
SY 121.000 $225.000 $350.000 $171.440 $200.000
RIGHT OF WAY MARKERS
EA 12.000 $2,560.000 $1,000.000 $165.000 $600.000
MAILBOX INSTALL-S (TWW-POST) TY 4
EA 19.000 $319.400 $350.000 $605.000 $425.000
RELOCATE EXISTING MAILBOX
EA 19.000 $225.000 $350.000 $605.000 $450.000
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
EA 68.000 $861.450 $800.000 $495.000 $800.000
REMOVE SM RD SN SUP&AM
EA 66.000 $178.820 $50.000 $27.500 $100.000
RE PM TY II (W) 6" (SLD)
LF 148.000 $1.000 $17.500 $19.250 $17.500
PREFAB PM TY C (W)(12")(SLD)
LF 91.000 $17.080 $22.500 $24.750 $22.500
PREFAB PM TY C (W)(24")(SLD)
LF 180.000 $23.730 $27.500 $30.250 $27.500
RETROFIT DET WARN SURF (SURF APPLIED)
SF 24.000 $20.000 $125.000 $21.000 $100.000
Totals: $3,454,533.285 $2,978,480.500 $3,063,718.430 $4,276,263.000
INCLUDES FORCE ACCOUNT WORK AMOUNTS AS FOLLOWS:
Description Amount
EROSION CONTROL MAINTENANCE: CONTRACTOR FORCE ACCOUNT WORK (PART) $20,000.00
SAFETY CONTINGENCY: CONTRACTOR FORCE ACCOUNT WORK (PART) $2,000.00
RAILROAD FORCE ACCOUNT WORK (PART) $5,000.00
Total: $27,000.00