Show Job Controls
Bid Cobra

LUBBOCK VA (0905-00-110)

Items: 52

County: LUBBOCK
Length: N/A
Highway: VA
District: LUBBOCK
Control Number: 0905-00-110
DBE Goal: N/A
Project: C 905-00-110
Guaranty: N/A
Time: 408 WORKING DAYS
Engineer's Estimate: $4,588,697.00
Date: 06/04/2021 (5 years ago)
Contract Number: N/A
Type: CONSTRUCT RAMPS
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice HCS Excel Tabs Print Print Notice
Documents:
Bidders (4)
E
Engineer's Estimate
$4,588,697.00
$4,034,018.84
Over/Under Est: -12.09% -$554,678.16
Over/Under Est: 5.42% $248,744.05
Amt Left: 19.92% $803,422.21
$4,863,138.00
Over/Under Est: 5.98% $274,441.00
Amt Left: 20.55% $829,119.16
Delta: -0.53% -$25,696.95
$5,655,489.10
Over/Under Est: 23.25% $1,066,792.10
Amt Left: 40.19% $1,621,470.26
Delta: -16.29% -$792,351.10

Bid Items & Bid Tabulations

52 Total 0 of 52
LUBBOCK  |  VA  |  LUBBOCK  |  0905-00-110  |  06/04/2021  |  $4,588,697.00  |  C 905-00-110  |  CONSTRUCT RAMPS  |  408 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
TI-ZACK CONCRETE, INC.
O. TREVINO CONSTRUCTION, LLC
FNH CONSTRUCTION, LLC
ENCINO LANDSCAPE, INC.
REMOVING CONC (DRIVEWAYS)
SY 6,520.000 $15.000 $15.000 $20.000 $20.000 $20.000
REMOVING CONC (CURB OR CURB & GUTTER)
LF 1,405.000 $8.000 $15.000 $20.000 $20.000 $20.000
REMOVING CONC (SIDEWALK OR RAMP)
SY 1,936.000 $26.000 $15.000 $20.000 $20.000 $20.000
REMOVING STAB BASE & ASPH PAV (0-6")
SY 640.000 $10.000 $15.000 $20.000 $20.000 $20.000
FURNISHING AND PLACING TOPSOIL (4")
SY 17,844.000 $1.000 $3.000 $2.500 $8.000 $1.000
BLOCK SODDING
SY 17,844.000 $5.000 $4.000 $6.700 $6.000 $3.000
DRILL SEED (TEMP)(WARM OR COOL)
SY 17,844.000 $0.500 $1.000 $0.200 $1.000 $0.150
VEGETATIVE WATERING
MG 521.000 $60.000 $1.000 $45.000 $50.000 $5.000
HMCL ACP TY-D AC-1.5
TON 86.000 $200.000 $200.000 $215.000 $500.000 $250.000
RETAINING WALL (CAST - IN - PLACE)
SF 24.000 $80.000 $80.000 $100.000 $85.000 $100.000
RAIL (HANDRAIL)(TY B)
LF 59.000 $120.000 $125.000 $160.000 $185.000 $150.000
RC PIPE (CL III)(24 IN)
LF 20.000 $250.000 $125.000 $111.000 $150.000 $100.000
INLET (COMP) (TY SIDEWALK BRIDGE)
EA 4.000 $11,000.000 $12,500.000 $20,000.000 $20,000.000 $14,500.000
SET (TY II) (24 IN) (CMP) (4: 1) (C)
EA 2.000 $2,000.000 $2,800.000 $5,900.000 $2,000.000 $1,400.000
REMOV STR (SET)
EA 2.000 $1,000.000 $500.000 $650.000 $500.000 $500.000
REMOV STR (SMALL FENCE)
LF 97.000 $6.000 $12.000 $10.000 $5.000 $5.000
MOBILIZATION
LS 1.000 $415,000.000 $275,000.000 $480,000.000 $500,000.000 $500,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 23.000 $6,000.000 $1,000.000 $9,000.000 $8,500.000 $7,999.000
TEMP SEDMT CONT FENCE (INSTALL)
LF 30,042.000 $3.000 $0.010 $3.150 $4.000 $3.000
TEMP SEDMT CONT FENCE (REMOVE)
LF 30,042.000 $1.500 $0.010 $0.600 $2.000 $1.000
CONC CURB & GUTTER (TY II)
LF 1,920.000 $25.000 $40.000 $50.000 $55.000 $25.000
DRIVEWAYS (CONC)
SY 9,138.000 $100.000 $95.000 $98.000 $85.000 $120.000
CONC SIDEWALKS (5")
SY 22,620.000 $60.000 $90.000 $69.200 $55.000 $100.000
CURB RAMPS (TY 1)
SY 103.000 $190.000 $90.000 $250.000 $300.000 $140.000
CURB RAMPS (TY 2)
SY 32.000 $200.000 $90.000 $250.000 $300.000 $140.000
CURB RAMPS (TY 5)
SY 10.000 $550.000 $90.000 $300.000 $300.000 $200.000
CURB RAMPS (TY 7)
SY 891.000 $170.000 $90.000 $250.000 $300.000 $140.000
CURB RAMPS (TY 10)
SY 864.000 $350.000 $90.000 $250.000 $300.000 $140.000
MAILBOX INSTALL-S (TWG-POST) TY 1
EA 30.000 $220.000 $155.000 $260.000 $850.000 $500.000
ALUMINUM SIGNS (TY A)
SF 126.000 $25.000 $30.000 $33.000 $30.000 $50.000
IN SM RD SN SUP&AM TY10BWG(1)SB(P)
EA 270.000 $991.000 $400.000 $700.000 $850.000 $800.000
IN SM RD SN SUP&AM TY10BWG(1)SB(T)
EA 21.000 $1,075.000 $400.000 $770.000 $850.000 $800.000
IN SM RD SN SUP&AM TY10BWG(1)SB(U)
EA 4.000 $560.000 $400.000 $770.000 $650.000 $800.000
IN SM RD SN SUP&AM TYS80(1)SB(P)
EA 5.000 $760.000 $400.000 $770.000 $100.000 $800.000
IN SM RD SN SUP&AM TYS80(1)SB(T)
EA 2.000 $900.000 $400.000 $830.000 $100.000 $800.000
IN SM RD SN SUP&AM TYS80(1)SB(U)
EA 15.000 $798.000 $400.000 $950.000 $6.000 $800.000
RELOCATE SM RD SN SUP&AM TY 10BWG
EA 4.000 $600.000 $150.000 $415.000 $8.000 $800.000
REMOVE SM RD SN SUP&AM
EA 183.000 $184.000 $50.000 $108.000 $20.000 $200.000
REMOVE SM RD SN SUP&AM (SIGN ONLY)
EA 10.000 $56.000 $25.000 $12.000 $8.000 $500.000
PREFAB PAV MRK TY C (W) (6") (SLD)
LF 1,633.000 $2.000 $6.500 $6.800 $6.000 $8.000
PREFAB PAV MRK TY C (W) (12") (SLD)
LF 520.000 $10.000 $13.000 $13.750 $6.000 $8.000
PREFAB PAV MRK TY C (W) (24") (SLD)
LF 430.000 $15.000 $26.000 $27.500 $20.000 $14.000
ELIM EXT PAV MRK & MRKS (12")
LF 2,583.000 $2.000 $3.500 $3.700 $6.000 $1.000
PAV SURF PREP FOR MRK (6")
LF 1,633.000 $0.500 $1.000 $1.150 $6.000 $0.500
PAV SURF PREP FOR MRK (12")
LF 520.000 $1.000 $2.000 $2.300 $6.000 $1.000
PAV SURF PREP FOR MRK (24")
LF 430.000 $1.750 $3.000 $3.450 $20.000 $2.000
LITTER REMOVAL
CYC 8.000 $8,000.000 $500.000 $850.000 $3,000.000 $2,000.000
CLEANING / SWEEPING (SPOT)
MI 6.700 $3,000.000 $100.000 $1,250.000 $5,000.000 $2,000.000
INSTALL SALVAGED FENCE
LF 97.000 $28.000 $5.000 $20.000 $20.000 $30.000
PORTABLE CHANGEABLE MESSAGE SIGN
EA 2.000 $12,000.000 $1,500.000 $35,000.000 $16,500.000 $39,999.000
TMA (STATIONARY)
DAY 816.000 $250.000 $1.000 $100.000 $250.000 $400.000
CURB INLET SEDIMENT PROTECTION
LF 402.000 $20.000 $1.000 $8.000 $10.000 $20.000
Totals: $4,588,697.000 $4,034,018.840 $4,837,441.050 $4,863,138.000 $5,655,489.100