PREPARING ROW
|
STA
|
229.900
|
$400.000
|
$250.000
|
$200.000
|
|
|
EXCAVATION (SPECIAL)
|
CY
|
660.000
|
$20.000
|
$20.000
|
$25.000
|
|
|
EMBANKMENT (FINAL)(ORD COMP)(TY B)
|
CY
|
330.000
|
$8.000
|
$30.000
|
$25.000
|
|
|
BLOCK SODDING
|
SY
|
7,516.000
|
$6.000
|
$5.000
|
$5.000
|
|
|
VEGETATIVE WATERING
|
MG
|
126.490
|
$30.000
|
$20.000
|
$100.000
|
|
|
D-GR HMA(SQ) TY-D PG76-22
|
TON
|
214.000
|
$90.000
|
$300.000
|
$185.000
|
|
|
FLEXIBLE PAVEMENT STRUCTURE REPAIR(6")
|
SY
|
388.000
|
$40.000
|
$50.000
|
$80.000
|
|
|
PLANE ASPH CONC PAV(0" TO 4")
|
SY
|
73.000
|
$6.000
|
$10.000
|
$25.000
|
|
|
CONC PAV (JOINT REINF) (10")
|
SY
|
250.000
|
$45.000
|
$100.000
|
$145.000
|
|
|
DRILL SHAFT (RDWY ILL POLE) (30 IN)
|
LF
|
56.000
|
$300.000
|
$300.000
|
$85.000
|
|
|
CL A CONC (MISC)
|
CY
|
28.000
|
$500.000
|
$1,000.000
|
$650.000
|
|
|
CL A CONC (STEPS)
|
CY
|
35.100
|
$500.000
|
$1,000.000
|
$650.000
|
|
|
RIPRAP (CONC)(6 IN)
|
CY
|
182.000
|
$450.000
|
$700.000
|
$650.000
|
|
|
RAIL (HANDRAIL)(TY A)
|
LF
|
460.000
|
$125.000
|
$70.000
|
$125.000
|
|
|
GRATE
|
EA
|
27.000
|
$400.000
|
$700.000
|
$1,000.000
|
|
|
ADJUSTING MANHOLES
|
EA
|
5.000
|
$600.000
|
$200.000
|
$150.000
|
|
|
ADJUSTING MANHOLES (WATER VALVE BOX)
|
EA
|
29.000
|
$250.000
|
$200.000
|
$100.000
|
|
|
ADJUSTING MANHOLES (WATER METER)
|
EA
|
78.000
|
$500.000
|
$200.000
|
$100.000
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$180,000.000
|
$300,000.000
|
$300,000.000
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
18.000
|
$2,200.000
|
$3,000.000
|
$2,500.000
|
|
|
SANDBAGS FOR EROSION CONTROL
|
EA
|
2,000.000
|
$4.000
|
$1.000
|
$0.100
|
|
|
BIODEG EROSN CONT LOGS (INSTL) (12")
|
LF
|
2,000.000
|
$4.000
|
$1.000
|
$0.100
|
|
|
BIODEG EROSN CONT LOGS (REMOVE)
|
LF
|
2,000.000
|
$2.500
|
$1.000
|
$0.100
|
|
|
CONC CURB (TY II)
|
LF
|
2,397.000
|
$20.000
|
$12.000
|
$20.000
|
|
|
CONC CURB & GUTTER (TY I)
|
LF
|
53.000
|
$22.000
|
$30.000
|
$40.000
|
|
|
CONC CURB & GUTTER (TY II)
|
LF
|
6,949.000
|
$25.000
|
$25.000
|
$36.000
|
|
|
CONC CURB (SLOTTED)
|
LF
|
54.000
|
$50.000
|
$50.000
|
$40.000
|
|
|
CONC CURB & GUTTER (ARMOR CURB)
|
LF
|
28.000
|
$150.000
|
$300.000
|
$250.000
|
|
|
CONC CURB & GUTTER(VALLEY GUTTER)(36")
|
LF
|
94.000
|
$45.000
|
$100.000
|
$45.000
|
|
|
DRIVEWAYS (CONC)
|
SY
|
6,923.000
|
$60.000
|
$60.000
|
$70.000
|
|
|
DRIVEWAYS (ACP)
|
SY
|
1,918.000
|
$40.000
|
$40.000
|
$45.000
|
|
|
CONC SIDEWALKS (4")
|
SY
|
8,257.000
|
$50.000
|
$50.000
|
$100.000
|
|
|
CURB RAMPS (TY 1)
|
SY
|
567.000
|
$60.000
|
$80.000
|
$100.000
|
|
|
CURB RAMPS (TY 2)
|
SY
|
171.000
|
$60.000
|
$80.000
|
$100.000
|
|
|
CURB RAMPS (TY 3)
|
SY
|
291.000
|
$60.000
|
$80.000
|
$100.000
|
|
|
CURB RAMPS (TY 5)
|
SY
|
8.000
|
$60.000
|
$80.000
|
$100.000
|
|
|
CURB RAMPS (TY 6)
|
SY
|
659.000
|
$60.000
|
$80.000
|
$100.000
|
|
|
CURB RAMPS (TY 7)
|
SY
|
1,564.000
|
$60.000
|
$80.000
|
$100.000
|
|
|
CURB RAMPS (TY 10)
|
SY
|
398.000
|
$60.000
|
$80.000
|
$100.000
|
|
|
CURB RAMPS (TY 22)
|
SY
|
17.000
|
$60.000
|
$80.000
|
$100.000
|
|
|
CONC SIDEWALKS (SPECIAL) (TYPE A)
|
SY
|
20.000
|
$250.000
|
$200.000
|
$100.000
|
|
|
CONC SIDEWALKS (SPECIAL) (TYPE B)
|
SY
|
2,688.000
|
$70.000
|
$80.000
|
$180.000
|
|
|
RIGHT OF WAY MARKERS
|
EA
|
1.000
|
$400.000
|
$100.000
|
$1,000.000
|
|
|
CHAIN LINK FENCE (INSTALL) (6')
|
LF
|
160.000
|
$20.000
|
$20.000
|
$15.000
|
|
|
CHAIN LINK FENCE (REMOVE)
|
LF
|
162.000
|
$8.000
|
$5.000
|
$5.000
|
|
|
MAILBOX INSTALL-S (TWG-POST) TY 2
|
EA
|
1.000
|
$225.000
|
$200.000
|
$250.000
|
|
|
MAILBOX INSTALL-S (WC-POST) TY 3
|
EA
|
35.000
|
$200.000
|
$200.000
|
$250.000
|
|
|
MAILBOX INSTALL-D (WC-POST) TY 3
|
EA
|
1.000
|
$225.000
|
$200.000
|
$250.000
|
|
|
MAILBOX INSTALL-S (TIM-POST) TY 5
|
EA
|
1.000
|
$450.000
|
$200.000
|
$250.000
|
|
|
RELOCATE RD IL ASM (SHOE-BASE)
|
EA
|
7.000
|
$3,000.000
|
$500.000
|
$250.000
|
|
|
CONDT (PVC) (SCH 80) (3")
|
LF
|
375.000
|
$15.000
|
$10.000
|
$6.700
|
|
|
ELEC CONDR (NO.6) BARE
|
LF
|
50.000
|
$2.500
|
$2.000
|
$1.100
|
|
|
GROUND BOX TY D (162922)
|
EA
|
53.000
|
$500.000
|
$600.000
|
$500.000
|
|
|
GROUND BOX TY D (162922)W/APRON
|
EA
|
7.000
|
$800.000
|
$850.000
|
$750.000
|
|
|
REMOVE GROUND BOX
|
EA
|
36.000
|
$200.000
|
$100.000
|
$250.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
|
EA
|
2.000
|
$1,200.000
|
$1,000.000
|
$150.000
|
|
|
RELOCATE SM RD SN SUP&AM TY 10BWG
|
EA
|
114.000
|
$300.000
|
$500.000
|
$150.000
|
|
|
REMOVE SM RD SN SUP&AM
|
EA
|
6.000
|
$50.000
|
$200.000
|
$150.000
|
|
PREFAB PAV MRK TY C (W) (4") (SLD)
|
LF
|
209.000
|
$4.250
|
$3.250
|
$3.000
|
|
PREFAB PAV MRK TY C (W) (8") (SLD)
|
LF
|
14.000
|
$5.250
|
$10.000
|
$6.000
|
|
PREFAB PAV MRK TY C (W) (12") (SLD)
|
LF
|
4,733.000
|
$6.250
|
$10.000
|
$8.000
|
|
PREFAB PAV MRK TY C (W) (24") (SLD)
|
LF
|
1,216.000
|
$10.500
|
$20.000
|
$9.000
|
|
PREFAB PAV MRK TY C (W) (ARROW)
|
EA
|
5.000
|
$225.000
|
$300.000
|
$20.000
|
|
PREFAB PAV MRK TY C (Y) (4") (SLD)
|
LF
|
327.000
|
$4.250
|
$5.000
|
$3.000
|
|
|
ELIM EXT PAV MRK & MRKS (4")
|
LF
|
695.000
|
$1.250
|
$2.000
|
$1.000
|
|
|
ELIM EXT PAV MRK & MRKS (8")
|
LF
|
203.000
|
$2.250
|
$3.000
|
$1.000
|
|
|
ELIM EXT PAV MRK & MRKS (12")
|
LF
|
4,764.000
|
$2.500
|
$4.000
|
$1.000
|
|
|
ELIM EXT PAV MRK & MRKS (24")
|
LF
|
1,274.000
|
$3.000
|
$7.000
|
$2.000
|
|
|
ELIM EXT PAV MRK & MRKS (ARROW)
|
EA
|
5.000
|
$15.000
|
$50.000
|
$25.000
|
|
|
TRF SIG CBL (TY A)(14 AWG)(2 CONDR)
|
LF
|
50.000
|
$4.000
|
$6.000
|
$4.000
|
|
|
RELOCATE RDSD FLASH BEACON ASSEMBLY
|
EA
|
1.000
|
$3,000.000
|
$1,000.000
|
$500.000
|
|
|
RELOCT RDSD FLSH BCN AM (SOLAR PWRD)
|
EA
|
1.000
|
$3,000.000
|
$1,000.000
|
$500.000
|
|
|
PED POLE ASSEMBLY
|
EA
|
1.000
|
$1,100.000
|
$2,000.000
|
$2,000.000
|
|
|
PED DETECT PUSH BUTTON (STANDARD)
|
EA
|
77.000
|
$450.000
|
$500.000
|
$500.000
|
|
|
INSTALL OF VEHICLE DETECTORS
|
LF
|
10,000.000
|
$2.000
|
$0.010
|
$0.100
|
|
|
REMOVAL OF SIGNAL HEAD ASSM
|
EA
|
2.000
|
$150.000
|
$500.000
|
$250.000
|
|
|
REMOVAL OF PEDESTRIAN PUSH BUTTONS
|
EA
|
79.000
|
$75.000
|
$200.000
|
$150.000
|
|
|
TREE REMOVAL (36" - 42" DIA)
|
EA
|
1.000
|
$2,000.000
|
$3,000.000
|
$2,500.000
|
|
|
TREE AND BRUSH REMOVAL
|
AC
|
1.000
|
$400.000
|
$10,000.000
|
$2,500.000
|
|
|
TREE TRIMMING (0"-12")
|
EA
|
1.000
|
$350.000
|
$1,000.000
|
$2,500.000
|
|
Totals: |
$2,493,758.950
|
$2,813,521.050
|
$3,597,425.500
|