REMOVING CONC (RIPRAP)
|
SY
|
2,410.000
|
$16.000
|
$14.770
|
$16.500
|
$17.000
|
|
|
REMOVING CONC (CURB AND GUTTER)
|
LF
|
904.000
|
$10.000
|
$4.150
|
$7.350
|
$30.000
|
|
|
REMOVING STAB BASE AND ASPH PAV (11")
|
SY
|
2,340.000
|
$6.000
|
$4.770
|
$10.000
|
$7.000
|
|
|
EXCAVATION (ROADWAY)
|
CY
|
7,479.000
|
$9.000
|
$13.240
|
$18.500
|
$20.000
|
|
|
SUBGRADE WIDENING (ORD COMP)
|
STA
|
21.000
|
$400.000
|
$1,155.160
|
$770.000
|
$750.000
|
|
|
EMBANKMENT (FINAL)(DENS CONT)(TY C)
|
CY
|
220.000
|
$27.500
|
$164.670
|
$54.000
|
$50.000
|
|
|
BLADING
|
STA
|
87.000
|
$125.000
|
$241.120
|
$130.000
|
$265.000
|
|
|
DRILL SEEDING (PERM) (URBAN) (SANDY)
|
SY
|
7,760.000
|
$0.250
|
$1.180
|
$0.500
|
$0.750
|
|
|
VEGETATIVE WATERING
|
MG
|
261.000
|
$45.000
|
$37.650
|
$47.000
|
$26.000
|
|
|
PROOF ROLLING
|
HR
|
36.000
|
$155.000
|
$161.400
|
$165.000
|
$90.000
|
|
|
FL BS (CMP IN PLC)(TY A GR 4) (6")
|
SY
|
4,212.000
|
$20.000
|
$13.340
|
$16.000
|
$13.000
|
|
|
FL BS (RDWY DEL) (TY A GR 4) (IN VEH)
|
CY
|
4,274.000
|
$50.000
|
$41.690
|
$48.000
|
$51.000
|
|
|
REWORK BS MTL (TY C) (7.5") (DENS CONT)
|
SY
|
38,464.000
|
$3.000
|
$2.190
|
$5.050
|
$3.500
|
|
|
CEMENT
|
TON
|
35.000
|
$150.000
|
$151.930
|
$170.000
|
$190.000
|
|
|
CEMENT TREAT (SUBGRADE)(6")
|
SY
|
4,212.000
|
$2.750
|
$3.300
|
$3.800
|
$3.200
|
|
|
SALV HAUL & STKPL RCL APH PV (6")
|
SY
|
38,464.000
|
$4.000
|
$3.200
|
$3.100
|
$4.000
|
|
|
PRIME COAT (MC-30)
|
GAL
|
842.000
|
$4.000
|
$5.820
|
$5.450
|
$7.500
|
|
|
FOG SEAL (CSS-1H)
|
GAL
|
6,923.000
|
$3.500
|
$3.860
|
$3.900
|
$4.400
|
|
|
ASPH (AC-20-5TR)
|
GAL
|
71,614.000
|
$3.250
|
$3.630
|
$3.950
|
$4.400
|
|
|
AGGR(TY-PB GR-3 SAC-B)
|
CY
|
1,550.000
|
$100.000
|
$188.340
|
$160.000
|
$140.000
|
|
|
D-GR HMA(SQ) TY-D SAC-B PG70-28
|
TON
|
28.000
|
$150.000
|
$285.180
|
$480.000
|
$330.000
|
|
|
D-GR HMA TY-B PG70-28
|
TON
|
7,483.000
|
$95.000
|
$97.540
|
$120.000
|
$122.000
|
|
|
STONE-MTRX-ASPH SMA-D SAC-A PG70-28
|
TON
|
20,120.000
|
$150.000
|
$139.590
|
$143.500
|
$155.000
|
|
|
FLEXIBLE PAVEMENT STRUCTURE REPAIR(6")
|
SY
|
4,263.000
|
$35.000
|
$43.560
|
$57.500
|
$74.000
|
|
|
PLANE ASPH CONC PAV (2")
|
SY
|
165,401.000
|
$1.500
|
$1.300
|
$1.650
|
$1.300
|
|
|
FULL-DPTH REP(BR APPROACH SLAB)(9"-13")
|
SY
|
300.000
|
$400.000
|
$340.740
|
$445.000
|
$310.000
|
|
|
FLOWABLE BACKFILL
|
CY
|
270.000
|
$250.000
|
$142.550
|
$280.000
|
$270.000
|
|
|
CL C CONC (RAIL FOUNDATION)
|
CY
|
50.000
|
$600.000
|
$741.560
|
$890.000
|
$570.000
|
|
|
RIPRAP (CONC)(4 IN)
|
CY
|
1,713.000
|
$600.000
|
$751.900
|
$610.000
|
$500.000
|
|
|
RIPRAP (MOW STRIP)(4 IN)
|
CY
|
240.000
|
$410.000
|
$641.660
|
$725.000
|
$500.000
|
|
|
RAIL (TY T551)
|
LF
|
306.000
|
$65.000
|
$188.360
|
$110.000
|
$140.000
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$1,000,000.000
|
$933,265.870
|
$1,020,000.000
|
$1,000,000.000
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
18.000
|
$10,000.000
|
$5,185.220
|
$19,500.000
|
$15,000.000
|
|
|
SANDBAGS FOR EROSION CONTROL
|
EA
|
425.000
|
$10.000
|
$7.060
|
$4.150
|
$10.000
|
|
|
BIODEG EROSN CONT LOGS (INSTL) (12")
|
LF
|
600.000
|
$7.500
|
$2.910
|
$3.600
|
$6.000
|
|
|
BIODEG EROSN CONT LOGS (REMOVE)
|
LF
|
600.000
|
$2.500
|
$0.890
|
$1.400
|
$2.000
|
|
|
CONSTRUCTING DETOURS
|
SY
|
2,650.000
|
$75.000
|
$76.720
|
$86.500
|
$95.000
|
|
|
PORT CTB (DES SOURCE)(F-SHAPE)(TY 1)
|
LF
|
16,000.000
|
$16.000
|
$9.160
|
$8.750
|
$13.000
|
|
|
PORT CTB (MOVE)(F-SHAPE)(TY 1)
|
LF
|
24,700.000
|
$7.000
|
$4.300
|
$7.300
|
$12.000
|
|
|
PORT CTB (STKPL)(F-SHAPE)(TY 1)
|
LF
|
16,000.000
|
$10.000
|
$9.160
|
$8.150
|
$12.000
|
|
|
RUMBLE STRIPS (SHOULDER)
|
LF
|
84,186.000
|
$0.100
|
$0.280
|
$0.160
|
$0.300
|
|
|
MTL W-BEAM GD FEN (STEEL POST)
|
LF
|
12,477.000
|
$27.000
|
$30.860
|
$25.500
|
$27.000
|
|
|
MTL BEAM GD FEN TRANS (THRIE-BEAM)
|
EA
|
15.000
|
$2,125.000
|
$2,230.230
|
$2,100.000
|
$1,600.000
|
|
|
DOWNSTREAM ANCHOR TERMINAL SECTION
|
EA
|
7.000
|
$1,300.000
|
$1,305.660
|
$1,300.000
|
$1,200.000
|
|
|
MTL BM GD FEN TRANS (NON - SYM)
|
EA
|
5.000
|
$1,000.000
|
$1,186.960
|
$945.000
|
$1,100.000
|
|
|
REMOVE METAL BEAM GUARD FENCE
|
LF
|
10,428.000
|
$4.750
|
$2.370
|
$3.350
|
$2.200
|
|
|
REMOVE TERMINAL ANCHOR SECTION
|
EA
|
6.000
|
$250.000
|
$178.050
|
$390.000
|
$160.000
|
|
|
REMOVE DOWNSTREAM ANCHOR TERMINAL
|
EA
|
3.000
|
$200.000
|
$178.040
|
$335.000
|
$160.000
|
|
|
RM MTL BM GD FENCE TRANS (THRIE-BEAM)
|
EA
|
5.000
|
$300.000
|
$237.390
|
$3,700.000
|
$220.000
|
|
|
GUARDRAIL END TREATMENT (INSTALL)
|
EA
|
17.000
|
$2,600.000
|
$2,967.410
|
$3,000.000
|
$2,600.000
|
|
|
GUARDRAIL END TREATMENT (REMOVE)
|
EA
|
15.000
|
$450.000
|
$237.390
|
$335.000
|
$220.000
|
|
|
CRASH CUSH ATTEN (MOVE & RESET)
|
EA
|
6.000
|
$1,800.000
|
$1,186.960
|
$3,100.000
|
$1,000.000
|
|
|
CRASH CUSH ATTEN (REMOVE)
|
EA
|
4.000
|
$1,800.000
|
$1,388.750
|
$1,200.000
|
$1,000.000
|
|
|
CRASH CUSH ATTEN (INSTL)(S)(N)(TL3)
|
EA
|
3.000
|
$11,500.000
|
$8,902.220
|
$10,500.000
|
$12,500.000
|
|
|
REPLACE EXISTING ALUMINUM SIGNS(TY G)
|
SF
|
131.250
|
$40.000
|
$21.370
|
$52.500
|
$19.000
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(T-2EXT)
|
EA
|
2.000
|
$1,250.000
|
$1,186.970
|
$1,200.000
|
$1,100.000
|
|
|
REMOVE SM RD SN SUP&AM
|
EA
|
1.000
|
$500.000
|
$118.700
|
$83.500
|
$110.000
|
|
|
INSTL DEL ASSM (D-SW)SZ 1(FLX)GND
|
EA
|
120.000
|
$75.000
|
$59.350
|
$120.000
|
$55.000
|
|
|
INSTL DEL ASSM (D-SY)SZ 1(FLX)GND
|
EA
|
120.000
|
$145.000
|
$59.350
|
$120.000
|
$55.000
|
|
|
INSTL OM ASSM (OM-2Z)(FLX)GND
|
EA
|
25.000
|
$100.000
|
$77.150
|
$120.000
|
$70.000
|
|
|
INSTL OM ASSM (OM-2Z)(FLX)GND(BI)
|
EA
|
18.000
|
$100.000
|
$83.090
|
$120.000
|
$75.000
|
|
|
REMOVE DELIN & OBJECT MARKER ASSMS
|
EA
|
43.000
|
$30.000
|
$11.870
|
$16.500
|
$12.000
|
|
|
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2
|
EA
|
113.000
|
$45.000
|
$11.870
|
$30.000
|
$12.000
|
|
|
INSTL DEL ASSM (D-SY)SZ 1(BRF)GF2
|
EA
|
25.000
|
$45.000
|
$11.870
|
$30.000
|
$12.000
|
|
|
WK ZN PAV MRK NON-REMOV (W)4"(SLD)
|
LF
|
42,000.000
|
$0.140
|
$0.250
|
$0.230
|
$0.220
|
|
|
WK ZN PAV MRK NON-REMOV (W)6"(BRK)
|
LF
|
10,000.000
|
$0.300
|
$0.360
|
$0.330
|
$0.320
|
|
|
WK ZN PAV MRK NON-REMOV (Y)4"(SLD)
|
LF
|
42,000.000
|
$0.150
|
$0.250
|
$0.230
|
$0.220
|
|
|
WK ZN PAV MRK REMOV (REFL) TY I-A
|
EA
|
1,924.000
|
$4.000
|
$4.150
|
$3.900
|
$3.700
|
|
|
WK ZN PAV MRK REMOV (REFL) TY I-C
|
EA
|
2,014.000
|
$4.000
|
$4.150
|
$3.900
|
$3.700
|
|
|
WK ZN PAV MRK REMOV (TRAF BTN) TY W
|
EA
|
6,038.000
|
$3.500
|
$2.490
|
$2.350
|
$2.200
|
|
|
WK ZN PAV MRK REMOV (TRAF BTN) TY Y
|
EA
|
5,768.000
|
$3.500
|
$2.490
|
$2.350
|
$2.200
|
|
WK ZN PAV MRK SHT TERM (TAB)TY Y-2
|
EA
|
4,300.000
|
$2.500
|
$1.240
|
$1.100
|
$0.700
|
|
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
|
LF
|
3,500.000
|
$0.400
|
$1.130
|
$1.050
|
$1.000
|
|
|
PAVEMENT SEALER 4"
|
LF
|
3,200.000
|
$0.250
|
$0.280
|
$0.270
|
$0.250
|
|
|
PAVEMENT SEALER 6"
|
LF
|
1,600.000
|
$0.250
|
$0.420
|
$0.390
|
$0.370
|
|
RE PM W/RET REQ TY I (W)4"(SLD)(100MIL)
|
LF
|
47,616.000
|
$0.200
|
$0.570
|
$0.530
|
$0.500
|
|
RE PM W/RET REQ TY I (W)6"(BRK)(100MIL)
|
LF
|
11,904.000
|
$0.350
|
$0.850
|
$0.800
|
$0.760
|
|
RE PM W/RET REQ TY I (Y)4"(BRK)(100MIL)
|
LF
|
47,616.000
|
$0.200
|
$0.570
|
$0.530
|
$0.500
|
|
PREFAB PAV MRK TY C (W) (12") (LNDP)
|
LF
|
500.000
|
$15.000
|
$13.060
|
$12.000
|
$12.000
|
|
PREFAB PAV MRK TY C (W) (12") (SLD)
|
LF
|
600.000
|
$10.000
|
$13.060
|
$12.000
|
$12.000
|
|
PREFAB PAV MRK TY C (W) (ARROW)
|
EA
|
6.000
|
$260.000
|
$580.430
|
$545.000
|
$520.000
|
|
PREFAB PAV MRK TY C (W) (WORD)
|
EA
|
6.000
|
$385.000
|
$830.870
|
$780.000
|
$750.000
|
|
REFL PAV MRKR TY II-C-R
|
EA
|
1,000.000
|
$2.250
|
$4.750
|
$4.450
|
$4.500
|
|
|
ELIM EXT PAV MRK & MRKS (4")
|
LF
|
27,000.000
|
$0.450
|
$0.650
|
$0.610
|
$0.900
|
|
|
PAV SURF PREP FOR MRK (4")
|
LF
|
3,200.000
|
$0.250
|
$0.330
|
$0.310
|
$0.300
|
|
|
PAV SURF PREP FOR MRK (6")
|
LF
|
1,600.000
|
$0.750
|
$0.500
|
$0.470
|
$0.450
|
|
|
PAV SURF PREP FOR MRK (12")
|
LF
|
1,000.000
|
$2.000
|
$0.990
|
$0.920
|
$0.900
|
|
|
PAV SURF PREP FOR MRK (ARROW)
|
EA
|
6.000
|
$32.500
|
$17.530
|
$16.500
|
$16.000
|
|
|
PAV SURF PREP FOR MRK (WORD)
|
EA
|
6.000
|
$63.500
|
$19.480
|
$18.500
|
$17.000
|
|
|
FULL - WIDTH MOWING
|
CYC
|
4.000
|
$10,000.000
|
$5,995.810
|
$7,600.000
|
$2,200.000
|
|
|
LITTER REMOVAL
|
CYC
|
4.000
|
$5,000.000
|
$3,356.510
|
$5,000.000
|
$1,900.000
|
|
|
ASPHALT BINDER (PG64-22)
|
GAL
|
96,159.000
|
$2.500
|
$3.000
|
$2.800
|
$3.000
|
|
|
CEMENT
|
TON
|
115.000
|
$140.000
|
$151.930
|
$170.000
|
$192.000
|
|
|
FOAMED ASPHALT TREAT (8") (DC)
|
SY
|
38,464.000
|
$3.500
|
$12.290
|
$6.500
|
$6.500
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
DAY
|
315.000
|
$110.000
|
$89.020
|
$89.000
|
$120.000
|
|
|
TMA (STATIONARY)
|
DAY
|
55.000
|
$175.000
|
$1,186.960
|
$605.000
|
$350.000
|
|
|
TMA (MOBILE OPERATION)
|
DAY
|
55.000
|
$500.000
|
$1,422.770
|
$1,100.000
|
$580.000
|
|
Totals: |
$9,907,151.400
|
$10,343,902.542
|
$10,803,028.245
|
$10,851,008.490
|