LUBBOCK US 62 (0130-05-089)

Items: 41

County: LUBBOCK
Length: N/A
Highway: US 62
District: LUBBOCK
Control Number: 0130-05-089
DBE Goal: N/A
Project: STP 2023(765)HES
Guaranty: N/A
Time: 32 WORKING DAYS
Engineer's Estimate: $423,842.00
Date: 06/02/2023 (3 years ago)
Contract Number: N/A
Type: TRAFFIC SIGNAL IMPROVEMENTS
Mail/Deliver Bids To: N/A
JEREMY DEARING
CODY THOMAS
Actions:
Notice HCS Excel Tabs Print Print Notice
Bidders (2)
E
Engineer's Estimate
$423,842.00
$340,196.25
Over/Under Est: -19.74% -$83,645.75
$460,950.30
Over/Under Est: 8.76% $37,108.30
Amt Left: 35.5% $120,754.05
Subcontractor Percentage Amount
BARRICADES UNLIMITED 0.82% $2,789.61
Total: 0.82% $2,789.61

Bid Items & Bid Tabulations

41 Total 0 of 41
LUBBOCK  |  US 62  |  LUBBOCK  |  0130-05-089  |  06/02/2023  |  $423,842.00  |  STP 2023(765)HES  |  TRAF SIGNAL IMPRVS  |  32 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
APOLLO CONSTRUCTORS, INC.
YUNEX LLC
DRILL SHAFT (24 IN)
LF 6.000 $425.000 $185.000 $395.800
DRILL SHAFT (TRF SIG POLE) (36 IN)
LF 30.000 $500.000 $375.000 $687.700
DRILL SHAFT (TRF SIG POLE) (48 IN)
LF 44.000 $550.000 $500.000 $833.600
MOBILIZATION
LS 1.000 $37,000.000 $34,000.000 $43,902.500
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 4.000 $5,000.000 $1,600.000 $10,277.200
SANDBAGS FOR EROSION CONTROL
EA 6.000 $35.000 $25.000 $39.400
CONDT (PVC) (SCH 80) (2")
LF 10.000 $20.000 $25.000 $60.800
CONDT (PVC) (SCH 80) (2") (BORE)
LF 310.000 $40.000 $37.000 $39.300
CONDT (PVC) (SCH 80) (4")
LF 5.000 $50.000 $40.000 $83.000
CONDT (PVC) (SCH 80) (4") (BORE)
LF 385.000 $50.000 $45.000 $51.300
ELEC CONDR (NO.6) BARE
LF 390.000 $2.600 $2.250 $4.700
ELEC CONDR (NO.2) INSULATED
LF 855.000 $4.500 $3.000 $5.900
GROUND BOX TY D (162922)
EA 2.000 $1,350.000 $1,700.000 $2,146.400
GROUND BOX TY D (162922)W/APRON
EA 3.000 $2,250.000 $1,800.000 $2,207.400
REMOVE GROUND BOX
EA 5.000 $600.000 $500.000 $384.200
REMOVE ELECTRICAL SERVICES
EA 1.000 $800.000 $1,000.000 $1,152.500
ELC SRV TY D 120/240 070(NS)SS(E)SP(O)
EA 1.000 $11,000.000 $8,500.000 $9,698.800
INSTALL HWY TRF SIG (ISOLATED)
EA 1.000 $40,000.000 $22,500.000 $37,131.100
REMOVING TRAFFIC SIGNALS
EA 1.000 $4,000.000 $15,000.000 $19,573.200
VEH SIG SEC (12")LED(GRN)
EA 12.000 $350.000 $380.000 $490.900
VEH SIG SEC (12")LED(GRN ARW)
EA 4.000 $330.000 $380.000 $490.900
VEH SIG SEC (12")LED(YEL)
EA 12.000 $350.000 $380.000 $490.900
VEH SIG SEC (12")LED(YEL ARW)
EA 8.000 $330.000 $380.000 $490.900
VEH SIG SEC (12")LED(RED)
EA 12.000 $350.000 $380.000 $490.900
VEH SIG SEC (12")LED(RED ARW)
EA 4.000 $330.000 $380.000 $490.900
PED SIG SEC (LED)(COUNTDOWN)
EA 8.000 $1,100.000 $650.000 $872.000
BACKPLATE W/REF BRDR(3 SEC)(VENT)ALUM
EA 12.000 $250.000 $125.000 $250.000
BACKPLATE W/REF BRDR(4 SEC)(VENT)ALUM
EA 4.000 $275.000 $145.000 $274.400
TRF SIG CBL (TY A)(12 AWG)(4 CONDR)
LF 1,140.000 $5.000 $3.000 $4.200
TRF SIG CBL (TY A)(12 AWG)(5 CONDR)
LF 440.000 $5.200 $3.500 $4.800
TRF SIG CBL (TY A)(12 AWG)(7 CONDR)
LF 340.000 $8.000 $4.000 $6.600
TRF SIG CBL (TY A)(12 AWG)(16 CONDR)
LF 530.000 $7.500 $6.500 $9.700
INS TRF SIG PL AM(S)1 ARM(40')
EA 1.000 $17,000.000 $19,000.000 $15,335.400
INS TRF SIG PL AM(S)1 ARM(44')
EA 1.000 $22,000.000 $20,000.000 $16,067.100
INS TRF SIG PL AM(S)1 ARM(50')
EA 2.000 $43,000.000 $36,000.000 $36,189.100
PED POLE ASSEMBLY
EA 3.000 $2,250.000 $1,450.000 $4,070.800
INSTALL OF CABLES
LF 655.000 $2.500 $2.500 $3.400
INSTALL OF PEDESTRIAN PUSH BUTTONS
EA 8.000 $650.000 $500.000 $768.300
REMOVAL OF CONTROL CABINET(GRND MNT)
EA 1.000 $1,000.000 $1,250.000 $2,304.900
VIVDS CABLE (INSTALL)
LF 655.000 $4.000 $3.750 $4.000
TMA (STATIONARY)
DAY 128.000 $250.000 $100.000 $122.000
Totals: $423,842.000 $340,196.250 $460,950.300