LUBBOCK US 62 (0130-05-085)

Items: 219

County: LUBBOCK
Length: N/A
Highway: US 62
District: LUBBOCK
Control Number: 0130-05-085
DBE Goal: N/A
Project: C 130-5-85
Guaranty: N/A
Time: 656 WORKING DAYS
Engineer's Estimate: $22,738,147.47
Date: 02/04/2022 (4 years ago)
Contract Number: N/A
Type: SURFACING/ROADWAY RESTORATION
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice HCS Excel Tabs Print Print Notice
Documents:
Bidders (3)
E
Engineer's Estimate
$22,738,147.47
$25,690,813.00
Over/Under Est: 12.99% $2,952,665.53
$29,799,990.00
Over/Under Est: 31.06% $7,061,842.53
Amt Left: 15.99% $4,109,177.00
Over/Under Est: 99.04% $22,519,332.67
Amt Left: 76.16% $19,566,667.14
Delta: -51.87% -$15,457,490.14
Subcontractor Percentage Amount
ARTEX ELECTRIC, INC. 9.69% $2,906,058.10
DEERWOOD CONSTRUCTION, INC. 3.31% $992,678.26
BARRICADES UNLIMITED 2.96% $887,712.28
TRP CONSTRUCTION GROUP, LLC 2.67% $800,740.47
DUSTROL, INC. 1.02% $305,900.85
WEST INFRASTRUCTURE CONSTRUCTION, LLC 0.83% $248,919.32
MKS CONSTRUCTION, LLC 0.83% $248,919.32
BUILT BY DESIGN TEXAS LLC 0.75% $224,927.10
TEXAS HEAVY INDUSTRIAL CONSTRUCTION COMPANY LLC 0.67% $200,934.87
INDUSTRIAL FABRICS, INC. 0.67% $200,934.87
VIGO CONSTRUCTION GROUP, INC. 0.67% $200,934.87
COBB, FENDLEY & ASSOCIATES, INC. 0.66% $197,935.85
FIBERTEX, LLC 0.49% $146,952.37
DK CONTRACTING, LLC 0.42% $125,959.17
JUAN & SON CONTRACTING LLC 0.35% $104,965.98
FIBERTEX, LLC 0.06% $17,994.17
MAKO MIX ENTERPRISE, LLC 0.03% $8,997.08
EAST TEXAS R & D SERVICES, INC. 0.03% $8,997.08
UTILITY CONTRACTORS OF AMERICA, INC. 0.02% $5,998.06
KING GEORGE TRAFFIC SOLUTIONS LLC 0.01% $2,999.03
LMN TRANSPORT 0.00% $0.00
Total: 26.14% $7,839,459.10

Bid Items & Bid Tabulations

219 Total 0 of 219
LUBBOCK  |  US 62  |  LUBBOCK  |  0130-05-085  |  02/04/2022  |  $22,738,147.47  |  C 130-5-85  |  SURF/ROADWAY RESTOR  |  656 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
SACYR CONSTRUCTION USA LLC
WEBBER, LLC
JOHNSON BROS. CORPORATION, A SOUTHLAND COMPANY
PREPARING ROW
STA 86.300 $2,000.000 $6,900.000 $33,500.000 $49,000.000
REMOVING CONC (PAV)
SY 377.000 $12.000 $15.000 $30.000 $25.000
REMOVING CONC (MEDIANS)
SY 457.000 $13.000 $12.000 $30.000 $22.000
REMOVING CONC (DRIVEWAYS)
SY 348.000 $31.000 $12.000 $30.000 $35.000
REMOVING CONC (CURB AND GUTTER)
LF 1,138.000 $6.000 $10.000 $10.000 $20.000
RMV STAB BS & ASPH PAV(11.5"-22")
SY 83,403.000 $10.000 $13.000 $6.250 $30.000
EXCAVATION (ROADWAY)
CY 607.000 $7.000 $25.000 $24.000 $30.000
EMBANKMENT (FINAL)(DENS CONT)(TY C)
CY 7,912.000 $7.000 $40.000 $24.000 $70.000
COMPOST MANUF TOPSOIL (4")
SY 9,120.000 $1.000 $2.500 $4.000 $5.000
BLOCK SODDING
SY 9,120.000 $3.000 $5.500 $7.000 $4.000
DRILL SEED (TEMP)(WARM OR COOL)
SY 9,120.000 $0.100 $0.500 $1.000 $0.200
VEGETATIVE WATERING
MG 626.000 $10.000 $105.000 $40.000 $7.000
PROOF ROLLING
HR 27.000 $126.000 $140.000 $285.000 $75.000
FOG SEAL (CSS-1H)
GAL 11,590.000 $5.000 $10.000 $7.000 $5.000
STONE-MTRX-ASPH SMA-D SAC-A PG70-28
TON 16,124.000 $155.000 $125.000 $200.000 $250.000
PLANE ASPH CONC PAV(0" TO 8")
SY 69,909.000 $7.000 $6.000 $3.800 $4.000
CONC PVMT (CONT REINF - CRCP) (10")
SY 4,679.000 $100.000 $150.000 $109.000 $90.000
CONC PVMT(CRCP)(TRANSITION SLAB)
SY 398.000 $134.000 $120.000 $124.000 $225.000
CEM STABIL BKFL
CY 8,240.000 $130.000 $90.000 $125.000 $275.000
CUT & RESTORE CONC PAVING
SY 38.000 $261.000 $250.000 $175.000 $300.000
CUT & RESTORE ASPH PAVING
SY 96.000 $72.000 $150.000 $175.000 $250.000
TRENCH EXCAVATION PROTECTION
LF 11,691.000 $6.000 $10.000 $2.500 $1.000
DRILL SHAFT (RDWY ILL POLE) (30 IN)
LF 2,509.000 $220.000 $160.000 $152.000 $278.000
DRILL SHAFT (TRF SIG POLE) (24 IN)
LF 162.000 $143.000 $160.000 $152.000 $278.000
DRILL SHAFT (TRF SIG POLE) (36 IN)
LF 402.000 $350.000 $400.000 $354.000 $295.000
DRILL SHAFT (TRF SIG POLE) (48 IN)
LF 50.000 $391.000 $500.000 $500.000 $425.000
RAIL (HANDRAIL)(TY B)
LF 71.000 $78.000 $150.000 $250.000 $175.000
RC PIPE (CL III)(18 IN)
LF 340.000 $64.000 $105.000 $110.000 $150.000
RC PIPE (CL III)(24 IN)
LF 7,330.000 $100.000 $120.000 $130.000 $265.000
RC PIPE (CL III)(30 IN)
LF 3,479.000 $120.000 $150.000 $200.000 $410.000
RC PIPE (CL III)(36 IN)
LF 20.000 $117.000 $350.000 $250.000 $425.000
MANH (COMPL)(PRM)(48IN)
EA 11.000 $4,957.000 $5,500.000 $5,550.000 $7,500.000
MANH (COMPL)(PRM)(60IN)
EA 1.000 $5,640.000 $10,500.000 $9,800.000 $12,500.000
MANH (COMPL)(PRM)(72IN)
EA 1.000 $7,600.000 $12,000.000 $10,366.000 $20,000.000
JCTBOX(COMPL)(PJB)(3FTX3FT)
EA 9.000 $5,075.000 $4,500.000 $5,300.000 $7,500.000
JCTBOX(COMPL)(PJB)(4FTX4FT)
EA 1.000 $5,433.000 $6,000.000 $5,600.000 $15,000.000
JCTBOX(COMPL)(PJB)(5FTX5FT)
EA 1.000 $7,866.000 $10,000.000 $7,700.000 $12,000.000
INLET (COMPL)(PCO)(3FT)(NONE)
EA 11.000 $4,263.000 $4,000.000 $5,300.000 $9,000.000
INLET (COMPL)(PCO)(3FT)(LEFT)
EA 32.000 $5,000.000 $4,500.000 $5,600.000 $8,000.000
INLET (COMPL)(PCO)(3FT)(RIGHT)
EA 27.000 $5,000.000 $4,500.000 $5,600.000 $8,000.000
INLET (COMPL)(PCO)(3FT)(BOTH)
EA 13.000 $4,388.000 $4,500.000 $6,550.000 $9,000.000
INLET (COMPL)(PCU)(3FT)(RIGHT)
EA 3.000 $4,716.000 $6,500.000 $6,550.000 $10,000.000
INLET (COMPL)(PSL)(RC)(4FTX4FT)
EA 1.000 $5,678.000 $6,000.000 $7,200.000 $11,000.000
INLET(COMPL)(PSL)(SFG)(3FTX3FT-3FTX3FT)
EA 7.000 $5,200.000 $6,000.000 $7,700.000 $7,500.000
ADJUSTING MANHOLES
EA 7.000 $350.000 $1,000.000 $2,000.000 $1,750.000
ADJUSTING MANHOLES (WATER VALVE BOX)
EA 44.000 $349.000 $350.000 $650.000 $1,250.000
ADJUSTING MANHOLES (ELECTRIC BOX)
EA 86.000 $950.000 $1,000.000 $750.000 $1,100.000
CLEAN EXIST CULVERTS
EA 10.000 $2,323.000 $2,500.000 $2,000.000 $4,500.000
REMOV STR (INLET)
EA 1.000 $547.000 $5,000.000 $990.000 $700.000
MOBILIZATION
LS 1.000 $1,962,598.630 $2,406,960.110 $2,900,000.000 $4,400,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 36.000 $20,000.000 $3,640.000 $26,600.000 $50,000.000
CONSTRUCTION EXITS (INSTALL) (TY 1)
SY 702.000 $25.000 $75.000 $35.000 $45.000
CONSTRUCTION EXITS (REMOVE)
SY 702.000 $7.000 $9.000 $10.000 $6.000
SANDBAGS FOR EROSION CONTROL
EA 560.000 $12.000 $8.000 $7.000 $12.000
TEMP SEDMT CONT FENCE (INSTALL)
LF 8,175.000 $3.000 $6.000 $3.000 $3.000
TEMP SEDMT CONT FENCE (REMOVE)
LF 8,175.000 $1.000 $1.000 $1.000 $1.000
PORT CTB (FUR & INST)(LOW PROF)(TY 1)
LF 8,140.000 $70.000 $45.000 $20.000 $75.000
PORT CTB (FUR & INST)(LOW PROF)(TY 2)
LF 1,760.000 $70.000 $50.000 $20.000 $75.000
PORT CTB (MOVE)(LOW PROF)(TY 1)
LF 3,940.000 $7.000 $15.000 $19.000 $12.500
PORT CTB (MOVE)(LOW PROF)(TY 2)
LF 1,140.000 $10.000 $15.000 $19.000 $12.500
PORT CTB (REMOVE)(LOW PROF)(TY 1)
LF 8,140.000 $10.000 $10.000 $10.000 $50.000
PORT CTB (REMOVE)(LOW PROF)(TY 2)
LF 1,760.000 $9.000 $10.000 $10.000 $50.000
LANDSCAPE PAVERS
SY 3,077.000 $65.000 $65.000 $70.000 $175.000
COLORED TEXTURED CONC (5")
SY 16,972.000 $60.000 $70.000 $65.000 $80.000
CONC CURB & GUTTER (TY II)
LF 12,331.000 $30.000 $21.000 $36.250 $20.000
CONC CURB & GUTTER (VALLEY GUTTER)
LF 1,625.000 $37.000 $30.000 $37.250 $37.000
DRIVEWAYS (CONC)
SY 4,830.000 $100.000 $80.000 $120.000 $75.000
CONC SIDEWALKS (5")
SY 193.000 $62.000 $60.000 $88.000 $60.000
CURB RAMPS (TY 1)
SY 1,076.000 $133.000 $125.000 $132.000 $128.000
CURB RAMPS (TY 2)
SY 188.000 $150.000 $125.000 $115.000 $136.000
CURB RAMPS (TY 5)
SY 33.000 $154.000 $150.000 $183.000 $137.000
CURB RAMPS (TY 7)
SY 23.000 $152.000 $225.000 $189.000 $147.000
CURB RAMPS (TY 10)
SY 52.000 $320.000 $125.000 $170.000 $137.000
CURB RAMPS (TY 21)
SY 42.000 $150.000 $150.000 $134.000 $150.000
CONC MEDIAN
SY 2,068.000 $85.000 $70.000 $67.250 $57.000
RELOCATE RD IL ASM (SHOE-BASE)
EA 1.000 $350.000 $1,600.000 $2,000.000 $3,500.000
REMOVE RD IL ASM (SHOE-BASE)
EA 78.000 $446.000 $550.000 $505.000 $375.000
IN RD IL (TY SA) 50T-12 (400W EQ) LED
EA 192.000 $4,000.000 $3,800.000 $3,750.000 $4,000.000
CONDT (PVC) (SCH 40) (2")
LF 34,483.000 $12.000 $8.000 $8.000 $9.000
CONDT (PVC) (SCH 40) (2") (BORE)
LF 14,456.000 $20.000 $14.500 $14.100 $15.000
CONDT (PVC) (SCH 80) (2")
LF 1,277.000 $12.000 $10.000 $10.000 $11.000
CONDT (PVC) (SCH 80) (2") (BORE)
LF 110.000 $22.000 $16.500 $16.400 $17.000
CONDT (PVC) (SCH 80) (4")
LF 153.000 $21.000 $20.000 $19.700 $21.000
CONDT (PVC) (SCH 80) (4") (BORE)
LF 2,059.000 $27.000 $31.000 $30.250 $32.000
ELEC CONDR (NO.8) BARE
LF 35,297.000 $2.000 $1.100 $1.050 $1.000
ELEC CONDR (NO.8) INSULATED
LF 67,594.000 $1.750 $1.200 $1.100 $1.250
ELEC CONDR (NO.4) BARE
LF 3,599.000 $2.000 $2.100 $2.000 $2.100
ELEC CONDR (NO.4) INSULATED
LF 1,724.000 $4.000 $2.500 $2.250 $2.500
GROUND BOX TY A (122311)
EA 204.000 $750.000 $650.000 $610.000 $628.000
GROUND BOX TY A (122311)W/APRON
EA 17.000 $824.000 $800.000 $775.000 $785.000
GROUND BOX TY D (162922)W/APRON
EA 43.000 $974.000 $900.000 $900.000 $890.000
ELC SRV TY A 240/480 060(NS)SS(E)EX(O)
EA 3.000 $9,000.000 $5,100.000 $5,050.000 $5,235.000
ELC SRV TY A 240/480 060(NS)SS(T)TP(O)
EA 1.000 $5,721.000 $5,800.000 $5,550.000 $5,775.000
ALUMINUM SIGNS (TY A)
SF 267.000 $26.000 $40.000 $30.000 $38.000
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
EA 119.000 $750.000 $950.000 $1,000.000 $650.000
IN SM RD SN SUP&AM TYS80(1)SA(P)
EA 4.000 $649.000 $1,250.000 $1,400.000 $775.000
REMOVE SM RD SN SUP&AM
EA 111.000 $114.000 $100.000 $75.000 $105.000
REMOVE SM RD SN SUP&AM (SIGN ONLY)
EA 25.000 $130.000 $150.000 $45.000 $220.000
WK ZN PAV MRK NON-REMOV (W)4"(BRK)
LF 20,418.000 $0.170 $0.250 $0.250 $0.260
WK ZN PAV MRK NON-REMOV (W)4"(SLD)
LF 79,840.000 $0.150 $0.250 $0.250 $0.260
WK ZN PAV MRK NON-REMOV (W)8"(DOT)
LF 342.000 $1.000 $1.000 $1.000 $1.000
WK ZN PAV MRK NON-REMOV (W)8"(SLD)
LF 7,592.000 $0.250 $0.500 $0.500 $0.500
WK ZN PAV MRK NON-REMOV (W)12"(SLD)
LF 720.000 $1.000 $2.000 $2.000 $2.000
WK ZN PAV MRK NON-REMOV (W)24"(SLD)
LF 1,378.000 $3.000 $4.000 $4.000 $4.000
WK ZN PAV MRK NON-REMOV (W)(ARROW)
EA 30.000 $95.000 $65.000 $65.000 $66.000
WK ZN PAV MRK NON-REMOV (W)(DBL ARW)
EA 2.000 $112.000 $100.000 $100.000 $110.000
WK ZN PAV MRK NON-REMOV (Y)4"(SLD)
LF 119,754.000 $0.150 $0.250 $0.250 $0.260
WK ZN PAV MRK REMOV (REFL) TY I-C
EA 624.000 $4.000 $5.000 $5.000 $5.000
WK ZN PAV MRK REMOV (REFL) TY II-A-A
EA 508.000 $4.000 $5.000 $5.000 $5.000
WK ZN PAV MRK REMOV (TRAF BTN) TY W
EA 1,170.000 $3.000 $2.500 $2.500 $3.000
WK ZN PAV MRK REMOV (TRAF BTN) TY Y
EA 1,524.000 $3.000 $2.500 $2.500 $3.000
WK ZN PAV MRK REMOV (W)4"(BRK)
LF 1,810.000 $1.000 $1.500 $1.500 $2.000
WK ZN PAV MRK REMOV (W)4"(SLD)
LF 9,192.000 $0.820 $0.900 $0.900 $1.000
WK ZN PAV MRK REMOV (W)8"(SLD)
LF 6,234.000 $2.000 $1.800 $2.000 $2.000
WK ZN PAV MRK REMOV (W)24"(SLD)
LF 150.000 $7.000 $20.000 $20.000 $20.000
WK ZN PAV MRK REMOV (W)(ARROW)
EA 36.000 $180.000 $600.000 $600.000 $610.000
WK ZN PAV MRK REMOV (W)(DBL ARROW)
EA 4.000 $277.000 $1,200.000 $1,200.000 $1,215.000
WK ZN PAV MRK REMOV (Y)4"(SLD)
LF 6,412.000 $0.850 $0.900 $0.900 $1.000
WK ZN PAV MRK SHT TERM (TAB)TY W
EA 10,772.000 $1.000 $0.900 $1.000 $2.000
WK ZN PAV MRK SHT TERM (TAB)TY Y-2
EA 2,394.000 $1.000 $0.970 $1.000 $0.750
REFL PAV MRK TY II (W) 4" (SLD)
LF 1,977.000 $0.250 $0.250 $0.250 $0.260
REFL PAV MRK TY II (W) 6" (BRK)
LF 13,553.000 $0.250 $0.300 $0.300 $0.310
REFL PAV MRK TY II (Y) 4" (BRK)
LF 2,082.000 $1.000 $0.250 $0.250 $0.260
REFL PAV MRK TY II (Y) 4" (SLD)
LF 13,680.000 $0.200 $0.250 $0.250 $0.260
REFL PAV MRK TY II (Y) (MED NOSE)
EA 27.000 $208.000 $250.000 $250.000 $255.000
PAVEMENT SEALER 4"
LF 17,739.000 $0.120 $0.300 $0.300 $0.350
PAVEMENT SEALER (MED NOSE)
EA 22.000 $222.000 $250.000 $250.000 $255.000
RE PM W/RET REQ TY I (W)4"(SLD)(100MIL)
LF 1,977.000 $0.480 $0.750 $0.750 $1.000
RE PM W/RET REQ TY I (W)6"(BRK)(100MIL)
LF 13,553.000 $1.000 $1.250 $1.250 $1.250
RE PM W/RET REQ TY I (Y)4"(BRK)(100MIL)
LF 2,082.000 $1.000 $0.750 $0.750 $1.000
RE PM W/RET REQ TY I (Y)4"(SLD)(100MIL)
LF 13,680.000 $0.480 $0.750 $0.750 $1.000
PREFAB PAV MRK TY B (W)(8")(DOT)
LF 110.000 $7.000 $10.000 $10.000 $10.000
PREFAB PAV MRK TY B (W)(8")(SLD)
LF 3,395.000 $7.000 $9.000 $9.000 $10.000
PREFAB PAV MRK TY B (W)(12")(SLD)
LF 48.000 $9.000 $15.000 $15.000 $15.000
PREFAB PAV MRK TY B (W)(24")(SLD)
LF 2,023.000 $18.000 $30.000 $30.000 $31.000
PREFAB PAV MRK TY B (W)(36")(YLD TRI)
EA 4.000 $47.000 $100.000 $100.000 $102.000
PREFAB PAV MRK TY C (W) (8") (DOT)
LF 1,364.000 $1.000 $6.000 $6.000 $6.000
PREFAB PAV MRK TY C (W) (8") (SLD)
LF 3,594.000 $3.000 $5.000 $5.000 $5.000
PREFAB PAV MRK TY C (W) (18") (SLD)
LF 104.000 $12.000 $12.000 $12.000 $12.000
PREFAB PAV MRK TY C (W) (24") (SLD)
LF 3,531.000 $18.000 $14.500 $14.500 $15.000
PREFAB PAV MRK TY C (W) (ARROW)
EA 68.000 $262.000 $275.000 $275.000 $300.000
PREFAB PAV MRK TY C (W) (DBL ARROW)
EA 4.000 $322.000 $750.000 $750.000 $760.000
PREFAB PAV MRK TY C (Y) (12") (SLD)
LF 167.000 $7.000 $8.000 $8.000 $8.000
PREFAB PAV MRK TY C (Y) (24") (SLD)
LF 87.000 $12.000 $20.000 $20.000 $20.000
PREFAB PAV MRK TY B (W)(ARROW)CNTST
EA 30.000 $1,860.000 $4,100.000 $4,100.000 $4,250.000
PREFAB PAV MRK TY B (W)(DBL ARRW)CNTST
EA 1.000 $750.000 $6,800.000 $6,800.000 $7,000.000
ELIM EXT PAV MRK & MRKS (4")
LF 21,016.000 $0.830 $0.850 $1.000 $1.000
ELIM EXT PAV MRK & MRKS (8")
LF 2,238.000 $2.000 $1.690 $2.000 $2.000
ELIM EXT PAV MRK & MRKS (24")
LF 94.000 $3.000 $5.060 $5.050 $5.000
ELIM EXT PAV MRK & MRKS (ARROW)
EA 13.000 $127.000 $75.000 $75.000 $76.000
ELIM EXT PAV MRK & MRKS (DBL ARROW)
EA 6.000 $123.000 $125.000 $125.000 $130.000
PAV SURF PREP FOR MRK (4")
LF 17,739.000 $1.000 $0.200 $0.200 $0.250
PAV SURF PREP FOR MRK (6")
LF 13,553.000 $1.000 $0.300 $0.300 $0.350
PAV SURF PREP FOR MRK (8")
LF 8,463.000 $0.100 $0.400 $0.400 $0.450
PAV SURF PREP FOR MRK (12")
LF 48.000 $1.000 $1.000 $1.000 $1.000
PAV SURF PREP FOR MRK (18")
LF 104.000 $0.480 $2.000 $2.000 $2.000
PAV SURF PREP FOR MRK (24")
LF 5,641.000 $1.000 $2.500 $2.500 $3.000
PAV SURF PREP FOR MRK (ARROW)
EA 98.000 $63.000 $50.000 $50.000 $51.000
PAV SURF PREP FOR MRK (DBL ARROW)
EA 5.000 $18.000 $100.000 $100.000 $102.000
PAV SURF PREP FOR MRK (36")(YLD TRI)
EA 4.000 $6.000 $50.000 $50.000 $51.000
PAV SURF PREP FOR MRK (MED NOSE)
EA 27.000 $263.000 $250.000 $250.000 $253.000
INSTALL HWY TRF SIG (ISOLATED)
EA 8.000 $30,000.000 $11,000.000 $10,100.000 $21,000.000
VEH SIG SEC (12")LED(GRN)
EA 60.000 $234.000 $230.000 $225.000 $260.000
VEH SIG SEC (12")LED(GRN ARW)
EA 20.000 $243.000 $230.000 $225.000 $3.000
VEH SIG SEC (12")LED(YEL)
EA 64.000 $237.000 $230.000 $225.000 $236.000
VEH SIG SEC (12")LED(YEL ARW)
EA 33.000 $238.000 $230.000 $225.000 $236.000
VEH SIG SEC (12")LED(RED)
EA 69.000 $237.000 $230.000 $225.000 $236.000
VEH SIG SEC (12")LED(RED ARW)
EA 15.000 $224.000 $230.000 $225.000 $236.000
PED SIG SEC (LED)(COUNTDOWN)
EA 50.000 $598.000 $508.000 $505.000 $525.000
BACKPLATE W/REF BRDR(3 SEC)(VENT)ALUM
EA 61.000 $143.000 $102.000 $101.000 $105.000
BACKPLATE W/REF BRDR(4 SEC)(VENT)ALUM
EA 17.000 $159.000 $107.000 $106.000 $110.000
BACKPLATE W/REF BRDR(5 SEC)(VENT)ALUM
EA 2.000 $186.000 $127.000 $126.000 $131.000
TRF SIG CBL (TY A)(14 AWG)(7 CONDR)
LF 4,644.000 $3.000 $5.500 $5.300 $5.500
TRF SIG CBL (TY A)(14 AWG)(20 CONDR)
LF 3,235.000 $6.000 $7.500 $7.300 $8.000
INS TRF SIG PL AM (S)1 ARM(20')
EA 1.000 $6,200.000 $8,200.000 $8,100.000 $8,500.000
INS TRF SIG PL AM (S)1 ARM(24')
EA 3.000 $8,207.000 $8,350.000 $8,300.000 $8,600.000
INS TRF SIG PL AM (S)1 ARM(28')
EA 3.000 $7,650.000 $8,550.000 $8,500.000 $8,800.000
INS TRF SIG PL AM(S)1 ARM(32')
EA 4.000 $8,120.000 $9,150.000 $9,100.000 $9,500.000
INS TRF SIG PL AM(S)1 ARM(36')
EA 4.000 $8,885.000 $9,450.000 $9,400.000 $10,000.000
INS TRF SIG PL AM(S)1 ARM(40')
EA 11.000 $10,000.000 $11,675.000 $11,700.000 $12,000.000
INS TRF SIG PL AM(S)1 ARM(44')
EA 1.000 $12,229.000 $12,200.000 $12,200.000 $13,000.000
INS TRF SIG PL AM(S)1 ARM(50')
EA 1.000 $22,714.000 $27,450.000 $27,500.000 $30,000.000
INS TRF SIG PL AM(S)1 ARM(55')
EA 1.000 $24,023.000 $28,450.000 $28,500.000 $30,000.000
PED POLE ASSEMBLY
EA 21.000 $1,954.000 $1,525.000 $1,520.000 $1,600.000
PED DETECT PUSH BUTTON (APS)
EA 50.000 $789.000 $865.000 $875.000 $900.000
INSTALL OF FND FOR GROUND MNT CABINETS
EA 7.000 $2,020.000 $1,525.000 $1,520.000 $1,600.000
LITTER REMOVAL
CYC 1.000 $1,528.000 $3,000.000 $3,795.000 $1,800.000
CLEANING / SWEEPING (OUTSIDE MAIN LANE)
CYC 1.000 $1,323.000 $1,120.000 $2,825.000 $25,000.000
D-GR HMA TY-B PG70-28
TON 25,937.000 $100.000 $115.000 $136.000 $180.000
D-GR HMA TY-C SAC-B PG70-28
TON 772.000 $100.000 $130.000 $265.000 $280.000
D-GR HMA TY-D PG70-28
TON 4,059.000 $110.000 $125.000 $170.000 $175.000
TACK COAT
GAL 23,495.000 $3.000 $8.000 $5.500 $5.000
RETROFIT DET WARN SURF(SURF APP OR CIP)
EA 2.000 $121.000 $200.000 $1,000.000 $800.000
PORTABLE CHANGEABLE MESSAGE SIGN
DAY 1,640.000 $40.000 $56.000 $75.000 $50.000
TMSP RADAR SPEED CONTROL MONITOR
EA 2.000 $12,500.000 $11,000.000 $8,500.000 $50,000.000
TMA (STATIONARY)
DAY 1,640.000 $165.000 $236.000 $65.000 $300.000
TMA (MOBILE OPERATION)
DAY 250.000 $150.000 $1,000.000 $100.000 $250.000
CURB INLET SEDIMENT PROTECTION
LF 9,900.000 $7.000 $20.000 $15.000 $5.000
FURNISH AND INSTALL FIRE HYDRANT
EA 15.000 $3,250.000 $5,500.000 $4,500.000 $7,500.000
MOBILIZATION FOR UTILITIES
LS 1.000 $33,826.710 $105,000.000 $124,000.000 $40,000.000
TRENCH SAFETY
LF 10,353.000 $1.000 $10.000 $2.200 $1.000
SAWCUT AND REMOVAL OF EXIST ASPH PAV
SY 120.000 $82.500 $14.000 $50.000 $25.000
FLOWABLE BACKFILL
CY 863.000 $120.970 $95.000 $126.000 $150.000
FURNISH & INSTALL 6" C-900 DR-18
LF 1,061.000 $25.000 $100.000 $100.000 $150.000
FURNISH & INSTALL 8" C-900 DR-18
LF 1,937.000 $45.000 $125.000 $125.000 $200.000
FURNISH & INSTALL 10" C-900 DR-18
LF 444.000 $60.000 $140.000 $150.000 $250.000
FURNISH & INSTALL 12" C-900 DR-18
LF 6,911.000 $70.000 $175.000 $175.000 $400.000
FURNISH & INSTALL 10"X8" TAPPING SLEEVE
EA 1.000 $6,200.000 $8,000.000 $4,000.000 $15,000.000
FURNISH & INSTALL 6" GATE VALVE
EA 24.000 $1,500.000 $1,500.000 $1,500.000 $2,500.000
FURNISH & INSTALL 8" GATE VALVE
EA 23.000 $2,000.000 $2,000.000 $2,220.000 $3,250.000
FURNISH & INSTALL 10" GATE VALVE
EA 3.000 $3,000.000 $2,500.000 $3,130.000 $5,000.000
FURNISH & INSTALL 12" GATE VALVE
EA 23.000 $3,500.000 $3,500.000 $3,740.000 $6,000.000
TIE PROPOSED TO EXISTING WATER LINE
EA 38.000 $500.000 $3,500.000 $4,000.000 $3,250.000
RELOCATE WTR SERV TAP TO NEW WTR LINE
EA 4.000 $500.000 $4,500.000 $5,000.000 $7,250.000
ABANDON AND REMOVE EXISTING WATER LINE
EA 9,486.000 $10.000 $60.000 $27.000 $65.000
ABANDON AND REMOVE EXISTING SEWER LINE
EA 309.000 $20.000 $400.000 $27.000 $65.000
ABANDON AND REMOVE EXIST SEWER MANHOLE
EA 1.000 $2,500.000 $4,000.000 $4,000.000 $2,500.000
RELOCATE SWR SERV TAP TO MAINT ENTRANCE
EA 1.000 $500.000 $2,500.000 $3,500.000 $5,000.000
FURNISH & INSTALL 60" FIBERGLASS MANHOL
EA 1.000 $15,500.000 $15,000.000 $20,000.000 $55,000.000
Totals: $22,738,151.790 $25,690,813.000 $29,799,990.000 $45,257,480.140