|
|
PREPARING ROW
|
STA
|
65.000
|
$2,500.000
|
$40,060.000
|
$1,000.000
|
|
|
REMOV CONC (PAV)
|
SY
|
1,733.000
|
$20.000
|
$14.800
|
$20.000
|
|
|
REMOV CONC (CURB & GUTTER)
|
LF
|
2,859.000
|
$9.000
|
$9.600
|
$4.060
|
|
|
REMOV CONC (SAWCUT)
|
LF
|
38.000
|
$25.000
|
$55.500
|
$75.000
|
|
|
REMOV CONC (MSE PANELS)
|
SF
|
4,986.000
|
$20.000
|
$34.250
|
$10.000
|
|
|
RMV (6") TRT/UNTRT BASE & ASPH PAV
|
SY
|
25,794.000
|
$5.110
|
$4.950
|
$10.000
|
|
|
EXCAV (ROADWAY)
|
CY
|
1,545.490
|
$10.450
|
$16.600
|
$10.000
|
|
|
EMBANK (FNL)(DC)(TY C)
|
CY
|
64,487.178
|
$15.000
|
$17.600
|
$34.250
|
|
|
BACKFILL (TY A)
|
STA
|
65.000
|
$167.000
|
$740.000
|
$200.000
|
|
|
DRILL SEED (PERM_RURAL_SAND)
|
SY
|
138,463.000
|
$0.500
|
$0.200
|
$0.250
|
|
|
VEGETATIVE WATERING
|
TGL
|
58.000
|
$30.000
|
$500.000
|
$46.350
|
|
|
PROOF ROLLING
|
HR
|
50.000
|
$150.000
|
$290.000
|
$259.700
|
|
|
FL BS (CMP IN PLC)(TY A GR 4) (6")
|
SY
|
39,450.000
|
$16.000
|
$23.000
|
$20.000
|
|
|
REWORK BS MTL (TY B)(6")(DENS CONT)
|
SY
|
5,751.000
|
$4.000
|
$12.400
|
$10.000
|
|
|
PRIME COAT (MC-30)
|
GAL
|
10,226.000
|
$6.250
|
$5.250
|
$6.000
|
|
|
EMULS ASPH (EROSN CONT)(CSS-1H)
|
GAL
|
18,000.000
|
$4.750
|
$5.050
|
$4.000
|
|
|
FOG SEAL (CSS-1H)
|
GAL
|
7,465.000
|
$5.250
|
$5.050
|
$4.500
|
|
|
ASPH (AC-20-5TR)
|
GAL
|
12,109.000
|
$4.200
|
$12.000
|
$6.000
|
|
|
AGGR (TY-PB, GR-4)(SAC-B)
|
CY
|
303.000
|
$135.000
|
$300.000
|
$350.000
|
|
|
TACK COAT
|
GAL
|
13,372.000
|
$5.500
|
$2.850
|
$6.000
|
|
|
D-GR HMA TY-B SAC-B PG70-28
|
TON
|
16,476.000
|
$130.000
|
$192.000
|
$250.000
|
|
|
STONE-MTRX-ASPH SMA-D SAC-A PG76-28
|
TON
|
11,058.000
|
$160.000
|
$220.000
|
$300.000
|
|
|
TACK COAT
|
GAL
|
4,488.000
|
$5.500
|
$2.950
|
$4.750
|
|
|
FLEXIBLE PAVEMENT STRUCTURE REPAIR(3")
|
SY
|
1,000.000
|
$35.000
|
$100.000
|
$72.400
|
|
|
FLEXIBLE PAVEMENT STRUCTURE REPAIR(6")
|
SY
|
500.000
|
$60.000
|
$200.000
|
$77.400
|
|
|
PLANE ASPH CONC PAV(6")
|
SY
|
20,854.000
|
$4.500
|
$5.000
|
$4.060
|
|
|
PLANE ASPH CONC PAV (6" TO 30")
|
SY
|
4,895.000
|
$18.000
|
$14.800
|
$6.650
|
|
|
CEM STABIL BKFL
|
CY
|
284.500
|
$275.000
|
$188.000
|
$256.760
|
|
|
TRENCH EXCAVATION PROTECTION
|
LF
|
148.000
|
$20.000
|
$26.900
|
$15.000
|
|
|
DRILL SHAFT (42 IN)
|
LF
|
24.000
|
$600.000
|
$400.000
|
$645.120
|
|
|
DRILL SHAFT (SIGN MTS) (24 IN)
|
LF
|
32.000
|
$450.000
|
$150.000
|
$445.000
|
|
|
DRILL SHAFT (RDWY ILL POLE) (30 IN)
|
LF
|
160.000
|
$480.000
|
$293.000
|
$471.000
|
|
|
CL A CONC (MISC)
|
CY
|
1.400
|
$1,500.000
|
$2,930.000
|
$2,500.000
|
|
|
CL C CONC (ABUT)
|
CY
|
41.000
|
$1,400.000
|
$2,350.000
|
$2,000.000
|
|
|
CL C CONC (RAIL FOUNDATION)
|
CY
|
135.000
|
$670.000
|
$744.000
|
$1,000.000
|
|
|
CL C CONC (MISC)
|
CY
|
1.500
|
$1,400.000
|
$16,820.000
|
$2,000.000
|
|
|
REINF CONC SLAB
|
SF
|
22,480.000
|
$33.000
|
$29.000
|
$29.900
|
|
|
APPROACH SLAB
|
CY
|
240.800
|
$790.000
|
$642.000
|
$1,000.060
|
|
|
RETAINING WALL (MSE)
|
SF
|
34,887.000
|
$70.000
|
$89.000
|
$110.000
|
|
|
COPING (SPECIAL)
|
LF
|
364.000
|
$100.000
|
$202.000
|
$90.000
|
|
|
PRESTR CONC GIRDER (TX46)
|
LF
|
2,794.400
|
$260.000
|
$153.000
|
$300.000
|
|
|
SILICONE RESIN PAINT FINISH
|
SF
|
185.000
|
$25.000
|
$7.900
|
$7.900
|
|
|
RIPRAP (CONC)(4 IN)
|
CY
|
1,191.000
|
$670.000
|
$639.000
|
$587.250
|
|
|
RIPRAP (CONC)(5 IN)
|
CY
|
10.000
|
$680.000
|
$750.000
|
$700.000
|
|
|
RAIL (TY SSTR)
|
LF
|
5,469.000
|
$90.000
|
$51.500
|
$112.980
|
|
|
SEALED EXPANSION JOINT (4 IN) (SEJ - M)
|
LF
|
174.000
|
$260.000
|
$260.000
|
$225.020
|
|
|
CONC BOX CULV (3 FT X 2 FT)
|
LF
|
180.000
|
$400.000
|
$264.000
|
$431.750
|
|
|
CONC BOX CULV (6 FT X 3 FT)
|
LF
|
204.000
|
$700.000
|
$488.000
|
$706.750
|
|
|
RC PIPE (CL III)(24 IN)
|
LF
|
52.000
|
$200.000
|
$361.000
|
$256.750
|
|
|
INLET (COMPL)(TY S)
|
EA
|
2.000
|
$3,000.000
|
$9,360.000
|
$7,088.950
|
|
|
INLET (COMP)(TY C)
|
EA
|
2.000
|
$8,000.000
|
$9,160.000
|
$8,477.950
|
|
|
INLET (COMPL)(TY BB)
|
EA
|
1.000
|
$8,000.000
|
$2,532.240
|
$5,327.950
|
|
|
SET (TY I)(S= 3 FT)(HW= 3 FT)(6:1)(C)
|
EA
|
2.000
|
$19,500.000
|
$13,540.000
|
$8,477.950
|
|
|
SET (TY I)(S= 6 FT)(HW= 4 FT)(6:1)(C)
|
EA
|
2.000
|
$22,500.000
|
$22,600.000
|
$8,977.950
|
|
|
SET (TY II) (24 IN) (RCP) (6: 1) (P)
|
EA
|
5.000
|
$3,000.000
|
$4,330.000
|
$6,377.950
|
|
|
CLEAN EXIST CULVERTS
|
EA
|
21.000
|
$3,000.000
|
$6,650.000
|
$4,977.950
|
|
|
REMOV STR (PIPE)
|
EA
|
4.000
|
$2,000.000
|
$5,540.000
|
$4,977.950
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$1,697,000.000
|
$2,603,900.000
|
$2,680,000.000
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
19.000
|
$17,500.000
|
$136,575.000
|
$85,000.000
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
DAY
|
2,308.000
|
$100.000
|
$58.000
|
$40.000
|
|
|
TMA (STATIONARY)
|
DAY
|
630.000
|
$200.000
|
$220.000
|
$350.000
|
|
|
TMA (MOBILE OPERATION)
|
DAY
|
108.000
|
$250.000
|
$220.000
|
$350.000
|
|
|
CONSTRUCTION EXITS (INSTALL) (TY 1)
|
SY
|
650.000
|
$35.000
|
$40.750
|
$40.000
|
|
|
CONSTRUCTION EXITS (REMOVE)
|
SY
|
650.000
|
$10.000
|
$13.100
|
$15.000
|
|
|
SANDBAGS FOR EROSION CONTROL
|
EA
|
360.000
|
$9.000
|
$25.100
|
$20.000
|
|
|
TEMP SEDMT CONT FENCE (INSTALL)
|
LF
|
200.000
|
$4.150
|
$5.500
|
$7.000
|
|
|
TEMP SEDMT CONT FENCE (REMOVE)
|
LF
|
100.000
|
$1.000
|
$1.100
|
$3.000
|
|
|
BIODEG EROSN CONT LOGS (INSTL) (18")
|
LF
|
4,480.000
|
$8.500
|
$9.100
|
$7.880
|
|
|
BIODEG EROSN CONT LOGS (REMOVE)
|
LF
|
2,240.000
|
$1.500
|
$1.100
|
$2.000
|
|
|
CONSTRUCTING DETOURS
|
SY
|
1,000.000
|
$100.000
|
$106.000
|
$78.000
|
|
|
PORT CTB (DES SOURCE)(F-SHAPE)(TY 1)
|
LF
|
3,950.000
|
$10.000
|
$11.700
|
$2.300
|
|
|
PORT CTB (MOVE)(F-SHAPE)(TY 1)
|
LF
|
13,940.000
|
$8.000
|
$7.400
|
$1.330
|
|
|
PORT CTB (STKPL)(F-SHAPE)(TY 1)
|
LF
|
8,190.000
|
$18.000
|
$9.300
|
$2.300
|
|
|
PERM CTB (SGL SLOPE) (TY 1) (42 )
|
LF
|
3,844.000
|
$100.000
|
$77.750
|
$140.000
|
|
|
CONC CURB & GUTTER (TY II)
|
LF
|
2,118.000
|
$41.000
|
$40.500
|
$39.750
|
|
|
CONC CURB (SLOTTED)
|
LF
|
40.000
|
$33.000
|
$24.000
|
$60.000
|
|
|
DRIVEWAYS (CONC)
|
SY
|
124.000
|
$170.000
|
$128.000
|
$150.000
|
|
|
DRIVEWAYS (ACP)
|
SY
|
2,845.800
|
$50.000
|
$86.500
|
$75.000
|
|
|
MILL RUMBLE STRIPS (ASPHALT) (SHLDR)
|
LF
|
28,446.000
|
$0.280
|
$0.450
|
$0.250
|
|
|
CRASH CUSH ATTEN (MOVE & RESET)
|
EA
|
4.000
|
$1,500.000
|
$2,500.000
|
$3,443.130
|
|
|
CRASH CUSH ATTEN (REMOVE)
|
EA
|
5.000
|
$1,100.000
|
$1,000.000
|
$3,443.130
|
|
|
CRASH CUSH ATTEN (INSTL)(R)(N)(TL3)
|
EA
|
2.000
|
$31,000.000
|
$33,500.000
|
$3,443.130
|
|
|
CRASH CUSH ATTEN (INSTL)(S)(N)(TL3)
|
EA
|
5.000
|
$8,727.120
|
$9,000.000
|
$3,443.130
|
|
|
MAILBOX INSTALL-S (TWW-POST) TY 4
|
EA
|
7.000
|
$325.000
|
$205.000
|
$220.000
|
|
|
MAILBOX INSTALL-D (TWW-POST) TY 4
|
EA
|
1.000
|
$330.000
|
$233.000
|
$220.000
|
|
|
REMOVE RD IL ASM (TRANS-BASE)
|
EA
|
2.000
|
$1,000.000
|
$1,320.000
|
$1,000.000
|
|
|
IN RD IL (U/P) (TY 1) (150W EQ) LED
|
EA
|
8.000
|
$1,900.000
|
$785.000
|
$1,374.000
|
|
|
IN RD IL (TY ST) 40T-12 (250W EQ) LED
|
EA
|
20.000
|
$7,000.000
|
$5,790.000
|
$7,462.000
|
|
|
CONDT (PVC) (SCH 80) (2")
|
LF
|
4,828.000
|
$15.000
|
$19.600
|
$35.000
|
|
|
CONDT (PVC) (SCH 80) (2") (BORE)
|
LF
|
3,392.000
|
$20.000
|
$50.000
|
$45.000
|
|
|
CONDT (PVC) (SCH 80) (3")
|
LF
|
55.000
|
$30.000
|
$24.500
|
$65.000
|
|
|
CONDT (PVC) (SCH 80) (3") (BORE)
|
LF
|
80.000
|
$30.000
|
$55.000
|
$138.000
|
|
|
CONDT (RM) (1")
|
LF
|
215.000
|
$25.000
|
$37.000
|
$50.000
|
|
|
ELEC CONDR (NO.8) BARE
|
LF
|
135.000
|
$4.000
|
$2.300
|
$3.000
|
|
|
ELEC CONDR (NO.8) INSULATED
|
LF
|
405.000
|
$8.000
|
$2.450
|
$3.000
|
|
|
ELEC CONDR (NO.6) BARE
|
LF
|
8,046.000
|
$2.500
|
$2.400
|
$3.500
|
|
|
ELEC CONDR (NO.6) INSULATED
|
LF
|
16,092.000
|
$2.700
|
$2.800
|
$3.500
|
|
|
GROUND BOX TY A (122311)
|
EA
|
2.000
|
$1,248.390
|
$1,460.000
|
$1,548.000
|
|
|
GROUND BOX TY A (122311)W/APRON
|
EA
|
19.000
|
$1,382.850
|
$1,770.000
|
$2,308.000
|
|
|
GROUND BOX TY D (162922)
|
EA
|
1.000
|
$1,700.000
|
$1,740.000
|
$2,093.000
|
|
|
GROUND BOX TY D (162922)W/APRON
|
EA
|
1.000
|
$2,000.000
|
$2,070.000
|
$2,308.000
|
|
|
ELC SRV TY D 120/240 060(NS)SS(E)SP(O)
|
EA
|
1.000
|
$10,000.000
|
$6,300.000
|
$11,584.000
|
|
|
ALUMINUM SIGNS (TY G)
|
SF
|
96.000
|
$32.000
|
$30.750
|
$27.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
|
EA
|
14.000
|
$780.000
|
$669.000
|
$750.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
|
EA
|
17.000
|
$820.000
|
$782.000
|
$850.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SB(P)
|
EA
|
2.000
|
$750.000
|
$736.000
|
$850.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SB(T)
|
EA
|
17.000
|
$825.000
|
$888.000
|
$990.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SB(U)
|
EA
|
2.000
|
$850.000
|
$1,010.000
|
$990.000
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(U-BM)
|
EA
|
5.000
|
$1,250.000
|
$1,140.000
|
$1,500.000
|
|
|
IN SM RD SN SUP&AM TYS80(1)SB(U-2EXT)
|
EA
|
2.000
|
$850.000
|
$1,600.000
|
$1,500.000
|
|
|
IN BRIDGE MNT CLEARANCE SGN ASSM(TY N)
|
EA
|
6.000
|
$2,800.000
|
$3,440.000
|
$2,750.000
|
|
|
REMOVE SM RD SN SUP&AM
|
EA
|
30.000
|
$110.000
|
$50.000
|
$100.000
|
|
|
INSTALL LRSS (STRUCT STEEL)
|
LB
|
726.800
|
$8.000
|
$7.750
|
$9.000
|
|
|
INSTL DEL ASSM (D-SW)SZ 1(WFLX)GND
|
EA
|
37.000
|
$80.000
|
$123.000
|
$90.000
|
|
|
INSTL DEL ASSM (D-SW)SZ 1(BRF)CTB
|
EA
|
46.000
|
$7.300
|
$37.500
|
$100.000
|
|
|
INSTL DEL ASSM (D-SY)SZ 1(BRF)CTB (BI)
|
EA
|
37.000
|
$5.000
|
$38.000
|
$90.000
|
|
|
INSTL DEL ASSM (D-DW)SZ 1(WFLX)GND
|
EA
|
14.000
|
$86.000
|
$124.000
|
$90.000
|
|
|
INSTL OM ASSM (OM-2Z)(WFLX)GND
|
EA
|
94.000
|
$100.000
|
$128.000
|
$90.000
|
|
|
REMOVE DELIN & OBJECT MARKER ASSMS
|
EA
|
11.000
|
$25.000
|
$15.000
|
$20.000
|
|
|
INSTL OM ASSM (OM-2Z)(WFLX)GNDHH
|
EA
|
28.000
|
$160.000
|
$210.000
|
$190.000
|
|
|
INSTL OM SM RD SIGN (1-OM-PW)Y
|
EA
|
53.000
|
$10.500
|
$8.500
|
$15.000
|
|
|
INSTL OM SM RD SIGN (1-OM-PW)R
|
EA
|
14.000
|
$10.500
|
$8.500
|
$15.000
|
|
|
WK ZN PAV MRK NON-REMOV (W)6"(BRK)
|
LF
|
16,808.000
|
$0.400
|
$0.250
|
$0.200
|
|
|
WK ZN PAV MRK NON-REMOV (W)6"(SLD)
|
LF
|
127,305.000
|
$0.350
|
$0.250
|
$0.200
|
|
|
WK ZN PAV MRK NON-REMOV (W)8"(SLD)
|
LF
|
15,780.000
|
$0.900
|
$0.300
|
$0.200
|
|
|
WK ZN PAV MRK NON-REMOV (W)12"(SLD)
|
LF
|
890.000
|
$1.100
|
$5.850
|
$0.970
|
|
|
WK ZN PAV MRK NON-REMOV(W)36"(YLD TRI)
|
EA
|
60.000
|
$20.000
|
$25.800
|
$26.000
|
|
|
WK ZN PAV MRK NON-REMOV (Y)6"(SLD)
|
LF
|
123,870.000
|
$0.300
|
$0.250
|
$0.200
|
|
WK ZN PAV MRK SHT TERM (TAB)TY W
|
EA
|
2,160.000
|
$1.400
|
$1.500
|
$2.000
|
|
WK ZN PAV MRK SHT TERM (TAB)TY Y-2
|
EA
|
1,865.000
|
$1.200
|
$1.500
|
$2.000
|
|
REFL PAV MRK TY I (W)8"(DOT)(100MIL)
|
LF
|
114.000
|
$1.300
|
$1.250
|
$1.400
|
|
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
|
LF
|
5,030.000
|
$1.150
|
$1.000
|
$1.200
|
|
REFL PAV MRK TY I(Y)(MED NOSE)(100MIL)
|
EA
|
2.000
|
$290.670
|
$500.000
|
$500.000
|
|
TY I HIGH PERF PM (W)6"(BRK)(100MIL)
|
LF
|
6,188.000
|
$0.700
|
$0.750
|
$0.800
|
|
TY I HIGH PERF PM (W)6"(SLD)(100MIL)
|
LF
|
28,805.000
|
$0.700
|
$0.700
|
$0.800
|
|
TY I HIGH PERF PM (Y)6"(SLD)(100MIL)
|
LF
|
28,410.000
|
$0.700
|
$0.700
|
$0.800
|
|
PREFAB PM TY C (W)(12")(SLD)
|
LF
|
890.000
|
$11.000
|
$11.000
|
$8.000
|
|
PREFAB PM TY C (W)(24")(SLD)
|
LF
|
230.000
|
$15.000
|
$16.000
|
$14.000
|
|
PREFAB PM TY C (W)(ARROW)
|
EA
|
4.000
|
$250.000
|
$300.000
|
$250.000
|
|
PREFAB PM TY C (W)(DBL ARROW)
|
EA
|
4.000
|
$275.000
|
$400.000
|
$326.190
|
|
PREFAB PM TY C (W)(UTURN ARROW)
|
EA
|
4.000
|
$320.000
|
$450.000
|
$455.000
|
|
PREFAB PM TY C (W)(36")(YLD TRI)
|
EA
|
34.000
|
$50.000
|
$65.000
|
$45.000
|
|
REFL PAV MRKR TY I-C
|
EA
|
70.000
|
$4.000
|
$7.000
|
$4.750
|
|
REFL PAV MRKR TY II-A-A
|
EA
|
22.000
|
$4.250
|
$7.000
|
$4.740
|
|
REFL PAV MRKR TY II-C-R
|
EA
|
144.000
|
$4.500
|
$7.000
|
$4.750
|
|
|
ELIM EXT PM & MRKS (6")
|
LF
|
48,100.000
|
$0.400
|
$0.850
|
$0.350
|
|
|
ELIM EXT PM & MRKS (24") (CALLOUT)
|
LF
|
660.000
|
$5.000
|
$5.000
|
$4.700
|
|
|
PAV SURF PREP FOR MRK (12")
|
LF
|
890.000
|
$0.400
|
$7.800
|
$0.550
|
|
|
PAV SURF PREP FOR MRK (24")
|
LF
|
230.000
|
$1.150
|
$2.750
|
$0.750
|
|
|
PAV SURF PREP FOR MRK (ARROW)
|
EA
|
12.000
|
$25.000
|
$100.000
|
$50.000
|
|
|
PAV SURF PREP FOR MRK (36")(YLD TRI)
|
EA
|
34.000
|
$17.000
|
$25.000
|
$40.000
|
|
|
REMOV RDSD FLSH BCN AM (SOLAR PWRD)
|
EA
|
2.000
|
$800.000
|
$2,850.000
|
$100.000
|
|
|
REMOVAL OF TRAFFIC SIGNAL POLE FND
|
LF
|
4.000
|
$500.000
|
$810.000
|
$100.000
|
|
|
SALVAGE TRAFFIC SIGNAL
|
EA
|
2.000
|
$1,500.000
|
$2,850.000
|
$2,274.000
|
|
|
FULL - WIDTH MOWING
|
CYC
|
4.000
|
$4,000.000
|
$6,300.000
|
$442.000
|
|
|
LITTER REMOVAL
|
CYC
|
4.000
|
$2,000.000
|
$3,700.000
|
$2,204.000
|
|
|
CLEANING / SWEEPING(ENTRANCE/EXIT RAMP)
|
CYC
|
4.000
|
$1,400.000
|
$1,600.000
|
$1,500.000
|
|
|
REINFORCED FAB FOR ASPH PVMNT OVERLAYS
|
SY
|
59,684.000
|
$6.500
|
$6.100
|
$7.000
|
|
|
ASPH FOR REINF FAB (PG76-28)
|
GAL
|
8,953.000
|
$4.250
|
$2.950
|
$3.400
|
|
|
INSTALL BRIDGE IDENTIFICATION NUMBERS
|
EA
|
4.000
|
$1,000.000
|
$1,030.000
|
$500.000
|
|
|
ITS POLE(40 FT)(110 MPH)(W/STIFF)
|
EA
|
1.000
|
$17,000.000
|
$20,300.000
|
$25,000.000
|
|
|
ITS POLE MNTD CAB (TY 2)(CONF 1)
|
EA
|
1.000
|
$6,650.000
|
$11,450.000
|
$25,000.000
|
|
|
TEMP SPEED MONITOR SYS
|
EA
|
1.000
|
$12,000.000
|
$17,000.000
|
$20,000.000
|
|
|
CCTV FIELD EQUIP (DIGITAL) (INSTL ONLY)
|
EA
|
1.000
|
$3,750.000
|
$3,290.000
|
$4,000.000
|
|
|
LED ROADSIDE SIGN
|
EA
|
4.000
|
$15,000.000
|
$4,450.000
|
$13,000.000
|
|
Totals: |
$17,902,518.780
|
$26,039,017.007
|
$26,829,530.294
|