LUBBOCK IH 27 (0067-11-047)

Items: 36

County: LUBBOCK
Length: N/A
Highway: IH 27
District: LUBBOCK
Control Number: 0067-11-047
DBE Goal: N/A
Project: BR 2023(286)
Guaranty: N/A
Time: 125 WORKING DAYS
Engineer's Estimate: $1,741,098.00
Date: 12/02/2022 (3 years ago)
Contract Number: N/A
Type: REHABILITATE BRIDGE
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice HCS Excel Tabs Print Print Notice
Bidders (3)
E
Engineer's Estimate
$1,741,098.00
$1,738,710.00
Over/Under Est: -0.14% -$2,388.00
Over/Under Est: 13.82% $240,632.50
Amt Left: 13.98% $243,020.50
Over/Under Est: 28.84% $502,062.00
Amt Left: 29.01% $504,450.00
Delta: -13.19% -$261,429.50

Bid Items & Bid Tabulations

36 Total 0 of 36
LUBBOCK  |  IH 27  |  LUBBOCK  |  0067-11-047  |  12/02/2022  |  $1,741,098.00  |  BR 2023(286)  |  REHAB BRIDGE  |  125 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
TI-ZACK CONCRETE, INC.
SCR CIVIL CONSTRUCTION, LLC
TALBRAN ENTERPRISES LLC
REMOVING CONC (RIPRAP)
SY 5.000 $55.000 $30.000 $125.000 $120.000
FLOWABLE BACKFILL
CY 200.000 $330.000 $700.000 $355.000 $240.000
CONC STR REPAIR(RAPID DECK REP(PRT DPT)
SF 800.000 $165.000 $100.000 $92.000 $180.000
CONC STR REPAIR(DECK REP (FULL DEPTH))
SF 300.000 $330.000 $115.000 $176.000 $230.000
CONC STR REPR(RAPID VERT AND OVERHEAD)
SF 1,200.000 $220.000 $100.000 $210.000 $180.000
CONC STR REPAIR (STANDARD)
SF 300.000 $165.000 $100.000 $210.000 $180.000
RIPRAP (CONC)(4 IN)
CY 40.000 $880.000 $500.000 $1,780.000 $900.000
ARMOR JOINT (SEALED)
LF 712.000 $165.000 $115.000 $640.000 $120.000
GABIONS (3' X 3')(GALV)
CY 14.000 $440.000 $750.000 $1,400.000 $600.000
MOBILIZATION
LS 1.000 $158,000.000 $170,000.000 $170,000.000 $200,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 8.000 $11,000.000 $5,500.000 $12,975.000 $6,500.000
TEMP SEDMT CONT FENCE (INSTALL)
LF 100.000 $11.000 $3.000 $10.000 $1.000
TEMP SEDMT CONT FENCE (REMOVE)
LF 100.000 $5.500 $3.000 $5.000 $1.000
BIODEG EROSN CONT LOGS (INSTL) (18")
LF 60.000 $11.000 $8.000 $20.000 $1.000
BIODEG EROSN CONT LOGS (REMOVE)
LF 60.000 $5.500 $8.000 $10.000 $1.000
PORT CTB (DES SOURCE)(F-SHAPE)(TY 1)
LF 2,730.000 $16.500 $35.000 $18.000 $30.000
PORT CTB (MOVE)(F-SHAPE)(TY 1)
LF 2,730.000 $7.700 $35.000 $14.500 $25.000
PORT CTB (STKPL)(F-SHAPE)(TY 1)
LF 2,730.000 $16.500 $20.000 $18.000 $25.000
MTL W-BEAM GD FEN (STEEL POST)
LF 650.000 $55.000 $80.000 $33.000 $65.000
MTL BEAM GD FEN TRANS (THRIE-BEAM)
EA 7.000 $3,850.000 $3,000.000 $2,557.500 $5,000.000
MTL BM GD FEN TRANS (NON - SYM)
EA 1.000 $2,200.000 $6,000.000 $1,237.500 $6,500.000
REMOVE METAL BEAM GUARD FENCE
LF 2,210.000 $5.500 $15.000 $3.300 $20.000
REMOVE TERMINAL ANCHOR SECTION
EA 1.000 $550.000 $1,500.000 $330.000 $1,500.000
GUARDRAIL END TREATMENT (INSTALL)
EA 7.000 $4,400.000 $4,000.000 $3,492.500 $5,500.000
GUARDRAIL END TREATMENT (REMOVE)
EA 6.000 $385.000 $1,000.000 $330.000 $3,500.000
CRASH CUSH ATTEN (MOVE & RESET)
EA 4.000 $3,300.000 $5,000.000 $3,575.000 $3,500.000
CRASH CUSH ATTEN (REMOVE)
EA 4.000 $1,650.000 $750.000 $1,650.000 $2,500.000
CRASH CUSH ATTEN (INSTL)(S)(N)(TL3)
EA 4.000 $16,500.000 $4,000.000 $10,725.000 $14,000.000
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2
EA 35.000 $55.000 $2.000 $40.000 $150.000
WK ZN PAV MRK REMOV (REFL) TY II-A-A
EA 280.000 $6.600 $5.000 $55.000 $20.000
WK ZN PAV MRK REMOV (TRAF BTN) TY W
EA 420.000 $6.600 $5.000 $33.000 $5.000
WK ZN PAV MRK REMOV (TRAF BTN) TY Y
EA 420.000 $6.600 $5.000 $33.000 $5.000
SPALLING REPAIR (POLYMERIC) (SEMIRIGID)
GAL 400.000 $110.000 $300.000 $82.000 $150.000
REPLACE ELASTOMERIC BEARING PADS
EA 62.000 $4,400.000 $7,000.000 $4,500.000 $9,000.000
PORTABLE CHANGEABLE MESSAGE SIGN
DAY 60.000 $110.000 $110.000 $125.000 $150.000
TMA (STATIONARY)
DAY 500.000 $165.000 $15.000 $10.000 $400.000
Totals: $1,741,098.000 $1,738,710.000 $1,981,730.500 $2,243,160.000