Show Job Controls
Bid Cobra

LUBBOCK IH 27 (0067-07-094)

Items: 170

County: LUBBOCK
Length: N/A
Highway: IH 27
District: LUBBOCK
Control Number: 0067-07-094
DBE Goal: N/A
Project: BR 2B23(042)
Guaranty: N/A
Time: 630 WORKING DAYS
Engineer's Estimate: $16,947,086.33
Date: 08/03/2023 (2 years ago)
Contract Number: N/A
Type: BRIDGE REPLACEMENT
Mail/Deliver Bids To: N/A
EDWARD GOEBEL
JOE VILLALOBOS
Actions:
Notice HCS Excel Tabs Print Print Notice
Bidders (2)
E
Engineer's Estimate
$16,947,086.33
1
$24,330,101.88
Over/Under Est: 43.57% $7,383,015.55
Over/Under Est: 49.59% $8,404,286.67
Amt Left: 4.2% $1,021,271.12
Subcontractor Percentage Amount
DUININCK, INC. 7.56% $1,852,184.00
190 CONSTRUCTION LLC 4.41% $1,080,440.66
TORO BRAVO CONSTRUCTION, LLC 3.03% $742,343.59
M & D FOUNDATION DRILLING INDUSTRIES, INC. 2.05% $502,245.66
ARTEX ELECTRIC, INC. 1.91% $467,945.96
HJC FARMS, INC. 1.80% $440,996.19
KING GEORGE TRAFFIC SOLUTIONS LLC 1.30% $318,497.25
LMSE TRUCKING, LLC 1.24% $303,797.38
TRP CONSTRUCTION GROUP, LLC 1.02% $249,897.84
DK CONTRACTING, LLC 0.45% $110,249.05
CABELLO CONSTRUCTION LLC 0.20% $48,999.58
BARRICADES UNLIMITED 0.20% $48,999.58
DUSTROL, INC. 0.13% $31,849.72
FUSION COMMUNICATIONS, LLC 0.11% $26,949.77
TORO BRAVO CONSTRUCTION, LLC 0.08% $19,599.83
1 PRIORITY ENVIRONMENTAL SERVICES, LLC 0.07% $17,149.85
ADRIAN CONTRACTING, INC 0.06% $14,699.87
WOLFE CONSTRUCTION GROUP, INCORPORATED 0.06% $14,699.87
SK CONCRETE SERVICES LLC 0.04% $9,799.92
Total: 25.72% $6,301,345.57

Bid Items & Bid Tabulations

170 Total 0 of 170
LUBBOCK  |  IH 27  |  LUBBOCK  |  0067-07-094  |  08/03/2023  |  $16,947,086.33  |  BR 2B23(042)  |  BRIDGE REPL  |  630 WORKING DAYS
Alt
Item Code
Description
Unit
Quantity
Engineer's Estimate
WEBBER, LLC
SACYR CONSTRUCTION USA LLC
PREPARING ROW
STA 46.000 $3,000.000 $52,173.910 $39,000.000
PREPARING ROW (TREE) (6" TO 24" DIA)
EA 73.000 $1,500.000 $1,168.150 $1,500.000
REMOVING CONC (PAV)
SY 7,925.000 $10.000 $11.540 $16.000
REMOVING CONC (RIPRAP)
SY 12,882.000 $10.000 $6.580 $14.000
REMOVING CONC (CURB AND GUTTER)
LF 3,996.000 $11.000 $10.810 $16.000
REMOVE CONC (RAIL)
LF 173.000 $15.000 $30.430 $24.000
REMOVING CONC (FLUME)
SY 60.000 $15.000 $24.180 $39.000
EXCAVATION (ROADWAY)
CY 1,711.000 $20.000 $19.720 $36.000
EMBANKMENT (FINAL)(DENS CONT)(TY C)
CY 6,057.000 $20.000 $30.410 $71.000
CELL FBR MLCH SEED(PERM)(URBAN)(SANDY)
SY 1,200.000 $0.200 $2.430 $8.000
VEGETATIVE WATERING
MG 30.000 $100.000 $95.000 $51.000
PROOF ROLLING
HR 50.000 $200.000 $153.550 $267.000
PRIME COAT (MC-30)
GAL 1,415.000 $10.000 $20.000 $17.000
FOG SEAL (CSS-1H)
GAL 1,429.000 $10.000 $15.000 $17.000
ASPH (AC-20-5TR)
GAL 5,083.000 $10.000 $15.000 $17.000
AGGR(TY-PB GR-4 SAC-B)
CY 115.000 $150.000 $500.000 $540.000
FLEXIBLE PAVEMENT STRUCTURE REPAIR(6")
SY 70.000 $70.000 $300.000 $1,150.000
FLEXIBLE PAVEMENT STRUCTURE REPAIR(3")
SY 70.000 $50.000 $200.000 $350.000
PLANE ASPH CONC PAV (2")
SY 5,638.000 $5.000 $3.660 $10.000
PLAN ASPH CONC PAV (12")
SY 3,463.000 $10.000 $15.880 $18.000
CEM STABIL BKFL
CY 722.000 $250.000 $122.760 $328.000
TRENCH EXCAVATION PROTECTION
LF 612.000 $30.000 $5.000 $5.000
DRILL SHAFT (18 IN)
LF 308.000 $180.000 $114.870 $300.000
DRILL SHAFT (36 IN)
LF 1,102.000 $325.000 $428.650 $600.000
DRILL SHAFT (60 IN)
LF 98.000 $800.000 $1,156.640 $1,400.000
DRILL SHAFT (SIGN MTS) (24 IN)
LF 24.000 $200.000 $232.330 $386.000
DRILL SHAFT (RDWY ILL POLE) (30 IN)
LF 250.000 $250.000 $185.000 $309.000
CL C CONC (ABUT)(HPC)
CY 185.400 $1,800.000 $1,441.550 $2,000.000
CL C CONC (CAP)(HPC)
CY 93.900 $1,800.000 $1,327.360 $3,000.000
CL C CONC (COLUMN)(HPC)
CY 108.800 $1,800.000 $1,610.020 $3,100.000
CL C CONC (RAIL FOUNDATION)
CY 733.100 $600.000 $584.610 $1,100.000
CL F CONC (COLUMN)(HPC)
CY 75.900 $2,000.000 $1,180.160 $2,400.000
CL F CONC (FOOTING)(HPC)
CY 24.400 $2,000.000 $1,453.890 $2,000.000
CL C CONC (CAP)(INVT)(HPC)
CY 125.200 $1,800.000 $1,252.750 $2,500.000
CL F CONC (CAP)(STRDL)(HPC)
CY 138.000 $1,800.000 $1,309.770 $2,800.000
REINF CONC SLAB
SF 44,380.000 $32.000 $60.000 $44.000
BRIDGE SIDEWALK
SF 3,840.000 $30.000 $21.860 $20.000
APPROACH SLAB
CY 209.300 $600.000 $887.620 $1,000.000
PRESTR CONC GIRDER (TX40)
LF 2,593.080 $250.000 $491.150 $360.000
PRESTR CONC GIRDER (TX46)
LF 3,340.340 $250.000 $508.200 $365.000
EPOXY WATERPROOF FINISH (TY X)
SF 7,740.000 $15.000 $7.770 $13.000
RIPRAP (CONC)(4 IN)
CY 461.800 $600.000 $495.000 $840.000
RIPRAP (CONC)(CL B)(RR8&RR9)
CY 765.000 $700.000 $550.000 $969.000
RAIL (TY SSTR)
LF 5,533.000 $90.000 $69.360 $125.000
RAIL (TY C411)
LF 751.700 $120.000 $231.020 $500.000
SEALED EXPANSION JOINT (4 IN) (SEJ - M)
LF 394.000 $220.000 $211.260 $332.000
RC PIPE (CL III)(18 IN)
LF 434.000 $200.000 $102.170 $200.000
RC PIPE (CL III)(24 IN)
LF 178.000 $250.000 $143.630 $225.000
INLET (COMPL)(PCO)(5FT)(NONE)
EA 3.000 $10,000.000 $8,629.270 $10,700.000
INLET (COMPL)(PCO)(5FT)(RIGHT)
EA 3.000 $10,000.000 $8,537.680 $11,100.000
INLET (COMPL)(PSL)(FG)(3FTX3FT-3FTX3FT)
EA 1.000 $10,000.000 $8,740.290 $11,500.000
INLET (COMPL)(PSL)(FG)(4FTX5FT-3FTX5FT)
EA 1.000 $10,000.000 $8,641.650 $16,000.000
ADJUSTING MANHOLES
EA 2.000 $2,000.000 $2,240.920 $2,000.000
REMOV STR (INLET)
EA 5.000 $2,000.000 $1,156.480 $3,000.000
REMOV STR (PIPE)
LF 203.000 $30.000 $37.550 $85.000
REMOV STR (BRIDGE 100 - 499 FT LENGTH)
EA 3.000 $250,000.000 $1,000,000.000 $400,000.000
MOBILIZATION
LS 1.000 $1,541,000.000 $2,400,000.000 $2,520,947.450
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 44.000 $20,000.000 $1,515.500 $5,000.000
CONSTRUCTION EXITS (INSTALL) (TY 3)
SY 1,270.000 $50.000 $36.280 $67.000
CONSTRUCTION EXITS (REMOVE)
SY 635.000 $16.000 $15.170 $15.000
SANDBAGS FOR EROSION CONTROL
EA 600.000 $11.000 $26.700 $28.000
TEMP SEDMT CONT FENCE (INSTALL)
LF 900.000 $5.000 $8.260 $25.000
TEMP SEDMT CONT FENCE (REMOVE)
LF 450.000 $1.000 $1.030 $5.000
BIODEG EROSN CONT LOGS (INSTL) (18")
LF 1,500.000 $6.000 $8.260 $20.000
BIODEG EROSN CONT LOGS (REMOVE)
LF 750.000 $1.000 $1.030 $5.000
PORT CTB (FUR & INST)(SGL SLOPE)(TY 1)
LF 2,340.000 $80.000 $33.380 $300.000
PORT CTB (MOVE)(SGL SLP)(TY 1)
LF 270.000 $15.000 $9.580 $26.000
PORT CTB (REMOVE)(SGL SLP)(TY 1)
LF 2,340.000 $20.000 $11.670 $10.000
PERM CTB (SGL SLOPE) (TY 3) (54 )
LF 173.000 $200.000 $288.780 $500.000
CONC CURB & GUTTER (TY II)
LF 4,672.000 $45.000 $25.500 $53.000
CONC CURB (SLOTTED)
LF 87.000 $70.000 $35.000 $130.000
DRIVEWAYS (CONC)
SY 140.000 $110.000 $75.000 $156.000
CURB RAMPS (TY 1)
SY 9.000 $250.000 $3,200.000 $275.000
CURB RAMPS (TY 2)
SY 46.000 $250.000 $3,550.000 $202.000
REMOVE METAL BEAM GUARD FENCE
LF 2,515.000 $15.000 $2.000 $5.000
REMOVE DOWNSTREAM ANCHOR TERMINAL
EA 8.000 $500.000 $200.000 $500.000
GUARDRAIL END TREATMENT (REMOVE)
EA 8.000 $1,000.000 $200.000 $500.000
CRASH CUSH ATTEN (MOVE & RESET)
EA 1.000 $2,000.000 $2,500.000 $4,500.000
CRASH CUSH ATTEN (REMOVE)
EA 6.000 $1,000.000 $1,500.000 $2,500.000
CRASH CUSH ATTEN (INSTL)(L)(N)(TL3)
EA 8.000 $30,000.000 $33,000.000 $56,621.000
CRASH CUSH ATTEN (INSTL)(S)(N)(TL3)
EA 6.000 $12,000.000 $7,500.000 $12,868.000
MAILBOX INSTALL-S (TWW-POST) TY 4
EA 2.000 $500.000 $350.000 $601.000
RELOCATE RD IL ASM (CTB MOUNT)
EA 2.000 $1,000.000 $1,750.000 $2,928.000
REMOVE RD IL ASM (TRANS-BASE)
EA 23.000 $700.000 $500.000 $836.000
IN RD IL (U/P) (TY 1) (150W EQ) LED
EA 4.000 $4,000.000 $1,600.000 $2,677.000
IN RD IL (TY SA) 50B-12 (400W EQ) LED
EA 2.000 $6,000.000 $4,850.000 $8,113.000
IN RD IL (TY SA) 50T-12 (400W EQ) LED
EA 25.000 $5,000.000 $4,900.000 $8,197.000
CONDT (PVC) (SCH 80) (2")
LF 4,695.000 $12.000 $10.250 $17.000
CONDT (PVC) (SCH 80) (2") (BORE)
LF 375.000 $30.000 $17.500 $29.000
CONDT (RM) (3")
LF 1,235.000 $50.000 $46.500 $78.000
ELEC CONDR (NO.4) BARE
LF 7,025.000 $2.300 $2.520 $4.000
ELEC CONDR (NO.4) INSULATED
LF 14,050.000 $2.500 $3.120 $4.000
GROUND BOX TY A (122311)W/APRON
EA 15.000 $1,200.000 $1,336.690 $1,506.000
ELC SRV TY A 240/480 100(NS)SS(E)SP(U)
EA 3.000 $8,000.000 $1,500.000 $11,292.000
ALUMINUM SIGNS (TY A)
SF 33.750 $100.000 $32.000 $55.000
ALUMINUM SIGNS (TY G)
SF 192.500 $50.000 $32.000 $55.000
ALUMINUM SIGNS (TY O)
SF 91.000 $50.000 $32.000 $55.000
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
EA 3.000 $1,000.000 $925.000 $1,587.000
IN SM RD SN SUP&AM TY10BWG(1)SA(P-BM)
EA 2.000 $1,000.000 $1,300.000 $2,231.000
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
EA 32.000 $1,000.000 $990.000 $1,699.000
IN SM RD SN SUP&AM TYS80(1)SA(T)
EA 2.000 $1,000.000 $1,400.000 $2,402.000
IN SM RD SN SUP&AM TYS80(1)SA(U)
EA 1.000 $1,000.000 $1,960.000 $3,363.000
REMOVE SM RD SN SUP&AM
EA 31.000 $100.000 $100.000 $172.000
IN SRSS & AM (RAIL)(130 MPH)(U MOUNT)
EA 2.000 $1,000.000 $10,000.000 $17,158.000
IN SM RD SN SUP&AM TYS80(1)SA(P-1EXT)
EA 8.000 $1,000.000 $2,160.000 $3,706.000
INSTALL LRSS (STRUCT STEEL)
LB 1,187.000 $10.000 $8.000 $14.000
REMOVE LRSA
EA 2.000 $1,500.000 $1,500.000 $2,574.000
INSTL DEL ASSM (D-SW)SZ (BRF)CTB
EA 14.000 $100.000 $19.000 $33.000
REMOVE DELIN & OBJECT MARKER ASSMS
EA 77.000 $30.000 $15.000 $26.000
INSTL DEL ASSM (D-SW)SZ (BRF)CTB (BR)
EA 43.000 $100.000 $19.000 $33.000
INSTL DEL ASSM (D-SY)SZ (BRF)CTB (BR)
EA 47.000 $100.000 $19.000 $33.000
INSTL OM ASSM (OM-2Z)(WFLX)GND
EA 6.000 $100.000 $150.000 $257.000
WK ZN PAV MRK REMOV (TRAF BTN) TY W
LF 16,100.000 $3.000 $1.000 $2.000
WK ZN PAV MRK REMOV (TRAF BTN) TY Y
LF 16,280.000 $3.000 $1.000 $2.000
WK ZN PAV MRK SHT TERM (TAB)TY W
EA 455.000 $1.000 $2.260 $11.000
WK ZN PAV MRK SHT TERM (TAB)TY Y-2
EA 250.000 $1.000 $2.720 $11.000
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
LF 1,054.000 $0.600 $1.550 $3.000
PAVEMENT SEALER 6"
LF 3,751.000 $0.300 $0.160 $0.300
PAVEMENT SEALER 8"
LF 1,054.000 $0.500 $0.240 $0.400
RE PM W/RET REQ TY I (W)6"(BRK)(100MIL)
LF 1,412.000 $0.600 $0.660 $1.000
RE PM W/RET REQ TY I (W)6"(SLD)(100MIL)
LF 104.000 $0.600 $0.660 $1.000
RE PM W/RET REQ TY I (Y)6"(SLD)(100MIL)
LF 1,888.000 $0.600 $0.660 $1.000
PREFAB PAV MRK TY B (W)(6")(BRK)
LF 851.000 $15.000 $7.500 $13.000
PREFAB PAV MRK TY B (W)(6")(SLD)
LF 6,750.000 $15.000 $7.500 $13.000
PREFAB PAV MRK TY B (W)(6")(BRK)CNTST
LF 1,380.000 $15.000 $18.000 $31.000
PREFAB PAV MRK TY B (W)(8")(SLD)
LF 331.000 $20.000 $12.000 $21.000
PREFAB PAV MRK TY B (W)(12")(LNDP)
LF 225.000 $20.000 $16.000 $27.000
PREFAB PAV MRK TY B (W)(12")(SLD)
LF 1,750.000 $20.000 $16.000 $27.000
PREFAB PAV MRK TY B (W)(24")(SLD)
LF 214.000 $15.000 $36.000 $62.000
PREFAB PAV MRK TY B (W)(ARROW)
EA 4.000 $500.000 $650.000 $1,112.000
PREFAB PAV MRK TY B (W)(DBL ARROW)
EA 2.000 $600.000 $1,100.000 $1,882.000
PREFAB PAV MRK TY B (W)(WORD)
EA 1.000 $600.000 $815.000 $1,394.000
PREFAB PAV MRK TY B (Y)(6")(SLD)
LF 7,795.000 $15.000 $7.250 $12.000
PREFAB PAV MRK TY C (W) (12") (LNDP)
LF 126.000 $20.000 $6.750 $12.000
PREFAB PAV MRK TY C (W) (12") (SLD)
LF 104.000 $20.000 $6.750 $12.000
PREFAB PAV MRK TY C (W) (24") (SLD)
LF 93.000 $20.000 $14.000 $24.000
PREFAB PAV MRK TY C (W) (ARROW)
EA 4.000 $500.000 $199.000 $340.000
REFL PAV MRKR TY I-C
EA 41.000 $4.000 $6.500 $11.000
REFL PAV MRKR TY II-A-A
EA 32.000 $4.000 $6.500 $11.000
REFL PAV MRKR TY II-C-R
EA 52.000 $4.000 $6.500 $11.000
ELIM EXT PAV MRK & MRKS (6")
LF 17,490.000 $1.000 $0.450 $1.000
PAV SURF PREP FOR MRK (6")
LF 19,958.000 $1.000 $0.170 $0.300
PAV SURF PREP FOR MRK (8")
LF 514.000 $1.500 $0.230 $0.400
PAV SURF PREP FOR MRK (10")
LF 5,505.000 $1.600 $0.330 $1.000
PAV SURF PREP FOR MRK (12")
LF 3,229.000 $1.750 $0.450 $1.000
PAV SURF PREP FOR MRK (24")
LF 474.000 $2.000 $0.670 $1.000
PAV SURF PREP FOR MRK (ARROW)
EA 4.000 $20.000 $30.000 $51.000
PAV SURF PREP FOR MRK (DBL ARROW)
EA 2.000 $40.000 $30.000 $51.000
PAV SURF PREP FOR MRK (WORD)
EA 1.000 $40.000 $30.000 $51.000
FULL - WIDTH MOWING
CYC 8.000 $6,000.000 $7,000.000 $4,000.000
LITTER REMOVAL
CYC 8.000 $4,000.000 $5,000.000 $2,500.000
CLEANING / SWEEPING (FRONTAGE ROAD)
CYC 22.000 $1,500.000 $5,000.000 $4,900.000
TACK COAT
GAL 1,334.000 $10.000 $407.000 $10.000
TACK COAT
GAL 1,359.000 $10.000 $0.010 $10.000
INSTALL BRIDGE IDENTIFICATION NUMBERS
EA 6.000 $250.000 $700.000 $836.000
ASBESTOS ABATEMENT (OTHER)
SF 48.000 $250.000 $359.500 $650.000
PORTABLE CHANGEABLE MESSAGE SIGN
DAY 5,280.000 $50.000 $21.380 $24.000
TMA (STATIONARY)
DAY 1,260.000 $150.000 $125.000 $400.000
TMA (MOBILE OPERATION)
DAY 60.000 $900.000 $785.170 $1,000.000
TEMP SPEED MONITOR SYS
EA 2.000 $20,000.000 $16,416.670 $8,000.000
LED ROADSIDE SIGN
EA 7.000 $2,000.000 $15,000.000 $8,000.000
1
FL BS (CMP IN PLC)(TY A GR 4) (6")
SY 7,079.000 $44.540 $11.310 $43.000
1
CONC PVMT (CONT REINF - CRCP) (10")
SY 9,264.000 $120.880 $145.470 $138.000
1
CONC PVMT(CRCP)(TRANSITION SLAB)
SY 240.000 $200.000 $220.410 $302.000
1
D-GR HMA TY-B PG76-28
TON 4,494.000 $200.000 $272.000 $250.000
1
STONE-MTRX-ASPH SMA-D SAC-A PG76-28
TON 1,147.000 $300.000 $395.000 $300.000
1A
CONC PVMT (CONT REINF - CRCP) (10")
SY 14,786.000 $120.880 $0.000 $0.000
1A
CONC PVMT(CRCP)(TRANSITION SLAB)
SY 335.000 $200.000 $0.000 $0.000
1A
D-GR HMA TY-B PG76-28
TON 3,751.000 $200.000 $0.000 $0.000
1A
STONE-MTRX-ASPH SMA-D SAC-A PG76-28
TON 405.000 $300.000 $0.000 $0.000
Totals: $19,673,118.010 $24,330,101.921 $25,351,373.000